05 DRFP 25R0001 - TE2 MSR Template.docx

DOCX document 59 KB Posted

Attached to
Warrior Care Global Support Draft RFP
Solicitation number
H9240025R0001
Issued by

About this file

This is a Monthly Status Report (MSR) template that provides a standardized format for contractors to report performance metrics across multiple service areas for the USSOCOM Warrior Care Program. The template includes performance objectives, acceptable quality levels, and maximum allowable deviations for Recovery Care Coordination, Benevolence Support, Career Transition, Military Adaptive Sports, and Personnel Management.

The template requires reporting on specific metrics such as response times, documentation accuracy, customer satisfaction rates, and personnel staffing levels. Key performance thresholds include: initial contact with recovering service members within 1 business day, maintaining 80% satisfaction survey ratings, documentation accuracy with no more than 4 discrepancies per quarter, and personnel vacancy fill rates within 30-45 days. The template also includes sections for tracking training compliance across multiple required areas (HIPAA, PII, Ethics, etc.), staff rosters, funding expenditures, and travel reporting.

View the file

Other files

File Type Posted
12 DRFP 25R0001 - PPI Relevancy Baseline.XLSX XLSX spreadsheet
14 DRFP 25R0001 - Client Authorization.docx DOCX document
16 DRFP 25R0001 - Resume Template.docx DOCX document
Additional CLS WCGS.pdf PDF
Section J.docx DOCX document
00B DRFP 25R0001 - Section M.docx DOCX document
00C DRFP 25R0001 - SOW.docx DOCX document
08 DRFP 25R0001 - TE5 Historical Metrics.xlsx XLSX spreadsheet
13 DRFP 25R0001 - Subcontractor Consent.docx DOCX document
CLS WCGS.pdf PDF
00A DRFP 25R0001 - Section L.docx DOCX document
06 DRFP 25R0001 - TE3 Perform Locs Skills Quals.xlsx XLSX spreadsheet
07 DRFP 25R0001 - TE4 Travel Authorization.docx DOCX document
11 DRFP 25R0001 - PPI.docx DOCX document
15 DRFP 25R0001 - QnA Template.docx DOCX document
10 DRFP 25R0001 - Oral Presentation WARNO.docx DOCX document
03 DRFP 25R0001 - Price Matrix.XLSX XLSX spreadsheet
04 DRFP 25R0001 - TE1 Service Delivery Summary (SDS).xlsx XLSX spreadsheet
09 DRFP 25R0001 - WD List.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MONTHLY STATUS REPORT

Contractor Name, Contract Number, Project Name.

Submitted to the COR, Mr. Diego Esguerra Date:

Period of Performance Covered by Report: 1-31 January XXXX

Summary and Issues
Resolution/Proposed Resolution:

List any issues

Recovery Care Coordination

Performance Objective / Elements
Acceptable Quality Level
Performance Standards
Max Allowable Deviation (AQL) for Requirement
Quality Standard Met (Y/N)
Remedy/Corrective Action
RCC Documentation of RCP within the WCP Database
Case documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the RCC SOP
Case documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the RCC SOP
Accuracy: No more than 15% of cases reviewed have more than 3 discrepancies
Y
Recovery Care Coordinator Initial Contact
Initial contact is made with RSM within 1 business day upon assignment of case IAW RCC SOP
Initial contact is made with RSM within 1 business day upon assignment of case IAW RCC SOP
Timeliness: No more than 15% of cases exceed the 1 business day initial contact time requirement.
Y
Recovery Care Coordinator Frequency of Contact
Frequency of contact is made within parameters of case frequency assignment
Frequency of contact is made within parameters of case frequency assignment
Timeliness: No more than 15% of cases exceed their respective frequency of contact requirement.
Y
Quality of Recovery Care Coordination provided to Case
Part 1. No more than 3 substantiated complaints per Period of Performance
Part 1. No more than 3 substantiated complaints per Period of Performance
Effective: No more than 3 substantiated complaints per POP.
Y
Part 2. Active Case review passes the Case Competency Assessment
Part 2. Active Case review passes the Case Competency Assessment
Accuracy: No less than 80% score on case competency assessment.
Y
Part 3. Pass SAV inspection
Part 3. Pass SAV inspection
Accuracy: No less than 90% upon inspection.
Y
NOTE – No SAV’s conducted this month. Next SAV scheduled for Ft Campbell office on 3/8
Part 4. Receive average rating of 80% on Satisfaction Survey
Part 4. Receive average rating of 80% on Satisfaction Survey
Effective: No less than 80% on satisfaction survey.
Y

RCC Caseload-See attachment.

Benevolence

Performance Objective / Elements
Acceptable Quality Level
Performance Standards
Max Allowable Deviation (AQL) for Requirement
Quality Standard Met (Y/N)
Remedy/Corrective Action
Benevolence response rate to support request
Response within 2 business days of initial email request
Response within 2 business days of initial email request
Timeliness: No more than 15% of cases exceed the 2-business day response requirement.
Y
Benevolence Documentation
Part 1. Success on accuracy of data input into BSS NIPR board
Part 1. Success on accuracy of data input into BSS NIPR board
Accuracy: No more than 4 discrepancies/errors per quarter.

Y

Part 2. Success in meeting time requirements for BSS data input into WCP Database
Part 2. Success in meeting time requirements for BSS data input into WCP Database
Timeliness: Information is entered into the WCP Database does not exceed 3 business days for 90% of cases.
Part 3. Success on complete and accurate Data input into WCP Database
Part 3. Success on complete and accurate Data input into WCP Database
Accuracy: No more than 4 discrepancies/errors per quarter.

Career Transition

Performance Objective / Elements
Acceptable Quality Level
Performance Standards
Max Allowable Deviation (AQL) for Requirement
Quality Standard Met (Y/N)
Remedy/Corrective Action
Career Transition Initial Contact
CT initial contact with RSM made within 5 business days of reception of Transition Assistance Request (TAR)
CT initial contact with RSM made within 5 business days of reception of TAR
Timeliness: No more than 15% of cases exceed the 5-business day initial contact time requirement.
Y
Career Transition Documentation
CT documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the CT SOP
CT documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the CT SOP
Accuracy: No more than 4 discrepancies/errors per quarter.
Y
Quality of Career Transition Assistance
Receive average rating of 80% on CT Satisfaction Survey
Receive average rating of 80% on CT Satisfaction Survey
Effective: No less than 80% on satisfaction survey.
Y
Career Transition Satisfaction Survey Delivery
CT satisfaction survey sent to RSM within 30 days post Service separation
CT satisfaction survey sent to RSM within 30 days post Service separation
Timeliness: No more than 10% of cases exceed the 30-day post-service separation time requirement for survey delivery.
Y
Performance Objective / Elements
Acceptable Quality Level
Performance Standards
Max Allowable Deviation (AQL) for Requirement
Quality Standard Met (Y/N)
Remedy/Corrective Action

MAS Participant Recruitment

Part 1. Recruit to fill allocated slots (recruitment goal) for MAS events
Part 1. Recruit to fill allocated slots (recruitment goal) for MAS events
Effectiveness: No more than 15% deviation from identified recruitment goal for each event.
Y
Part 2. Recruit new participants
Part 2. Recruit new participants
Effectiveness: No less than 5% of recruitment goal contains new participants.
Y
MAS Documentation
MAS documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the MAS SOP
MAS documentation in WCP Database is accurate and IAW format, procedures, and guidelines as established by the MAS SOP
Accuracy: No more than 4 discrepancies/ errors per quarter.
Y

MAS Product Timelines

Part 1. Given 150 days notification of event dates, CONOP product delivered NLT 120 days pre-event
Part 1. Given 150 days notification of event dates, CONOP product delivered NLT 120 days pre-event
Timeliness: CONOP delivered NLT 120 days pre-event.
Y
Part 2. Given 150 days notification of event dates, OPORD delivered NLT 60 days pre-event
Part 2. Given 150 days notification of event dates, OPORD delivered NLT 60 days pre-event
Timeliness: OPORD delivered NLT 60 days pre-event.
Y
Part 3. AAR delivered within 10 business days post event
Part 3. AAR delivered within 10 business days post event
Timeliness: AAR delivered NLT 10 business days post-event.
Y
MAS Event Satisfaction Survey Delivery
MAS satisfaction survey sent to RSM within 10 business days post event
MAS satisfaction survey sent to RSM within 10 business days post event
Timeliness: No more than 10% of cases exceed the 10-business day post-event time requirement for survey delivery.
Y
MAS Initial Contact
MAS initial contact with RSM made within 5 business days of referral by RCC to MAS
MAS initial contact with RSM made within 5 business days of referral by RCC to MAS
Timeliness: No more than 15% of cases exceed the 5-business day initial contact time requirement.
Y

Military Adaptive Sports

Travel Report

Trip Start Date
Traveler's Name
Destination
Purpose

Personnel

Performance Objective / Elements
Acceptable Quality Level
Performance Standards
Max Allowable Deviation (AQL) for Requirement
Quality Standard Met (Y/N)
Remedy/Corrective Action
Management of Personnel/Issues:
Contractor receives no more than 1 formal customer complaints per year

Contractor provides fully qualified personnel and ensures fully qualified personnel.

Contractor receives no more than 1 formal customer complaints per year.
Y

No more than 1 personnel related changes due to ineffective performance or inappropriate qualifications.

No more than 1 personnel related changes due to ineffective performance or inappropriate qualifications.
Y

Contractor successfully manages personnel to meet all requirements defined in the PWS, regardless of absences or vacancies, 100% of the time.

Contractor successfully manages personnel to meet all requirements defined in the PWS, regardless of absences or vacancies, 100% of the time.
Y

Contractor successfully resolves any customer complaint within 2 business days of receipt or less.

Contractor successfully resolves any customer complaint within 2 business days of receipt or less.
Y

Contractors' monthly report is submitted within 15th calendar day of the month, is error free, and is accurate. No more than 2 late monthly reports is submitted.

Contractors' monthly report is submitted within 15th calendar day of the month, is error free, and is accurate. No more than 2 late monthly reports is submitted.
Y

Maintain 100% of all key personnel and critical position and 100% fill rate of personnel throughout each TO period of performance

Maintain 100% of all key personnel and critical position and 92% fill rate of personnel throughout each TO period of performance.
Maintain 100% of all key personnel and critical position and 92% fill rate of personnel throughout each TO period of performance.
Y
Management of Personnel Vacancies
Vacancies* are filled within 40 working days of personnel departures when notice is not given
Vacancies* are filled within 45 days.
Vacancies are filled within 45 days when notice is not given and 30 days when at least a two-week notice is given.
Y

Management of Personnel Vacancies During periods of absences/vacancies gap analysis and contingency plans ensures compliance with DoDI 1300.24

Vacancies* are filled within 25 working days of personnel departures when at least two-week notice is given.
Vacancies* are filled within 30 days.
Vacancies* are filled within 30 working days of personnel departures when at least two-week notice is given.
Y
Must be in compliance with DoDI 1300.24
Must be in compliance with DoDI 1300.24
No deviations from DoDI 1300.24 caseload ratio.
Y

Staffing

Staffing Rate
Turnover Rate
Cumulative Turnover Rate
Comments
%
%
%
List any personnel changes during the reporting month.

Training

Training Requirements
Number Requiring Training
Number Trained
Percent Trained
Recommendations/ Notes
Onboarding/Orientation
64
64
100%
Bi-Annual (Fall)
64
64
100%
Bi-Annual (Spring)
64
64
100%
Annual (On-Line)
64
64
100%
HIPAA
64
64
100%
PII
64
64
100%
At Risk
64
64
100%
Ethics
64
64
100%
Joint Suicide Prevention
64
64
100%
SAPR (Sexual Assault Prevention)
64
64
100%
Training Needs
Recommendations

Add training comments

Quarterly Training:

By name quarterly Training Rosters and Training Agenda:

· January-March (provided on December MSR)

· April-June (Provided on March MSR)

· July-September (Provided on June MSR)

· October-December (Provided on September MSR)

Surveys

Survey Type
Survey Name
# of Participants
# Surveyed
# Satisfied
Satisfaction Rate (> 80%)
Recommendations
Event
Example: Challenge Aspen ski and snowboard Camp
10
8
8
100%
Population
RCC Satisfaction Survey
63
32
31
97%

Staff Roster (see TE4)

Provide an updated copy of TE4 in this section.

Funding Report

CLIN
Amount Obligated
Amount Expended
Balance

Projected expenditures for the next month: