This document outlines the Preventative Maintenance and Repair Requirements and Tasks for an Elevator/Escalator Preventative Maintenance and Repair Services contract issued by the Pennsylvania Department of General Services (DGS) on behalf of the Bureau of Facilities Management (BFM). The contract covers preventative maintenance, safety checks and tests, and routine and emergency repairs for elevators, escalators, dumbwaiters, and handicap lifts located in various DGS BFM managed buildings in Harrisburg, Reading, and Scranton, Pennsylvania. The contract requires specific monthly preventative maintenance hours for each equipment type, with detailed record keeping and reporting responsibilities for the contractor. The contract also includes requirements for equipment cleaning, painting, safety inspections, and AHJ testing.
The pricing and funding for this contract are not provided in the document. However, it specifies that the contractor will be responsible for all covered repairs, with certain exclusions. Mandatory on-site visits are scheduled for potential offerors to inspect the equipment and facilities at the Harrisburg, Scranton, and Reading locations prior to submitting proposals through the JAGGAER procurement portal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 04 Appendix B - Mandatory On-SIte Visit Schedule_Final.xlsx | XLSX spreadsheet | |
| 01 DGS Elevator Maintenance Technical Submittal_Final.docx | DOCX document | |
| 06 Appendix D - Personnel Listing and Experience by Position.docx | DOCX document | |
| 08 Appendix F - Service Level Agreements.docx | DOCX document | |
| 02 Terms and Conditions_Final.docx | DOCX document | |
| 05 Appendix C - RFP Cost Submittal Worksheet.xlsx | XLSX spreadsheet | |
| 07 Appendix E - COPA Holidays.docx_.docx | DOCX document | |
| 03 Appendix A - DGS Elevator-Escalator Equipment List_06_10_24.xlsx | XLSX spreadsheet | |
| 10 Appendix H - Change Notice Form for Addition or Removal of Equipment.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATOR/ESCALATOR PREVENTATIVE MAINTENANCE AND REPAIR SERVICES
APPENDIX G – PREVENTATIVE MAINTENANCE AND REPAIR REQUIREMENTS AND TASKS
The Contractor is required to perform and accomplish scheduled preventive maintenance, safety checks and tests, and routine and emergency repairs, to include the following:
I. Preventative Maintenance (PM).
A. The Contractor shall provide scheduled preventive maintenance, to include systematic examinations, adjustments, cleaning, and lubrication of all machinery, machinery spaces, hoist ways, and pits. At minimum, the Contractor shall dedicate the following times for preventive maintenance of the specified equipment:
1. Gearless Traction type elevator, three (3) hours per month per unit
2. Geared Traction type elevator, two (2) hours per month per unit
3. Hydraulic type elevator, one and a half (1.5) hours per month per unit
4. Escalator, six (6) hours per month per unit
5. Dumbwaiter, one hour per quarter per unit; and
6. Handicap lifts, one hour per quarter unit.
B. For each hour of monthly preventive maintenance that is not provided by the Contractor, as detailed in Section A above, the time must be documented and accounted for as identified below.
1. Hours missed due to unforeseen circumstances may be made up the following month, but at no time shall the monthly hours owed for previous quarter of PM maintenance exceed ten percent (10%) of the required man hours over a three-month period.
2. Accurate record keeping is the responsibility of the Contractor. The Contractor must provide to the Contract Administrator, or designee, a representative proof of preventive hours utilized, at a minimum in a monthly report, or upon request. During the Implementation phase of the Contract, the Contractor, and DGS BFM, will mutually agree upon the format (electronic, MS Excel, etc.) and frequency for the record keeping.
C. During all examinations, the Contractor shall remove and discard immediately all accumulated dirt and debris from the car top(s) and pit area(s). Contractor shall thoroughly clean down the entire hoist way of all accumulated dirt, grease, dust, and debris on an annual cycle; this must be done prior to the expiration of the initial contract term. Each escalator shall receive an annual internal clean down.
D. The Contractor shall keep the exterior of the machinery and any other parts of the equipment subject to rust properly painted, identified, and presentable always. The Contractor shall periodically treat all motor windings and controller coils with proper insulating compound and annually shall paint all machine room floors and storage areas with good quality deck enamel.
E. The Contractor shall conduct safety, efficiency, and maintained conditions surveys, inspections, supervisor meetings and tests including load/pressure testing as follows:
1. A qualified Contractor supervisor shall make semi-annual quality control evaluations to ensure and confirm the specified services and procedures are properly executed according to maintenance and performance standards for the Systems.
2. Machinery and equipment shall be maintained in accordance with minimum condition required by Uniform Construction Code Statute Act 45 of 1999 as amended, Title 34, Labor & Industry Part XIV Uniform Construction Code Chapter 405, terms and conditions of this Contract, and good maintenance practice. The load/pressure testing shall be completed in accordance with the industry codes and standards. The Contractor shall coordinate this with the Department Contract Administrator, or designee, and the Labor and Industry Elevator Division. A completed copy of the test shall be forwarded to the Department Contract Administrator, or designee.
3. On a monthly basis, the Contractor’s service superintendent shall attend a meeting with DGS BFM personnel to discuss but not be limited to; units out of service, maintenance plan for the coming quarter, progress of repairs, provide time tickets for PM performed the previous month, etc.
4. The Contractor shall provide services to Department for Fire Emergency Operating Systems and Emergency Power Systems testing at no additional cost to the Department. The required Life Safety Testing is performed after hours and will be at no additional cost to the Department.
5. All Authority Having Jurisdiction (AHJ) required elevator and/or escalator testing shall be inclusive of this contract whether performed on regular or overtime hours, at the Department’s request.
II. Covered Repairs. Repair services performed through this contract (resulting from PM activities or unplanned/unscheduled repairs) includes but is not limited to the following categories of equipment. Repairs to equipment not listed in this section but otherwise considered to be within the scope of “elevator/escalator equipment” may be performed at the discretion of the Contract Administrator.
1. Automatic door systems, power operated door systems, and manual door/gate systems, complete:
a. Power operator and engagement linkages.
b. Car door top track and hanger roller assemblies.
c. Car door track liners, eccentrics, stops, bumpers, and related operating mechanisms for multiple speed or multiple panel doors.
d. Car gates, bottom guides, retainers, fire stops, gibs, entrance sills and threshold plates, gate handles, and protection guards.
e. Electrical safety switches and activation mechanisms, door protective and/or retracting devices, and power door operators.
f. Electromechanical safety interlock assemblies, related operating mechanisms, clutch or other master system engaging devices, linkages, zoned locking devices, and self-closing devices.
2. Car frame, platform, and car safety devices, complete:
a. Crosshead, stiles, hitch plates, tie rods, supports, and related structures.
b. Car guides, shoes, stands, spindles, gibs, rollers, and tensioning devices.
c. Sub-platform, under car platform fireproofing, car sills with support cradles, load weighing devices, top/side exit access operating/safety hardware, and electrical switches.
d. Car fans, blowers, and cab ventilation systems.
3. Hoisting machinery, and rotating power drives with mounting supports and beams, raised platforms, and weighted foundations and structures, complete:
a. Geared traction and winding drum units, gearless traction, and related systems, complete.
b. Worms, gears, shafts, couplings, drive sheaves, deflector sheaves, 2:1 sheaves, bearings, support/mounting apparatus, brake assembly, rotating elements, and all associated castings, guards, retainers, and hardware.
c. Integral and free-standing brake units, drums, discs, pulleys, shoes, linings, pads, pins, sleeves, plungers, coils, caps, adjustment devices, and hardware, complete.
d. C and DC motors, motor generators, rotating regulators and exciters; armatures, field coils, pole pieces, interpoles, commutators, brush riggings, brush holders, carbon brushes, stator windings, fan or other ventilation mechanisms, bearings, bushings, shafts, caps, packings, seals, junction boxes, leads, connectors, and related wiring.
4. Controls, selectors, power drives, encoding devices with related wiring, conduit, and circuitry, complete:
a. Relays, contactors, switches, capacitors, resistors, fuses, circuit breakers, overloads, power supplies, regulators, tach generators, arc shields, shunts, holders, and hardware.
b. Circuit boards, transmitters, encoders, transformers, rectifiers, transistors, solid state switching devices, insulators, timing devices, suppressors, and computer apparatus.
c. Filters, fans, blowers, wiring, studs, terminal blocks, plug connectors, CRTs or other diagnostic devices, keyboards, and printers.
d. Integral A/C units in Control Cabinets, cabinets, isolation, transformers, chokes, diagnostic tools, status indicators, and solid state and hard wire circuitry.
5. Car and counterweight safety systems:
a. Overspeed governors and electromechanical safety devices, wire ropes, and tensioning devices with related hitch and connection apparatus, complete.
b. Car and counterweight safety devices, drums, rods, linkages, clamps, and hardware.
6. Hoist way and pit equipment.
a. Guide rails, fishplates, brackets, inserts, and related hardware, to include jack bolts or other special mechanisms for mounting and alignment.
b. Wire ropes, belts, chains, and cables used for suspension, compensation, safety, and selector encoding with related hitch and connection hardware, complete.
c. Corridor entrance top track and hanger rollers, toe guards, fascia’s, dust covers, sills, stops, bumpers, eccentrics, retainers, and bottom guides.
d. Overhead machine room, secondary and 2:1 wire rope sheaves, shafts, bearings, bushing, seals, mounting supports, lubrication devices, guards, and hardware, complete.
e. Electrical wiring and conduit, electrical traveling cables, electrical limits, slowdowns, activating cams, switches, vanes, inductors, tapes, readers, and leveling and encoding systems, complete, with all related hardware and wiring.
f. Compensation sheaves, shafts, frames, guides, switches, rollers, cams, guards, “S” hooks, guidance systems, and all related hardware.
g. Counterweight assemblies, guides, rollers, stands, strike plates, safeties, and hitch devices.
h. Car and counterweight buffers, stands, strikes, blocking, platforms, extension devices, mounting hardware, and appurtenances.
i. Pit safety switches, cable tensioning devices, access ladders, light switches, lighting assemblies, bulbs, and guards.
7. Operating and signal fixtures with electrical wiring.
a. Car operating panels, push buttons, stop switches, audible signals, keyed or other control switches, visual signals, jewels, and indicators with electrical wiring.
b. Car position indicators, riding lanterns, signal annunciators, visual and audible signals complete.
c. Corridor push button stations, hall lanterns, hall position indicators, keyed switches, access controls, electrical wiring and traveling cables complete.
d. Emergency lighting systems, emergency communication devices, and signal systems complete.
e. Corridor and lobby fixtures with remote controls and operational monitoring devices, starter panels, emergency power selectors, telltale panels, location indicators, security controls and monitors.
8. Hydraulic systems’ components, including but not limited to, tanks, valves, pump, cylinder head, above ground piping, hoses, fittings, gauges, seals, O-Rings, filters, screens, packings, belts, recovery devices overflow devices, rescuvator or other emergency operating and signal systems, and above-grade cylinder and plunger assemblies, complete; mufflers, heaters, and shut-off valves.
9. Escalator systems components, including but not limited to driving machines; steps; rollers; tracks; lubricators; handrails; guides; starting mechanisms; stop and safety switches; comb plates; hand guards; brush guards; skirt boards; step/handrail driving mechanisms, complete; lubricating devices; chains; sprockets; demarcation lighting; and/or safety strips or other markings.
10. The following items of equipment are excluded: Main line power switches and fuses, car enclosures, car doors, hoist way enclosures, hoist way doors and door frames, escalator truss assembly, escalator floor plates, escalator balustrades, buried hydraulic piping, cylinder, and conventional below-grade plunger assemblies.
B. Maintenance requirements, in addition to scheduled and emergency repairs, renewals and testing, shall include but are not limited to:
1. Examination of wire ropes to maintain proper tensioning and legal bottom clearances on a monthly basis for shortening and adjusting ropes as required, and performance of all reshackling procedures per UCC Statue Act 45 of 1999 as amended, Title 34, Labor & Industry Part XIV Uniform Construction Code Chapter 405, terms and conditions of this Contract, and good maintenance practice.
2. Examination, repair, and replacement of all electrical wiring, traveling cables, conduits, connections, and related apparatus extending from the main line power supply switch in the machine or other power supplies in hoist ways.
3. Maintenance of pit, hoist way, and machine room lighting to include relamping, wiring, and switch controls.
C. Analyze the Systems every (6) months, including a detailed analysis of all repairs, replacements, and adjustments required to maintain the equipment in safe operating conditions, and submit the results of the analysis to the Contract Administrator, or designee, for review and action.
D. Analyze the Systems performance (including riding quality, equipment conditions, and operational systems) twice each year, including a detailed analysis of all repairs, replacements, and adjustments required to maintain the Systems at the O.E.M.’s operating performance levels, and submit the results of the analysis to the Contract Administrator, or designee, for review and action.
E. Upon the DGS, BFM’s, written request, recommend additional equipment or modification of existing equipment to discourage vandalism to or misuse of any part of the equipment.
F. All vandalism/misuse must be documented and the Contract Administrator, or designee, notified immediately prior to proceeding with any repair work.