Amendment 2 - Attachment J6 - Questions and Answers - 11.19.2026.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Library of Congress: Microfilm Inventory Services
Solicitation number
030ADV27R0009
Issued by

About this file

This file is a Questions and Answers (Q&A) amendment document addressing 57 inquiries from potential offerors regarding Solicitation 030ADV27R0009, a Library of Congress microfilm inventory services IDIQ contract. The file clarifies key contract terms, performance requirements, pricing methodology, and proposal submission guidelines.

The contract involves inventorying Archival Master and Print Negative microfilm reels at the Library of Congress, with an estimated volume of 5,000 to 15,000 reels annually at fully burdened firm fixed unit prices per reel. The NAICS code is 519210 (Libraries and Archives), and the acquisition is unrestricted to small businesses. Critical clarifications include: invoicing occurs monthly upon batch acceptance; the Project Manager is not required to be full-time and may perform inventory work without double-billing; contractor staff may work extended hours (6:30 AM to 8:00 PM) with adequate on-site Library supervision; and three workstations accommodate a maximum of three contractor employees. Quality assurance is performed by Library staff after batch submission, with rejected batches allowed one week for correction. Batches consist of approximately 34 reels per shelf, requiring completion within three working days (excluding Library QC time). Contractor pricing must be fully burdened, inclusive of all direct and indirect costs, transportation, and security escorts. Subcontractors are permitted, and past performance references covering the prior three years from federal, state, local, or private contracts are acceptable. Proposals are due November 30, 2026, with a contract start date of March 2, 2027, requiring full background clearance before work begins.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Microfilm Inventory IDIQSolicitation 030ADV27R0009Question & Answer Amendment 0002 - 11/19/2026
Question #SectionPageQuestionLibrary Response
1Section A, Block 10pg 1Please provide the applicable NAICS code and small-business size standard, which are blank in Block 10, and confirm whether this acquisition is unrestricted.The NAICS code is posted at the top of the SAM.gov posting showing NAICS: 519210 Libraries and Archives

This acquisition is not restricted to small businesses.

2 Section B.1 and FAR 52.212-5(c)) pg 4 and 32 Section B.1 states "Fixed Price with Economic Price Adjustment," while FAR 52.222-43 does not appear to be selected in the FAR 52.212-5(c) clause list. Please clarify whether contract unit prices may be adjusted if the applicable Service Contract Act wage determination is revised during the contract period. There is no Economic Price Adjustment for this contract, only the Service Contract Act.

CLIN 0001 is marked as "Firm Fixed Price with Economic Price Adjustment." This is an error caused by the Library's new Contract Writing System and cannot be changed. Please see notice added to Section B.2 Contract Type.

3B.3pg 4B.3 states orders "may be placed for estimated pages at fixed unit prices," while the price table and Section C.5.1.2 price by inventoried reel. Please confirm the unit of measure is the reel.Task orders will be placed in batches of reels. This text has been deleted.
4Section C and L.6; Attachement J5pg 6 and 60Section C anticipates 5,000 to 10,000 reels a year. Please confirm the estimated quantity per ordering period used in Attachment J3 to compute the total evaluated price. How does this relate to the initial quantity of 14,086 reels? Is there an established production schedule or expected weekly throughput?Section C in the Statement of Work has been updated to reflect a change to a max of 15,000 reels. Specific requirements and numbers of reels to be completed will be identified in individual task orders issued under this contract and may vary per order. The set quantities are not known at this time.

No, there is not a set number of batches to be completed each week. Invoicing shall be made by per-reels processed.

5 Section C pg 6-10 Is this a new requirement or a follow-on? If a follow-on, please provide the prior contract number, the number of reels inventoried per year, and the historical contractor staffing level. Incumbent Contractor: Zimmerman Associates Inc.

Contract: LCLSP17D0058 IDIQ Ceiling: $1,000,000.00

No other information is being offered about the incumbent or their work effort which shall not be shared with the new business.

6 Sections C.4.3 and C.4.4 pg 10 The Project Manager is required to be on site and Inventory Clerks "may" be provided. Please confirm whether the Project Manager must be on site full time, whether the Project Manager may also perform inventory work, and whether there is a minimum number of clerks. May the contractor provide that individual through a subcontracting arrangement?

No, the Project Manager does not have to be on site at all times.

Yes, the Project Manager may perform inventory work, but they cannot double bill for hours worked if they also perform inventory work.

There is not a minimum number of clerks required.

Yes, subcontractors are allowed.

7 Section C pg 6 The contractor determines its hours of operation. Please state the hours the Adams Building Microform Vault and work areas are available to contractor staff and the maximum number of contractor staff that can be accommodated at once. Please see page 17 Sections F.1 The Library’s standard operating hours are from 8:30 AM through 5:30 PM, Monday through Friday, excluding Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. Contractors may extend working hours from 6:30 AM to 8:00 PM if demonstrably adequate supervision is provided and all quality assurance metrics are within contract ranges. The contractor shall coordinate with the COR for any work to be conducted at Library facilities.

Since a lot of the work is computer based, a desk is required. There are 3 work stations, thus a maximum of 3 contractor staff can be accomodated. The Library anticipates it will take less than 3 people to fulfill this contract.

8Sections C.5.3 and G.3pg 11 & 20May the contractor submit invoices monthly or upon acceptance of completed batches of microfilm reels, or is payment permitted only upon completion of an entire task order?The contractor must submit invoices for payment upon delivery and successful performance of all work processed in each task order at the unit prices in Section B of this contract. Invoices shall be submitted monthly for the number of batches/reels processed.
9Section H.6pg 24Section H LC52.204-4 CONTRACTOR EMPLOYEE FITNESS anticipates a minimum of two weeks for background processing. Please confirm whether contractor staff may begin work after a favorable preliminary check or must wait for final adjudication, and whether processing time affects the March 2, 2027 start.Due to the nature of certain reels and the associated security requirements, contractor personnel will be required to receive full clearance and final adjudication before beginning work. The March 2, 2027, start date remains our anticipated start date.
10Section L.6, Volume 3pg 59Please confirm whether references for a proposed subcontractor will be accepted and how an offeror with no relevant past performance will be rated.Yes, subcontractors references will be accepted.

Offerors with no relevant past performance history will be treated as neutral.

11 Section L.6, Volume 2 pg 59 Please confirm whether a letter of commitment is required for a proposed Project Manager not currently employed by the offeror, and whether Volume 2 has a page limit. A Letter of Commitment is not required by the Library. However, it may result in your Key Personnel being rated more favorably. Especially if it is for a subcontractor.

Volume 2 for Key Personnel Resumes does not have a page limit and there is not a page limit per resume. Full resumes MUST be submitted; summary's wil not be accepted.

12Attachment J1; clause 52.222-41Please identify the wage determination labor categories the Library considers applicable to the Project Manager and Inventory Clerk positions.Offerors are free to propose whatever labor categories they feel necessary to complete all work ordered under this IDIQ. Please see the updated text in Sections L and M regarding Pricing.
13Attachment J5: Section L.6pg 58Please confirm whether the corporate experience of a proposed subcontractor or teaming partner will be considered, and whether experience of the proposed Project Manager gained before joining the offeror may be presented.Yes, this will be accepted for both.
14Attachment J5: Section L.6pg 58Is the initial order of 14,086 reels shown in Attachment J5 expected to be issued at contract award? Please confirm the quantity, start date, and duration of the initial order described in Attachment J5. What is the expected performance period and funded amount of that initial order?The 14,085 reels is a sample amount used for pricing the task orders. The actual initial order may be different.

The initial task order will be issue at the same time as the IDIQ award.

The exact quanitity, period of performance, and funding for the initial order is unknown at this time and will be based off the competitive prices and the availability of Congressionally appropriated funds. Thus is the nature of IDIQ contracts.

15Can the Library of Congress confirm the approximate split between Archival Master reels (yellow label) and Print Negative reels (pink label) across the 14,086 reels per ordering period, so that offerors can accurately model the Fort Meade transport and security-escort requirements in pricing?Archival masters represent 38.5% and print negatives represent 61.5% of what we currently have ready.
16The solicitation references acetate and polyester film types. Will the contractor be required to perform film-type identification and document the film base in the MARC record, or is this for reference and handling purposes only?It is one of the catalog markers that must be added.
17Please clarify the anticipated maximum number of task orders that may be issued in a single ordering period and whether there is a minimum task order threshold.The minimum guaranteed amount is detailed in Section B. There is no maximum number of task orders that can be placed during any period. Only the IDIQ's ceiling may not be exceeded. The minimum obligation amount is $50,000. Once that obligation is met, no future orders are gauaranteed. However, the Library retains the right to place order up to the IDIQ ceiling. It is anticipated that only 1 order will be active at any one time, but not absolutely garaunteed.
18Section B.2pg 4The solicitation references FOLIO ILS for catalog record updates. Please confirm whether contractor staff will be granted direct FOLIO system access or whether catalog updates will be submitted via a file transfer or import process managed by LC staff.Direct FOLIO system access.
19Section C.3.2.1For each reel, the solicitation requires creation of both an HREC (Holdings Record) and an IREC (Item Record). Please confirm the minimum required MARC fields for each record type and whether LC will provide a data dictionary or field-mapping template to ensure consistency.Refer to solicitation Section C.3.2.1 Review and Verify IREC & C.3.2.2 Create/Updated HREC
20Will the Government provide any existing catalog data or pre-populated MARC record stubs for the reels to be inventoried, or will the contractor be responsible for creating all records from scratch based on physical inspection?LC staff will create minimal holdings record (HREC) for each microfilm bibliographic record established prior to inventory. This HREC will show permanent location, copy number, call number type, call number, and public note.
21Please clarify the process for identifying and resolving duplicate records discovered during inventory. Should duplicates be flagged, suppressed, or merged, and who has final authority on resolution?Flag and notify COR.
22The solicitation specifies a 3-day turnaround requirement for batch submission. Does this 3-day window begin upon physical receipt of the batch, upon task order issuance, or upon another triggering event?Receipt of batch
23Please confirm whether the 3-day batch turnaround applies to all batch sizes equally, or whether there is a tiered schedule for larger batches.Each batch will consist of one shelf per row. Typically 34 reels.
24The solicitation identifies two error thresholds: Critical Errors (greater than 1% triggers batch rejection) and Significant Errors (greater than 3% triggers batch rejection). Please confirm whether these percentages are calculated per individual batch per reel or per data element?Per batch
25To help the contractor avoid them, could the Library share the most common error types found in the recent corrections of previously inventoried reels?Refer to C.6.2.1 Critical Errors & C.6.2.2 Significant Errors
26Section Cpg 12What is the Government's definition of a Critical Error versus a Significant Error? Is there a list of specific cataloging or physical inspection mistakes that fall into each category?The list of error types are listed in the solicitation statement of work.
27Upon batch rejection due to exceeding error thresholds, what is the allowable correction and resubmission timeframe? Does a rejected batch count against the contractor's performance record for CPARS purposes?A week will be allowed to review and correct identified error.

The Library's CPARS may indicate continual rejections if the work is not processed appropriately.

28Will the Government designate a Quality Assurance Evaluator (QAE) or COR representative to conduct real-time spot checks during contractor performance, or will quality verification occur after batch submission?Quality verification will occur after batch submission.
29Section C.4.4.pg 10Are there minimum qualification requirements for cataloging staff beyond the Program Manager (for example: MLIS degree, years of MARC cataloging experience, or prior federal library experience)?The list of required skills for Other Personnel are listed in the solicitation statement of work in Section C.4.4.
30Section F.1pg 17The solicitation references on-site work at the Library of Congress. Please confirm the specific building and work location where contractor staff will be stationed during performance (for example: John Adams Building, Madison Building).The three (3) locations are listed in the solicitation in Section F.1 Place and Period of Performance.
31Attachment J3Attachment J3 is referenced as the Evaluation Pricing Spreadsheet. Please confirm whether offerors must complete all line items in Attachment J3 as provided, or whether additional line items (for example: Fort Meade transport, security escort) may be added as separate CLINs.Offerors must complete all line items in Attachment J3 as provided. There are no additional CLINs. Unit pricing will need to include all overhead pricing.
32Section Lpg 60Please confirm whether the unit price submitted in Attachment J3 must be fully burdened, meaning inclusive of all direct labor, overhead, G&A, profit, SCA wages and fringe, and all transport and security costs, or whether certain cost elements should be priced separately.As stated in both Sections L.6: Offeror shall provide fully burdened firm fixed prices in Attachment J3. Pricing must be inclusive of all direct and indirect costs. This is also stated in Section L.6, pg 17 of amendment 0001.
33Amendment 0001 - L.6 & M.3pg 20Will option period pricing in Attachment J3 be evaluated at a fixed price per reel, or will the Government apply an escalation factor? Please confirm the pricing methodology for all five ordering periods.As stated in solicitation Section M.3 of amendment 0001: The Library will add together the firm fixed prices in tab one of the Evaluation Pricing Spreadsheet (Attachment J3) to establish a total evaluated price for the overall competition. The Library will also evaluate offeror’s per-reel price.
34The solicitation references a four-volume proposal structure. Please confirm the page limits, if any, for each volume: Volume I Technical, Volume II Management, Volume III Past Performance, and Volume IV Price.As stated in Section L.6:

The Technical Volume response is limited to 10 pages. The cover page, table of contents, and acronym list are excluded from the 10-page limit.

There is no page limit to Volumes II, III or IV.

35 Section L.6 p59 For Volume III Past Performance, please confirm the number of past performance references required and whether the Government will issue a Past Performance Questionnaire (PPQ) form for references to complete. As stated in solicitation Section L.6: The Offeror shall submit up to three past performance references for work substantially similar to this requirement. Past performance references must be limited to the past three (3) years, and they must be for federal contracts, statecontracts, local contracts, or private businesses.

The past performance Questionnaire is Attachemment J2.

36Section L.6p59For past performance references, does the Library of Congress require that all references involve microfilm inventory or cataloging specifically, or will similar records management, digitization, or library services experience be considered relevant?As stated in solicitation Section L.6: The Offeror shall submit up to three past performance references for work substantially similar to this requirement.
37Please confirm that a FOLIO record for each reel's title will already exist and will have been verified by Library staff before reels are released to the contractor. Please also confirm that the contractor's task per reel is to: apply and link a Library-supplied barcode; verify the item-level data (title/LCCN, shelf number, dates, copy number, footage); identify acetate or polyester base and flag vinegar odor; insert a security strip (Master Negatives only); rehouse in Library boxes and relabel as needed; and place Master Negatives in 12-reel boxes for Fort Meade. Please also confirm that creating new holdings or bibliographic records is outside the contractor's scope.C.3.1 Retrieval of Microfilm: •Contractor shall retrieve microfilm from the designated shelving areas and the microfilm vault onsite at the Capitol Hill location. The Contractor shall retrieve a batch of microfilm and prepare the microfilm for inventory by creating and/or updating the Holdings record (HREC). A batch will consist of one shelf of microfilm of about 35 reels by shelf numbers also known as (call number in the FOLIO system) stored on the shelf. Archival Master film has yellow labels and Print Negative film have pink labels. Also see C.3.2.1 Review and Verify IREC & C.3.2.2 Create/Updated HREC
38Please confirm that reel labels carry romanized ("Americanized") titles and that reading or transliterating foreign-language content is not required. If so, may the Project Manager's multi-language microfilm experience requirement (Section C.4.3) be met through general experience handling foreign-language collections?This is confirmed, reading or transliterating foreign-language content is not required.
39Please confirm the corrections authority described during the tour: contractor staff may fix obvious item-level discrepancies (for example a copy number), and must stop and refer to the COR any record that does not appear to match the reel. Is an exception referred to the COR billable as a processed reel?Stop and refer to COR for clarification, an exception is not billable as the full inventory is not complete.
40About how many reels make up a typical cart or batch, and how many carts or reels does an experienced Library staff member complete per day? (A "cart a day" was mentioned at the site visit.)A batch consists of 34 reels, which is one shelf of a stand up per row. A spread sheet will be provided showing each shelf location.
41Please confirm that invoices may cover all reels processed, verified against contractor counts, without waiting for the Library's sampling QC. When does the three-working-day correction period for a rejected batch begin?We will complete QC before a batch is accepted and able to be invoiced.

The three-day period begins the next business day from notification of rejected batch.

42For the initial task order, which was described as essentially all newspapers, roughly what share of reels are long runs of the same title versus single reels of different titles? What is the expected split between Master Negatives and Print Masters?"Long runs" are unknown at this time. The percentages of master negative (38.5%) and print negatives (61.5%) are what we currently have ready. These percentages will change on out years as more reels are corrected and made ready for inventory.
43Approximately what percentage of reels are acetate, and how many are expected to show vinegar syndrome? Is the contractor's task for a reel that fails the odor test limited to flagging and segregating it?Current reels ready for inventory should consist of polyester reels. There may be some acetate but this will be a very small percentage. In years to come, more acetate film will be added to the reel mix.
44Please confirm that the Library will supply all barcodes, barcode readers, label printers, security strips, replacement reel boxes, clamshell 12-reel boxes, labels, carts and laptops. If the contractor is expected to supply any item, please list it.Library will supply all listed items
45Please confirm that the three cubicles shown on the tour will be dedicated to contractor staff, and that the secure overnight lockup will be available by March 2, 2027. With COR approval, may contractor staff work at a standing station inside the vault, given that Wi-Fi coverage there was uncertain?Cubes will be dedicated to contractors with secure lock-up.

Per Section C.3.1 Retrieval of Microfilm: Because of the lower temperatures in the Adams vault storage area, actual inventory work (searching ILS, creating/updating holding records, creating item records, etc.) will not be performed in the Adams vault, but will be performed in the assigned office work area (inventory area). The Contractor will be responsible for retrieving items from the Adams vault for inventory actions and returning approved items to the Adams vault in the order retrieved. Book trucks will be provided for the transport of material to and from the vault(s).

46Because full adjudication is required before any training or system access (Q&A 9), may background-investigation paperwork be submitted immediately at award?Yes
47Will any reels require a higher level of investigation than the standard contractor fitness determination? If so, approximately what share?Gold level background checks
48Section F.1pg 17Section F and Q&A 7 give hours of 8:30 a.m. to 5:30 p.m., extendable to 6:30 a.m. to 6:00 p.m. with adequate supervision. Please confirm in writing the hours contractor staff may work, and what supervision is required outside 8:30 a.m. to 5:30 p.m.The extended hours in Section F.1 have been adjusted to 6:30 AM - 8 PM. An LOC supervisor has to be on-site at the building when contractor personnel are working which will be during stated hours (extendable) as coordinated with the COR. The contractor shall coordinate with the COR for any work to be conducted at Library facilities. Additionally, no weekend work will be possible. This would require an LOC supervisor to be on-site at the building when contractor personnel are working on the weekend. There will not be an LOC supervisor on site on weekends.
49Section CWhat reports does the Library require (for example daily or weekly counts by staff member and section, batch control slips, exception lists), and is there a required format?Reports are covered in the statement of work Section C.5. Deliverables. No required format as long as information is provided.
50Please clarify the answer provided in the initial question 6 in the initial Question and Answer. The answer states that offerors may not double bill for the Project Manager (PM) if the PM performs inventory work. However, since there is not a line item to bill separately for a PM, all PM labor would be presumably captured under the general firm fixed price rate. Moreover, the position description for the PM in C.4.3 describe the PM as working on site and who is experienced in performing the inventory work. This implies that the PM is expected to perform inventory work as a part of his/her duties. Are offers expected to propose a separate labor hour rate for the PM?This is a correct interpretation. The previous answer saying a PM could not double bill was actually made in error. There are no labor lines in this contract. The per-reel invoicing is inclusive of all prices, which would include the PM's inventory work contributions.
51Please confirm that the Quality Assurance portion of the Batch Sheet will be completed by Library staff while reviewing contractor staff and NOT by contractor staff.QA will be completed by Library staff.
52The solicitation requires batches of approximately 35 reels to be completed within three working days, including Library quality assurance and problem resolution. Please clarify whether the three-day period includes time during which the batch is awaiting Library review, and how compliance will be assessed when government review or resolution of referred problems delays completion.The three-day period will consist of day material retireved from the vault until it is ready to be sent to storage and inventory tasks completed. This time will not include QC verifications.
53C.3.1Is the Library able to provide the estimated percentage of microfilm reels for which contractors will need to create new (a) Holding Records or (b) Item Records?Per SOW Section C.3.1 Retrieval of Microfilm: Contractor shall retrieve microfilm from the designated shelving areas and the microfilm vault onsite at the Capitol Hill location. The Contractor shall retrieve a batch of microfilm and prepare the microfilm for inventory by creating and/or updating the Holdings record (HREC). A batch will consist of one shelf of microfilm of about 35 reels by shelf numbers also known as (call number in the FOLIO system) stored on the shelf. Archival Master film has yellow labels and Print Negative film have pink labels. Also see: C.3.2.1 Review and Verify IREC & C.3.2.2 Create/Updated HREC
54Is the Library able to provide an estimated percentage of multi-reel titles (i.e., a single bibliographic and holding record that spans 2 or more reels)?This is unknown
55L.5 General Instructions to Offerorspg 16Would the Government please confirm that the font in tables and figures can be smaller than 12-point (i.e., 10 point) as long as it remains legible?Yes, 10 pt is acceptable for tables.
56L.6 - Volume 3) Past Performancepg 17Offeror shall provide Attachment J2 - Past Performance Questionnaire, to each reference for each of the three (3)
contracts referenced above and in the Minimum Qualifications submission. Does the “Minimum Qualifications submission” refer to the items listed in the prior paragraph (i.e., past three years, Federal/State/local contract, etc.)?Yes, that is correct.
57M.2 Evaluation Factor 2 Key Personnelpg 20Offerors that propose more qualified Key Personnel or Key Personnel with more experience may be evaluated more favorably.
Could the Government provide clarification that “more qualified” refers to higher qualifications of key personnel and not the number of key personnel proposed?"More qualified" refers to the qualifications of the key personnel, and not the quantity of inviduals performing the work.

File details come from the government source that posted it. Updated .