090005-RESILIENT_FLOORS_FSB.pdf

PDF 53 KB Posted

Attached to
Chicopee Armory Renovations General Contractor Bids
Solicitation number
S124834-vCurrent
Issued by
Hampden County, Massachusetts

About this file

This document is a specification section for resilient flooring work as part of the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The work is described in Section 096513 "Resilient Base and Accessories" and Section 096519 "Resilient Tile Flooring". The resilient flooring work is a filed sub-bid required as part of this project. The project drawings referenced are GI001, AE101, and AE601. Alternates are referenced in Section 012300.

The specification does not provide details on pricing, set asides, incumbents, funding, or other commercial terms. It focuses solely on the technical requirements and scope of the resilient flooring work as a filed sub-bid for the overall Chicopee Armory Rehabilitation project being procured by the Massachusetts Military Division.

View the file

Other files

File Type Posted
AE121-10090.pdf PDF
ED101-10090.pdf PDF
Sub_Bid_Result_Chicopee_2011.xls XLS spreadsheet
AE102-10090.pdf PDF
Business_Reference_Form_GC_Chicopee2011.doc DOC document
230719_hvac_pipe_ins.pdf PDF
EP651-10090.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Electrical.doc DOC document
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Metal_Windows.doc DOC document
013200_FL-CONSTRUCTION_PROGRESS_DOCUMENTATION.pdf PDF
014000_FL-QUALITY_REQUIREMENTS.pdf PDF
236313_air_cooled_condensers.pdf PDF
AE311-10090.pdf PDF
020800_Asbestos_Technical_Specifications.pdf PDF
E-601-10090.pdf PDF
230001-HVAC_FSB.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Resilient_Floors.doc DOC document
017900_FL-DEMONSTRATION_AND_TRAINING.pdf PDF
Ch_149_FORM_FOR_SUB_BID_MIL_Chicopee2011_Masonry.doc DOC document
AE401-10090.pdf PDF
SF502-10090.pdf PDF
070002-ROOFING_AND_FLASHING_FSB.pdf PDF
265100_Lighting_Fixtures.pdf PDF
030130_FL-MAINTENANCE_OF_CAST-IN-PLACE_CONCRETE.pdf PDF
220001-PLUMBING-FSB.pdf PDF
013100_FL-PROJECT_MANAGEMENT_AND_COORDINATION.pdf PDF
238900_Louvers_and_Vents.pdf PDF
SF101-10090.pdf PDF
016000_FL-PRODUCT_REQUIREMENTS.pdf PDF
M-651-10090.pdf PDF
GI001-10090.pdf PDF
Ch_149_FORM_FOR_GENERAL_BID_MIL_Chicopee2011.doc DOC document
093000_FL-TILING_v1.pdf PDF
088000_FL-GLAZING_v1.pdf PDF
081113_FL-HOLLOW_METAL_DOORS_AND_FRAMES_v1.pdf PDF
231123_fuel_gas_piping.pdf PDF
PL101-10090.pdf PDF
230900_hvac_instrumentation_controls.pdf PDF
224000_plumbing_fixtures_JPB.pdf PDF
061600_FL-SHEATHING_v1.pdf PDF
220100_plumbing_requirements_JPB.pdf PDF
232113_hydronic_piping.pdf PDF
EL101-10090.pdf PDF
232300_refrigerant_piping.pdf PDF
General_Bid_Tabulation_Chicopee_2011.xls XLS spreadsheet
220500_plumbing_materials_JPB.pdf PDF
262413_Switchboards.pdf PDF
092216_FL-NON-STRUCTURAL_META_FRAMING_v1.pdf PDF
X-100_SURVEY_CONTROL_PLAN.pdf PDF
AE611-10090.pdf PDF
Show 40 more

Latest 50 of 185 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985010

CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11

10090 RESILIENT FLOORS 090005 - 1

SECTION 090005

RESILIENT FLOORS

(Filed Sub-Bid Required)

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. General provisions of the Contract, including General and Supplementary Conditions and

Division 1 Specification Sections, apply to this Section.

B. Time, manner and requirements for submitting sub-bids is as described in Massachusetts

Military Division provided Division 0 documents.

1.2 SUMMARY

A. Work Included: Provide labor, materials and equipment necessary to complete the work of this filed sub-bid. Work is described by but not limited to the following specification sections and contract drawings.

B. Reference Specifications: The Work of the Filed-Sub is described in the following Sections:

1. Section 096513, “Resilient Base and Accessories”

2. Section 096519, “Resilient Tile Flooring”

C. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract

Drawings: GI001, AE101, AE601.

1.3 ALTERNATES

A. Refer to Drawings and Section 012300, “Alternates” for requirements.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION – NOT USED

END OF SECTION 090005

File details come from the government source that posted it. Updated .