096513_FL-RESILIENT_BASE_AND_ACCESSORIES.pdf

PDF 24 KB Posted

Attached to
Chicopee Armory Renovations General Contractor Bids
Solicitation number
S124834-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is a technical specification for the installation of resilient base and accessories in the Chicopee Armory Rehabilitation project, located in Chicopee, Massachusetts. The project involves the installation of resilient base, including thermoplastic rubber base with a low luster finish in 4-inch heights. The work includes preparation of the substrate, application of the resilient base, and cleaning and protecting the installed products. The project is open for competitive bids from general contractors, with the bid documents issued on 05/20/11. The contract term and any renewal options are not specified.

The specification provides details on the required product characteristics, such as compliance with ASTM standards, manufacturing method, and color selection. It also outlines the installation requirements, including maintaining proper ambient temperatures, filling cracks and depressions, and ensuring a smooth substrate. The specification does not mention any pricing terms, set-asides, incumbents, funding sources, or other financial details.

View the file

Other files

File Type Posted
AE121-10090.pdf PDF
ED101-10090.pdf PDF
Sub_Bid_Result_Chicopee_2011.xls XLS spreadsheet
AE102-10090.pdf PDF
Business_Reference_Form_GC_Chicopee2011.doc DOC document
230719_hvac_pipe_ins.pdf PDF
EP651-10090.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical.doc DOC document
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows.doc DOC document
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
014000_FL-QUALITY_REQUIREMENTS.pdf PDF
236313_air_cooled_condensers.pdf PDF
AE311-10090.pdf PDF
020800_Asbestos_Technical_Specifications.pdf PDF
E-601-10090.pdf PDF
230001-HVAC_FSB.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors.doc DOC document
017900_FL-DEMONSTRATION_AND_TRAINING.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
AE401-10090.pdf PDF
SF502-10090.pdf PDF
070002-ROOFING_AND_FLASHING_FSB.pdf PDF
265100_Lighting_Fixtures.pdf PDF
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE.pdf PDF
220001-PLUMBING-FSB.pdf PDF
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION.pdf PDF
238900_Louvers_and_Vents.pdf PDF
SF101-10090.pdf PDF
016000_FL-PRODUCT_REQUIREMENTS.pdf PDF
M-651-10090.pdf PDF
GI001-10090.pdf PDF
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011.doc DOC document
093000_FL-TILING_v1.pdf PDF
088000_FL-GLAZING_v1.pdf PDF
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1.pdf PDF
231123_fuel_gas_piping.pdf PDF
PL101-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
224000_plumbing_fixtures_JPB.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
220100_plumbing_requirements_JPB.pdf PDF
232113_hydronic_piping.pdf PDF
EL101-10090.pdf PDF
232300_refrigerant_piping.pdf PDF
General_Bid_Tabulation_Chicopee_2011.xls XLS spreadsheet
220500_plumbing_materials_JPB.pdf PDF
262413_Switchboards.pdf PDF
092216_FL-NON-STRUCTURAL_META_FRAMING_v1.pdf PDF
X-100_SURVEY_CONTROL_PLAN.pdf PDF
AE611-10090.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101

CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11

10090 RESILIENT BASE AND ACCESSORIES 096513 - 1

SECTION 096513

RESILIENT BASE AND ACCESSORIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Resilient base.

B. Related Sections:

1. Section 096519 "Resilient Tile Flooring" for resilient floor tile.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Samples for Initial Selection: For each type of product indicated.

C. Samples for Verification: For each type of product indicated, in manufacturer's standard-size

Samples but not less than 12 inches long, of each resilient product color, texture, and pattern required.

D. Product Schedule: For resilient products.[ Use same designations indicated on Drawings.

1.4 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: As determined by testing identical products according to

ASTM E 648 or NFPA 253 by a qualified testing agency.

1. Critical Radiant Flux Classification: Class I, not less than 0.45 W/sq. cm.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Store resilient products and installation materials in dry spaces protected from the weather, with ambient temperatures maintained within range recommended by manufacturer, but not less than

50 deg F or more than 90 deg F.

10090 RESILIENT BASE AND ACCESSORIES 096513 - 2

1.6 PROJECT CONDITIONS

A. Maintain ambient temperatures within range recommended by manufacturer, but not less than

70 deg F or more than 95 deg F, in spaces to receive resilient products during the following time periods:

1. 48 hours before installation.

2. During installation.

3. 48 hours after installation.

B. Until Substantial Completion, maintain ambient temperatures within range recommended by manufacturer, but not less than 55 deg F or more than 95 deg F.

C. Install resilient products after other finishing operations, including painting, have been completed.

PART 2 - PRODUCTS

2.1 RESILIENT BASE

A. Resilient Base:

1. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:

a. Armstrong World Industries, Inc.

b. Burke Mercer Flooring Products; Division of Burke Industries, Inc.

c. Flexco, Inc.

d. Johnsonite.

e. Mondo Rubber International, Inc.

f. Nora Rubber Flooring; Freudenberg Building Systems, Inc.

g. Roppe Corporation, USA.

B. Resilient Base Standard: ASTM F 1861.

1. Material Requirement: Type TP (rubber, thermoplastic).

2. Manufacturing Method: Group II (layered).

3. Style: Cove (base with toe).

C. Minimum Thickness: 0.125 inch .

D. Height: 4 inches.

E. Lengths: Coils in manufacturer's standard length.

F. Outside Corners: Preformed.

G. Inside Corners: Job formed or preformed.

H. Finish: Low luster.

http://www.specagent.com/LookUp/?ulid=6279&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830765&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830766&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830769&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830770&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830771&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830773&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456830775&mf=04&src=wd

10090 RESILIENT BASE AND ACCESSORIES 096513 - 3

I. Colors and Patterns: As selected by Architect from full range of industry colors.

2.2 INSTALLATION MATERIALS

A. Trowelable Leveling and Patching Compounds: Latex-modified, portland cement based or blended hydraulic-cement-based formulation provided or approved by manufacturer for applications indicated.

B. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated.

1. Adhesives shall have a VOC content of 50 g/L or less when calculated according to

40 CFR 59, Subpart D (EPA Method 24

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Verify that finishes of substrates comply with tolerances and other requirements specified in other Sections and that substrates are free of cracks, ridges, depressions, scale, and foreign deposits that might interfere with adhesion of resilient products.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Prepare substrates according to manufacturer's written instructions to ensure adhesion of resilient products.

B. Fill cracks, holes, and depressions in substrates with trowelable leveling and patching compound and remove bumps and ridges to produce a uniform and smooth substrate.

C. Do not install resilient products until they are same temperature as the space where they are to be installed.

1. Move resilient products and installation materials into spaces where they will be installed at least 48 hours in advance of installation.

D. Sweep and vacuum clean substrates to be covered by resilient products immediately before installation.

3.3 RESILIENT BASE INSTALLATION

A. Comply with manufacturer's written instructions for installing resilient base.

10090 RESILIENT BASE AND ACCESSORIES 096513 - 4

B. Apply resilient base to walls, columns, pilasters, casework and cabinets in toe spaces, and other permanent fixtures in rooms and areas where base is required.

C. Install resilient base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned.

D. Tightly adhere resilient base to substrate throughout length of each piece, with base in continuous contact with horizontal and vertical substrates.

E. Do not stretch resilient base during installation.

F. On masonry surfaces or other similar irregular substrates, fill voids along top edge of resilient base with manufacturer's recommended adhesive filler material.

G. Preformed Corners: Install preformed corners before installing straight pieces.

H. Job-Formed Corners:

1. Outside Corners: Use straight pieces of maximum lengths possible. Form without producing discoloration (whitening) at bends.

2. Inside Corners: Use straight pieces of maximum lengths possible.

3.4 CLEANING AND PROTECTION

A. Comply with manufacturer's written instructions for cleaning and protection of resilient products.

B. Perform the following operations immediately after completing resilient product installation:

1. Remove adhesive and other blemishes from exposed surfaces.

2. Sweep and vacuum surfaces thoroughly.

3. Damp-mop surfaces to remove marks and soil.

C. Protect resilient products from mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during remainder of construction period.

D. Cover resilient products until Substantial Completion.