This is Amendment No. 0002 to Solicitation 030ADV27R0009 issued by the Library of Congress Contracts and Grants Directorate, effective November 19, 2026. The amendment updates an existing solicitation for microfilm inventory services at the Library of Congress with a proposal deadline of November 30, 2026 at 12:00 PM EST. The amendment incorporates updated Questions and Answers (Attachment J6 dated 11-19-2026), removes specified text from Statement of Work Section C.5.3 regarding billing/invoices, edits working hours in Section F.1 to extend operations from 6:30 AM to 8:00 PM when adequate supervision is provided and quality metrics are met, and updates Section J to reflect the revised attachment list including the new Q&A document.
The underlying solicitation requires a contractor to inventory Archival Master and Print Negative microfilm reels for the Library's Preservation Services Division, with an anticipated volume of 5,000 to 15,000 reels annually. Work includes retrieving microfilm from the Adams Building Microform Vault, creating and updating holding records (HREC) and item records (IREC) in the FOLIO integrated library system, determining film base composition (acetate versus polyester), identifying deteriorated film through sensory testing, applying barcode labels, and preparing materials for transport to off-site storage at Fort Meade, Maryland or return to vault storage. The contractor must complete batches of approximately 35 reels within three working days, maintain weekly statistical reports, perform quality control inspections with critical error tolerance not exceeding 1% and significant error tolerance not exceeding 3%, and provide an on-site Project Manager with minimum two years' experience in microfilm collections and cataloging expertise. Work is performed on-site at the John Adams Building, Capitol Hill Campus, 101 Independence Avenue SE, Washington, DC 20540, during standard operating hours of 8:30 AM to 5:30 PM Monday through Friday, excluding federal holidays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 12
0002 11-19-2026 See SCHEDULE
Contracts and Grants Directorate Library of Congress
101 Independence Ave. SE LA 325 Washington DC 20540-9411
Contracts & Grants Directorate Library of Congress
LA 325
101 Independence Av SE Washington DC 20540-9411
To all Offerors/Bidders
030ADV27R0009
X
X X
See CONTINUATION Page
X 1
Robinson, James
BLOCK 14 ADDENDUM
1. Answer Offeror questions. See updated Attachment J6 Question and Answers dated 11-19-2026. The deadline for submission of proposals remains unchanged at 11/30/2026 at 12:00 PM EST.
2. Remove text in the Statement of Work at Section C.5.3 as noted in red text.
3. Edit working hours in section F.1 as noted in red text.
4. Edit Section J List of Attachments as noted in red text.
030ADV27R0009 0002 Section C
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Microfilm Inventory
Statement of Work
C.1 BACKGROUND
The Library of Congress (Library) is the world's largest library collection with more than 175 million items. The collection includes books and other printed materials, serials, manuscripts, photographs, maps, music, microfilm, audio recordings, and moving images. The Library’s Preservation Services Division (PSD) under Preservation Directorate, Discovery and Preservation Services, is a stewardship division responsible for services that modify or reformat materials for preservation and for the management information systems required to enact preservation services at scale. The division is the custodian of the microform collection at the Library; facilitates after-market binding for library materials; business support services for contracted preservation services; and development and maintenance of the management information systems and technologies required for effective operations of preservation activities across all Preservation Directorate divisions.
The PSD requires contractor support to inventory Archival Master and Print Negative microfilm collection reels of vast newly acquired and retrospectively selected collections. This critical component of PSD’s inventory management supply chain requires the physical and intellectual verification of data elements to ensure accuracy based on the Library’s criteria. The Contractor shall play an integral part in managing the collections by conducting various inventory tasks as detailed in Section C.3 Requirements.
This microfilm represents a large variety of library formats such as newspapers, serials, legal gazettes and periodicals, and special collections including but not limited to monographs, manuscripts, musical scores, telephone directories, and copyright deposits. The Archival Master microfilm collection is currently stored in two locations. One major reason for conducting this inventory project is the preparation of the collection for its final move to a single off-site storage location at Ft Meade, MD. The actual inventory work under this contract will be completed on-site in office space provided by the Library.
The Library seeks a qualified Contractor to create and/or update holding records and item records in the Library of Congress Integrated Library System (FOLIO) for the microfilm holdings stored in the Adams Building Microform Vault.
The Contractor will also determine the microfilm base (acetate, polyester) of each reel and identify items in need of preservation actions. The Library anticipates inventorying between 5,000 to 15,000 reels per year; the Contractor is responsible for determining its hours of operation to fulfil the requirements of this contract.
C.2 SCOPE
The Contractor shall review, verify, create and/or update holding records (HREC), in the FOLIO system. Prepare completely inventoried Archival Master reels for transport to Ft Meade offsite storage facility and Print Negatives to the vault in the Adams building on Capitol Hill. This includes rehousing and applying label barcodes.
C.3 CONTRACTOR REQUIREMENTS
C.3.1 Retrieval of Microfilm
The Contractor shall inventory microfilm and prepare microfilm to be stored onsite on Capitol Hill and boxed for offsite storage.
• Contractor shall retrieve microfilm from the designated shelving areas and the microfilm vault onsite at the Capitol Hill location. The Contractor shall retrieve a batch of microfilm and prepare the microfilm for inventory by creating and/or updating the Holdings record (HREC). A batch will consist of one shelf of microfilm of about 35 reels in order by call number. Archival Master film has yellow labels and Print Negative film have pink labels.
• Library staff will prepare the batches of microfilm for the Contractor staff that are stored on shelves in a secure location outside and inside the microfilm vault. Library staff may continue to add more microfilm to the shelves, but Contractor staff shall regularly retrieve the microfilm and establish batches to ensure a constant workflow.
• Archival Master microfilm reels in need of inventory are stored in the Adams Building Microform Vault, and some are stored in a secure location on designated shelves. Batches will be moved from the vault and shelving areas, transported to the inventory work area via book trucks, and returned to the secure areas and vaults at close of business.
• Library staff will monitor the movement of the batches by Contractor staff from the Adams Vault to the inventory work area. The Contractor shall prepare a daily Batch Control Slip (see Appendix 1– “Batch Control Slip”) containing a sequential batch number; the shelf number of the first and last microfilm boxes; the number of reels per shelf number; the date inventory of the batch was started; the name of the staff member to whom it is assigned. This slip will be updated to indicate when and to whom the batch is assigned to for quality control, when it is completed and ready to be returned to the collection. Batches will be completed within three (3) working days of removal from the shelf and returned to Library staff for Quality Assurance (QA), in the same order (ascending by shelf number with corresponding reels in chronological order) as received.
• Upon completion of the Contractor inventory work and Library staff quality assurance, the Contractor will take the Archival Master microfilm and house the single reel microfilm boxes into 12-reel microfilm boxes. Library staff will be responsible for retrieving the 12-reel boxes to be transported to Ft. Meade. The Print Negative microfilm will need to be transported to the vault. Library staff will be responsible for reshelving the Print Negative film in the vault.
• Because of the lower temperatures in the Adams vault storage area, actual inventory work (searching the Integrated Library System (ILS), creating/updating holding records, creating item records, etc.) will not be performed in the Adams vault, but will be performed in the assigned office work area (inventory area). The Contractor shall be responsible for retrieving items from the Adams vault for inventory actions and returning approved items to the Adams vault in the order retrieved. Book trucks will be provided for the transport of material to and from the vault(s).
C.3.2 Microfilm Collection Materials: Holding record (HREC) and Item record (IREC) CREATE/UPDATE/VERIFY FieldsC.3.2.1 Create/Update HREC
LC staff will create minimal holdings record (HREC) for each microfilm bibliographic record established prior to inventory. This HREC will show holding type, permanent location, copy number, call number type, call number, and public note.
• Contractor staff shall create minimal holding records that will show permanent location, copy number, call number type, call number, and public note when a shelf number has Archival Master reels (generally yellow box label). Item records will be attached to the HREC.
• Contractor staff shall create minimal holding records that will show permanent location, copy number, call number type, call number, and public note when a shelf number has negative reels (generally pink box label) that will reflect only printing negative reels.
C.3.2.2 Create/Update IREC
• If there is no existing Item Record, the Contractor shall create one by clicking the “Add Item” button.
• The Contractor shall attach a barcode to each box of microfilms. The barcode will be placed on the side of the box. When holding the box with the label facing staff, the barcode will be placed on the right side of the box, to the right side of the thumb notch. The Contractor shall scan the number into the Barcode field.
• The Contractor shall ensure that the Effective Location for Item field reads “Master Negatives” for Archival Master and “n-Print Negatives” for print negatives.
• The Contractor shall ensure that the item record’s Material Type field reads “Microfilm.”
• The Contractor shall also use information from the box label to fill the item record’s Enumeration and Chronology fields. See Attachment J4 - Appendix 3 for correct entering of Enumeration and Chronological information.
• The Contractor shall ensure that Archival Master will be recorded as “Metal moniker: Gold - gold” in the item record’s Statistical Code field. Print Negatives will be recorded as “Metal moniker: Silver: silver”.
• The Contractor shall ensure that the item record’s Permanent Loan Type field will read “No request – check out” and its Item Status field will read “Available”.
• The Contractor shall ensure that the item record’s Copy Number field contains the same number that follows the word “Copy” or “Set” in Copy number field in the holdings record (“1”, “2”, etc.)
• If there is a number on the label for feet of microfilm, the Contractor shall enter that in the item record’s “Year, caption” field.
• To indicate that the Item Record has been inventoried, the Contractor shall create a new Note field in the item record using “Add note”. The Contractor shall record the Note Type as “Master Negative Inventory”.
• The Contractor shall put on white gloves and remove the reel from the box.
• The Contractor shall conduct a “sniff test.” The Contractor shall use the wafting technique to draw air up from the box of film toward their nose. If there is a vinegar smell, the box will be flagged with a green slip, marked “vinegar.”
• The reel will be held up to the light. If the light transmits through the reel, the film is polyester. If the light does not transmit through, then it is acetate. All acetate films will be marked with a green dot placed beside the red inventory dot on the upper right-hand corner of the box label.
• The Contractor shall ensure that “Acetate Film” or “Polyester Film” is also recorded in the Note Type.
• If the reel is metal, the Contractor shall record that information in the Note Type as “Metal Reel” and mark the box with a green flag.
• If the item needs to be re-boxed/relabeled, the Contractor shall record that in the Note Type as “Re-box/relabel”.
• If the leader of microfilm falls off, the Contractor shall record that in the Note Type as “Damaged Film” and will mark the box with a green flag marked as broken film.
• The Contractor shall place a red dot, with a felt tip pen, on the upper right corner of the label, to state that this box was inventoried.
• If there is no yellow label reading “Library of Congress Master Negative Return to the Microfilm Vault” on the top of the Archival Master box, the Contractor will add one.
• To avoid the possible mis boxing of reels, the Contractor shall not have more than one reel out of a box at a time at their inventory workstation.
• The Contractor shall complete the Item Record update by saving the record.
• At which point the ILS system allows this to be done, The Contractor shall ensure that all item records are in correct chronological or other appropriate order, before moving on to the next shelf number.
C.3.2.3 Review and Verify
The Library staff shall examine fields including but not limited to the following in the IREC, to ensure that the IREC matches the item in hand:
• Title
• Location
• Call Number
• Copy Number or Set Number
• Enumeration
• Chronology
• Caption
For each item record representing a single reel within the collection:
• Verify the information in the IREC with the physical item:
o Title (Titles may appear to be truncated in FOLIO the ILS; subtitles are not always included. When an exact match cannot be verified in FOLIO the ILS, refer questions to the Library project coordinator.)
o Enumeration (should match the reel box) o Chronology (if present, should match the reel box)
• Verify other item record fields (these should be the same for each item):
o Statistical code (should be Metal moniker: Gold -- gold) for Archival Masters o Statistical code (should be Metal moniker: Silver: silver) for Print Negative o Material type (should be Microfilm) o Copy number (should be 1) o Effective location for item (should be Archival Masters) Effective Location for an item is derived from the
Holdings record. If the holding’s location is "n-Print Negatives" or "Master Negative" the item Effective Location will reflect the same.
o Note (should have lines for Note type: Polyester film and Note type: Master Negative Inventory)
• After a batch has been approved by LC staff, the Contractor will return Print Negatives to the secure area and box the Archival Masters by taking 12 single reels and placing the single reels in 12-reel boxes to prepare for offsite storage.
C.3.3 Handling of the Collection
All Library of Congress collection materials must be handled with care to avoid damage. The Contractor shall follow these guidelines whenever materials are handled.
The contractor shall immediately report to Library staff any evidence showing that a range of microfilm has been affected by water leaks, past or present.
Boxes with any evidence of dampness, mold, mildew or insects shall be referred to the Library project coordinator. All microform materials will be handled with gloves and used in a clean workspace. Food or drinks are never allowed in the stacks or at the workstation. No food or drink should be placed or kept anywhere near collection materials. No metal paper clips or adhesives, such as tape or Post-it notes, will be placed on or in any collection materials. Boxes will be placed on shelves in an upright position with the label facing out. All boxes that are damaged or missing flaps will be flagged with a green flag marked “box/relabel.” Library staff will relabel and replace the microfilm boxes as needed. For sample of flag, see Appendix 2 – Green Flag.
When handling actual reels of microfilm, clean white gloves (to be supplied by the Library) must be worn. A new clean pair of gloves must be used every day, to help reduce dirt and prevent possible surface scratching of the microfilm.
When the supply of white gloves is running low, the Contract supervisor will notify the COR by email that more gloves need to be ordered. This should be done while there is at least 2 weeks’ supply on hand, to assure time and funding to place and receive the order.
C.3.4 Referral of Problems
Contractor shall identify problems encountered during the inventory process by inserting a green flag. Green flagged items remain on the book truck until the entire batch is completed, and Library staff has conducted QA and Problem Resolution.
C.3.5 Completion of Batch
After a batch of microfilm has been completed, the Contractor shall notify the Library project coordinator and move the book truck to the QA area. The Statistical Batch sheets attached to the book truck will be annotated to show the number of reels completed, the number of shelf number groups completed, number of problem shelf number groups marked, number of acetate reels found, number of vinegar-smelling reels found, and the time and date of the batch completion.
A copy of the complete Statistical Batch sheets will be delivered to the Library project coordinator and COR at the end of each week.
C.4. OTHER REQUIREMENTS
C.4.1 Training of Staff/New Staff
The Library will provide the initial one-week training and any additional training needed to incorporate changes in procedures or workflow. The Library will provide one week of training for the new staff. Notification of staff replacement and of such training being needed must be given to the COR at a minimum one week prior to training date.
C.4.2 Government Furnished Property
The Library will provide a Library-owned laptop with access to the FOLIO system for each Contractor staff. Unique logins and passwords will be supplied to each for each Contract staff. The Library will provide network printers and a barcode reader for each Contractor staff. The Library will also supply book trucks to be used to move microfilm batches to and from the microfilm vault and shelving area. The Contractor is responsible for always securing this equipment.
C.4.3 Key Personnel Summary
Project Manager. The Contractor shall provide an on-site Project Manager with the following required skills:
• Have a minimum of two [2] years’ experience performing similar work to what is required in this SOW in a major research Library or heritage organization whose microfilm collections are in various languages.
• Have a minimum of two [2] years of experience or understanding of cataloging using the MARC records classification for monographs and serials.
• Have a minimum of one [1] year training staff and handling assignments and monitoring the inspection of work.
• Have the ability to compile statistical data to produce daily, weekly, monthly and annual reports of work performed.
• Demonstrated experience using an ILS system.
• Demonstrated experience processing materials in various languages.
• Have good written and oral communication skills.
C.4.4 Other Personnel
Inventory Clerk. The Contractor may provide an on-site Inventory Clerk with the following required skills:
• Have a minimum of one [1] years of experience or understanding of cataloging using the MARC records classification for monographs and serials.
• Demonstrated experience using an ILS system.
• Demonstrated experience processing materials in various languages.
• Have good written and oral communication skills.
• Have the ability to compile statistical data to produce daily, weekly, monthly and annual reports of work performed.
The Contractor shall keep the COR informed about staffing issues and shall submit the Library’s required 1881 form and/or other forms as required, to the COR for approval within 3 business days of when vacancies arise. The Contractor shall return all library issued equipment (ID pass and Yubi-Keys) to the COR within two (2) business days prior to departure.
C.4.5 Kick-off Meeting
The Contractor shall attend a kick-off Meeting following initial award with the COR no later than ten (10) business days after the date of award. The purpose of the Conference is to discuss technical and contracting objectives of this contract and confirm any details of the work for both parties. The Conference will be held at either the Library or telephonically.
C.5. DELIVERABLES
C.5.1 Weekly Statistical Report
The Contractor shall complete and maintain a weekly statistical report. The Contractor shall prepare a weekly statistical report summarizing batches completed. Each report will show the sequential week number (week 1, week 2 etc.) of the contract, and the dates covered by that week. The report will be sent electronically to the COR and will contain the following:
C.5.1.1 The batch numbers for batches completed.
C.5.1.2 The number of microfilm boxes (reels) completed per batch (including range of shelf numbers per batch) and the total cost for the reels completed.
C.5.1.3 The number of errors identified through Contractor quality assurance and corrected.
C.5.1.6 The total hours of and cost for the Contractor supervisor and Contractor clerks for that week.
C.5.2 Periodic Progress Reports
The Contractor shall also submit periodic reports to the COR of progress during each order. The reports should provide a narrative that summarizes key events or activities, noting special problems or difficulties encountered, and addressing proposed methods for correction of such problems as the work continues. The reports shall indicate the agreed-upon project schedule, progress relative to the schedule, and shall clearly state any deviations from the schedule with accompanying explanations. The reports should note changes in procedure and provide statistics that indicate the accomplishments of the period described.
The frequency of progress reports for a given order shall be established at the order level.
C.5.3 Billing/Invoices
The Contractor will identify an Administrative/Accounting person to supply the COR with invoices and to handle any invoice questions and concerns. An invoice will include completed orders. The Contractor shall invoice only completed batches (number of reels). for completed orders.
C.5.4 Deliverables Schedule
Reference Deliverable Due Date
C.3.1 Batch Completion Within three (3) working days of removal from the shelf
C.4.1 Notification for staff replacement and training
Training needed shall be provided to the COR at a minimum one week prior to training date
C.5.1 Weekly Statistical Reports Weekly
C.5.2 Periodic Reports Weekly and Monthly
C.4.4 Staffing Change Notify the COR within (3) days
C.4.5 Kickoff Meeting Within ten (10) days after POP Start
C.6.1 Inspecting A batch will not be off the shelf for more than
(3) days
C.6. TESTING AND QUALITY ASSURANCE
C.6.1 Inspections
Quality control inspections will be designed to evaluate the accomplishment of the following activities by contractor staff.
C.6.1.1 Accurate verification/creation of online records (both content and linking).
C.6.1.2 Correct placement and linking of barcode labels.
C.6.1.3 Accurate documentation of the inventory process.
C.6.1.4 Accurate identification of acetate/polyester film.
C.6.1.5 Accurate identification of deteriorating film (sniff test).
C.6.1.6 Accurate identification of defective microfilm boxes.
C.6.1.7 Accurate categorization and routing of problem reels.
C.6.1.8 Correct completion of problem resolution.
The unit of work will be a box containing one (1) reel of microfilm; Batches will consist of a one shelf of microfilm of about 35 reels by shelf numbers. Contractor shall return the cart they are working on to the vault or secure cage area each night and retrieve in the morning. No reels will be left out in the Contractor’s working area. A batch will not be off the shelf for more than three days, including LC problem resolution and quality review time.
C.6.2 Error Definition
The types of errors that will be evaluated in the Quality Control process are divided into two (2) categories: Critical errors and significant errors. Minor errors that do not meet the critical or significant level would be addressed as needed.
C.6.2.1 Critical Errors
Critical errors are those that affect the ability of the microfilm to be retrieved. They include:
Incorrect linking between Item, Holdings, and Bibliographic Records (includes both mis-linking as new records are created and failure to identify existing mis-linked records);
Wrong Bibliographical Record used as basis for inventory;
Barcode in wrong Item Record
Missing Barcode label
Incorrect shelf number label or failure to recognize shelf number discrepancies, i.e.
mismatches between Bib Record, Holdings Record, microfilm and shelf list card
Incorrect chronology (date) in the item record
Failure to re-sequence Item Records
Wrong type of reel linked to holding record. (i.e. pink label item on Archival Master (yellow) negative HREC)
Error on Batch Slip.
The Library will reject the entire batch if the error rate for Critical Errors exceeds 1%. The contractor must correct all errors.
C.6.2.2 Significant Errors
Significant errors are those that affect program management and the integrity of the data collected:
Incorrect placement of the item barcode label on a box;
Incorrect recording of inventory activity, i.e. lacking item statistical category;
Film type error (acetate vs. polyester or Archival Master Negative versus Print Negative)
Incorrect identification or routing of damaged or problem microfilm.
The Library will reject the entire batch if the error rate for significant errors exceeds 3%.
The Contractor is urged to question unclear or confusing entries. The contractor must correct all errors.
(End of SOW)
030ADV27R0009 0002 Section F
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019)
Place of Performance: Inventory work performed under this contract shall be performed at:
The Library of Congress
John Adams Building (Capitol Hill Campus)
Library of Congress
101 Independence Ave SE, DC 20540
Storage work takes place at:
Print Master - storage
John Adams Building (Capitol Hill Campus)
Library of Congress
101 Independence Ave SE, DC 20540
Archival Masters - storage
Library of Congress (Ft. Meade, MD)
902 Reece Road Fort George G. Meade, Fort Meade Army Base, Fort Meade, MD 20755-5045
The overall period of performance shall be as stated in section B.
The Library’s standard operating hours are from 8:30 AM through 5:30 PM, Monday through Friday, excluding Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government-directed facility closings. Contractors may extend working hours from 6:30 AM to 6:00 8:00 PM if demonstrably adequate supervision is provided and all quality assurance metrics are within contract ranges. The contractor shall coordinate with the COR for any work to be conducted at Library facilities.
(End of Clause)
030ADV27R0009 0002 Section J
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
Identifier Title Date Number of Pages
1 Attachment J1 – SCA WD 2015-4281 Rev 39 08-22-2026 10
2 Attachment J2 - Past Performance Questionnaire 10-27-2026 2
3 Attachment J3 - Evaluation Pricing Spreadsheet 11-04-2026 2
4 Attachment J4 - Microfilm Inventory Appendices 1-4 08-14-2026 17
5 Attachment J5 - Initial Order Statement of Work 10-27-2026 1
6 Attachment J6 - Questions and Answers 11-19-2026 2
End of Document
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK |
| SECTION F - DELIVERIES OR PERFORMANCE |
| F.1 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019) |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS |
| SECTION J - LIST OF ATTACHMENTS |
File details come from the government source that posted it. Updated .