030ADV26R0049.pdf
PDF 484 KB Posted
- Attached to
- Audio System Modernization
- Solicitation number
- 030ADV26R0049
- Issued by
-
Library of Congress
About this file
Solicitation Summary: Design and Implementation of Upgraded Audio Amplification System for Coolidge Auditorium
This is a Request for Proposals (RFP) issued by the Library of Congress for design and implementation of an upgraded audio amplification system for the historic Coolidge Auditorium. The solicitation number is 030ADV26R0049, with an offer due date of August 25, 2026 at 12:00 PM EDT. This is an unrestricted acquisition for commercial products and services with a firm-fixed-price contract structure.
The contractor shall design and implement a complete audio system modernization replacing the existing analog infrastructure with an IP-based solution utilizing Dante audio transport protocol over Ethernet. Key deliverables include: site survey and system design (due February 5, 2027), infrastructure removal of obsolete equipment (September 29, 2027), installation of gigabit ethernet switches with redundancy, Dante cabling and connectivity to multiple locations throughout the venue, front-of-house speakers and line arrays with acoustic measurements, three audio consoles (front-of-house extended Yamaha DM series, monitor mix compact Yamaha DM series, recording booth console), wireless receiver compatible with existing Shure ULX-D microphones, solid-state recording device, recording computers with Dante Virtual Soundcard, custom technical furniture (audio desk, lighting desk, monitor cart, lectern), and integration of government-furnished equipment including intercom system, PTZ cameras, and lighting console. Personnel must possess CTS (Certified Technology Specialist) certification for installation/commissioning and Q-SYS certification for control system programming. The project includes one year of warranty coverage following system acceptance (September 28, 2027 through September 27, 2028). Proposals are evaluated based on technical approach (most important), corporate experience, past performance, and price. All travel is non-reimbursable. Proposals must be submitted in two volumes (technical and price) via email with a maximum 20MB file size.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
See SCHEDULE
030ADV26R0049 08-03-2026
Adejuwon, Mojisola (202) 707-0400 08-25-2026
12:00 PM EDT
Contracts and Grants Directorate Library of Congress
101 Independence Ave. SE LA 325 Washington DC 20540-9411
X
N/A
X
DELIVERY
See Sections D&F for delivery instructions.
Contracts & Grants Directorate Library of Congress
LA 325
101 Independence Av SE Washington DC 20540-9411
Submit Invoices through https://www.ipp.gov Washington DC 20540
See CONTINUATION Page
See CONTINUATION Page
X X
X 1
Adejuwon, Mojisola
030ADV26R0049
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 LC52.216-3 CONTRACT TYPE (JUN 2016)
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D - PACKAGING AND MARKING
D.1 LC52.211-1 DELIVERIES (APR 2015)
D.2 LC52.211-2 DELIVERIES TO THE LIBRARY OF CONGRESS, CAPITOL HILL CAMPUS (JUN 2021)
D.3 LC52.231-1 PAYMENT OF POSTAGE FEES (MAY 2015)
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019)
F.2 SCHEDULE OF EVENTS/DELIVERABLES
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 LC52.201-3 CONTRACT ADMINISTRATION (AUG 2015)
G.2 LC52.204-5 IDENTIFICATION AND BUILDING PASSES (SEP 2024)
G.3 LC52.232-1 LIBRARY OF CONGRESS INVOICE INSTRUCTIONS (DEC 2022)
G.4 LC52.232-2 SCHEDULE OF PAYMENTS (JUN 2015)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 LC52.201-1 CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPOINTMENT AND AUTHORITY (JAN 2016)
H.2 LC52.203-1 CONTRACTOR PUBLICITY (OCT 2013)
H.3 LC52.204-1 COLLECTIONS SECURITY (DEC 2013)
H.4 LC52.204-2 CONDUCT ON LIBRARY PREMISES (JUL 2021)
H.5 LC52.204-3 INFORMATION SYSTEMS SECURITY (JUL 2024)
H.6 LC52.204-27 HANDLING OF FEDERAL RECORDS (JUL 2021)
H.7 LC52.204-4 CONTRACTOR EMPLOYEE FITNESS (SEP 2024)
H.8 LC52.237-1 KEY PERSONNEL (AUG 2014)
H.9 LC52.237-2 CONDUCT OF WORK (MAY 2015)
H.10 LC52.239-1 INFORMATION SECURITY (JUL 2025)
H.11 LC52.244-1 SUBCONTRACT NOTIFICATION (OCT 2016)
030ADV26R0049
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2026)
I.3 LC52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS (DEV) (FEB 2016)
I.4 LC52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE
ORDERS - COMMERCIAL ITEMS (DEV) (MAY 2015)
I.5 LC52.227-1 ASSIGNMENT OF COPYRIGHT TO THE LIBRARY OF CONGRESS (DEC 2001)
I.6 LC52.228-70 INSURANCE REQUIREMENTS - WORK ON LIBRARY PREMISES (DEC 2014)
I.7 LC52.232-25 PROMPT PAYMENT (DEV) (JUL 2013)
I.8 LC52.233-1 52.233-1 (DEV) DISPUTES (MAY 2014)
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (OCT 2025)
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L.1 LC52.215-1 PROPOSAL SUBMISSION INSTRUCTIONS - BEST VALUE TRADE-OFF (JUL 2016)
L.2 LC52.233-2 PROTESTS TO THE LIBRARY OF CONGRESS (DEC 2013)
SECTION M - EVALUATION FACTORS FOR AWARD
030ADV26R0049 Section B
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 LC52.216-3 CONTRACT TYPE (JUN 2016)
This is a solicitation for a firm-fixed price contract.
(End of Clause)
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1.00 JOB _______________
Design and Implementation of Upgraded Audio Amplification System for the Coolidge Auditorium Contract Period: Base POP Begin: 09-29-2026 POP End: 09-28-2027
0002 1.00 YR _______________
One (1) Year Warranty Contract Period: Base POP Begin: 09-28-2027 POP End: 09-27-2028
GRAND TOTAL _______________
030ADV26R0049 Section C
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 OVERVIEW / BACKGROUND.
The Library of Congress (Library) requires contract support to modernize the audio systems for the historic Coolidge Auditorium. The 485-seat venue was constructed as an addition in 1925 for the primary purpose of hosting chamber music concerts. During the mid-1990’s it experienced an upgrade to several components which included adding structed audio amplification, wall panels, floor boxes, audio patch bays, and equipment racks. This analog infrastructure is mostly inoperable, and most of the devices once connected have been decommissioned. To support the wide-range of performances, lectures, and other events that occur in the space – portable audio equipment is loaded in/out for every event. This modernization effort for the audio systems will replace the existing analog infrastructure with digital audio equipment to remove the use of audio equipment housed in road cases, visible cable runs through the house – and provide a modern audio solution that complements the original acoustic quality of the auditorium.
C.2 SCOPE. The Contractor shall design and implement a new audio system for the Library’s Coolidge Auditorium.
C.3 REQUIREMENTS.
The Contractor shall replace existing analog audio infrastructure and its associated devices with a modern IP based solution that utilizes Dante as the primary audio transport protocol over standard ethernet. The Contractor shall provide installation, commissioning, documentation, training, and warranty for the proposed solution.
C.3.1 Site Survey & System Design
A. Site Survey The Contractor shall coordinate with the COR to schedule and attend a site visit with Library staff and the Library of Congress’ Facilities Services Division to review the Coolidge Theater’s existing analog audio infrastructure – to include all wall boxes, floor boxes, cable paths, conduit, equipment racks, patch bays, amplifiers, mixers, speakers. During the site visit, the Contractor shall measure approximate distances for cable runs. Electrical power draw and heat load requirements shall also be discussed with the Facilities Services Division.
B. System Design
Within 60 days business days after the site visit, the Contractor shall submit to the COR a draft audio system modernization design for the Coolidge Auditorium that includes:
a. the final equipment list;
b. rack elevations; and
c. associated power draw and equipment heat loads.
Within 15 business days of receiving the draft system design, the COR will schedule meetings to discuss and finalize the system design.
C.3.2 Infrastructure Removal Services The Contractor shall remove all existing audio equipment – which includes
a. the existing mounted front-of-house loudspeakers,
b. subwoofers,
c. fills,
d. audio consoles,
e. patch bays,
f. amplifiers,
g. cabling,
h. and other audio devices located in the recording booth and backstage equipment racks.
The Library will provide the Contractor with a designated space to store inoperable equipment and infrastructure that Contractor removes. The Library will handle disposal of all items removed by the Contractor.
C.3.3 Audio Infrastructure
C.3.3.1 Gigabit Ethernet Switches The Contractor shall provide one (1) Primary Gigabit ethernet switch (Primary) and one (1) Redundant Gigabit ethernet switch (Redundant) which are rated for dedicated audiovisual traffic. The proposed switches shall be identical in make and model and will be installed in the existing equipment rack located in the auditorium’s recording booth. The Contractor shall setup the switches and provide and install any cables and power supply units required for operation.
C.3.3.2 Cabling & Connectivity The Contractor shall replace the existing analog audio cables and wall/floor box connectors that are located at key locations within the venue auditorium, with Primary and where identified, and Redundant connectivity. Connectivity shall include the following:
i. Recording Booth Mix Position. Primary and Redundant Dante connectivity to the Recording Booth mix position.
The Contractor shall utilize the existing cable paths, junction boxes, and conduits to install the cable runs.
ii. Backstage – Stage Right Wall. Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing wall box, backstage on stage right. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
iii. Backstage – Stage Left Wall. Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing wall box, backstage on stage left. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
iv. Backstage – Center Stage Door Right. Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing wall box, backstage to the right of the center doors. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
v. Backstage – Center Stage Door Left. Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing wall box, backstage to the left of the center doors. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
vi. Stage – Stairs Right. Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing floor box to the right of the stage stairs. This floor box is mounted on the ceiling underneath the stage, and accessible via side cut-outs and from the orchestra pit. The Contractor shall utilize existing paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
vii. Stage – Stairs Left. Redundant Dante connectivity in the form of two Ethercon connectors located in existing to the floor box to the left of the stage stairs. This floor box is mounted on the ceiling underneath the stage, and accessible via side cut-outs and from the orchestra pit. The Contractor shall utilize existing paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels.
Connection label names will be provided by the Library.
viii. Front of House – Rear Auditorium (Right). Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing video floor box, located on house right, in the rear of the auditorium.
The Contractor shall utilize the existing paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate, with etched connection labels. Connection label names will be provided by the Library.
ix. Front of House – Rear Auditorium (Left). Primary and Redundant Dante connectivity in the form of two Ethercon connectors located in existing video floor box, located on house left, in the rear of the auditorium. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new wall box faceplate with etched connection labels. Connection label names will be provided by the Library.
x. Front of House Mix Position. Primary and Redundant Dante connectivity to the Front-of-House mix position (rear of the auditorium) in the form of two Ethercon connectors located in existing video floor box, at center of the house in the rear of the auditorium. The Contractor shall utilize the existing cable paths, junction boxes, and conduits. The Contractor shall provide and install a new floor box faceplate with etched connection labels.
Connection label names will be provided by the Library.
xi. Front of House Speakers. Primary and if applicable, Redundant Dante connectivity to each of the Front-of- House speakers identified in section C.3.4. The Contractor shall utilize the existing cable paths, junction boxes, and conduits where possible and install new junction boxes and conduits if none exists.
xii. Jefferson Studio. Incorporation of the existing Primary and Redundant Dante connectivity to the Jefferson Studio from the Coolidge Auditorium recording booth.
C.3.4 Front of House Speakers The Contractor shall replace the existing Front-of-House loudspeakers, subwoofers, and fills – with modern line arrays, loudspeakers and fills. The Contractor shall specify and install appropriately rated conduit and junction boxes in locations where existing infrastructure does not exist.
C.3.4.1 Acoustic Measurement Prior to installation, the Contractor shall perform acoustic measurements to determine the appropriate speaker, number of speakers and/or line array sizing and aiming.
C.3.4.2 Rigging Prior to installation the Contractor shall document the existing loudspeaker locations, power availability, and rigging points to be re-purposed for this installation. Any new modifications or penetrations to the historic structure must be prepared for the Library’s Facility Services Division in the form of a digital presentation (MS PowerPoint or Keynote). The Library will provide a response within 30 business days of receiving the Contractor’s presentation to re-use and/or propose any new rigging points.
C.3.4.3 Speakers The Contractor shall propose a set of speakers. The proposed set of speakers may be active speakers, passive speakers, or a combination of both active and passive speakers. If the Contractor proposes the use of active speakers, information about the dimensions, power consumption, and heat output for each speaker must be provided. If the Contractor proposes the use of passive speakers, information about the dimensions of each speaker, and information about the proposed amplifiers shall be provided. Additionally, an equipment rack location, power consumption, heat output, and a rack elevation diagram must be provided for passive speakers.
C.3.5 Front-of-House Audio Console & Devices The Contractor shall provide one (1) extended style Yamaha DM series audio console for the purpose of mixing front-of-house audio. This console must be compatible with the Library’s existing Yamaha Rio 1608-D2 and Yamaha Rio 3224-D2 stage boxes (https://usa.yamaha.com/products/proaudio/interfaces/r_series_adda_2/index.html). The console must meet the following specifications:
Supports primary and redundant Dante connectivity;
Supports 48 mix buses;
Supports 120 mono input channels;
Supports 32 analog audio channel inputs;
Supports 16 analog audio channel outputs; and Has an expanded control interface.
The Contractor shall be required to setup the audio console and provide and install all cables required for operation.
This console shall be installed in the Front of House desk referenced in Section C.3.7.
C.3.5.1 Wireless Receiver The Contractor shall provide and install one (1) scalable wireless audio receiver that is compatible with the Library’s existing Shure ULX-D wireless audio microphones (Bodypack: : https://www.shure.com/en-US/products/wireless-systems/ulx-d_digital_wireless/ulxd1?variant=ULXD1%253D-G57 | Handheld: https://www.shure.com/en- US/products/wireless-systems/ulx-d_digital_wireless/ulxd2_sm58?variant=ULXD2%252FSM58%253D-G57 | Gooseneck:
https://www.shure.com/en-MEA/products/wireless-systems/ulx-d_digital_wireless/ulxd8?variant=ULXD8%253D-G51 ) that operate on the H-50 and G-57 frequency bands. The scalable wireless audio receiver must meet the following specifications:
Shall be licensed for 24 channels of ULX-D compatible audio devices;
Must support Primary and Redundant Dante connectivity;
Includes necessary antennas required for installation and operation;
Form factor must be one rack unit (1RU) in height; and Must include all cables required for connectivity and operation.
The Contactor shall coordinate with the COR on the ideal location for this device to be installed – either in the Front of House audio desk or the Recording Booth equipment rack, considering existing cable paths and proper antenna placement.
C.3.5.2 Solid State Recorder The Contractor shall provide one (1) rack-mount style, solid-state recording device for the purpose of recording audio for programs/performances that occur in the venue. The Contractor shall configure the device and provide and install any cables necessary for operation. The device must meet the following specifications:
A quantity of three (3) solid state media cards, at least 32GB capacity, that are compatible with the proposed solid state recording device, A quantity of one (1) media card reader that is compatible with the media cards, Includes the appropriate cable to receive input from the audio console, and Includes a power cable.
C.3.5.3 Recording Computer The Contractor shall provide and install one (1) computer that will be used to manage the Dante network and perform multi-track audio recordings. The computer must be installed on top of the Front of House Audio Desk referenced in C.3.7. The recording computer shall meet the following specifications:
Include a compatible keyboard and mouse;
Include One (1) 24” display monitor;
Include a licensed copy of Dante Virtual Soundcard;
Supports Reaper audio software; and Capable of operating as a stand-alone computer that will not be connected to the Library’s IT network domain, nor have access to outside internet.
C.3.6 Monitor Mix Audio Console That Contractor shall provide one (1) compact style Yamaha DM series audio console for the purpose of supporting the monitor mix position backstage. The audio console must be compatible with the Library’s existing Yamaha Rio 1608-D2 and Yamaha Rio 3224-D2 stage boxes (https://usa.yamaha.com/products/proaudio/interfaces/r_series_adda_2/index.html). The console must meet the following specifications:
Supports primary and redundant Dante connectivity;
Supports 48 mix buses;
Supports 48 mono input channels;
Supports 16 analog audio channel inputs; and Supports 16 analog audio channel outputs.
The Contractor shall configure the monitor mix audio console and provide and install all cables required for operation.
This console will be installed in the portable rack cart as stated in section C.3.8.2.
C.3.7 Recording Booth Audio Console & Devices The Contractor shall provide one (1) audio console for the purpose of recording program audio and acting as an alternate front-of-house mix position for simplified performances. This console must be compatible with the Library’s existing Yamaha Rio 1608-D2 and Yamaha Rio 3224-D2 stage boxes (https://usa.yamaha.com/products/proaudio/interfaces/r_series_adda_2/index.html). The console must support Primary and Redundant Dante connectivity.
The console must be installed on top of the existing desk located in the recording booth. The Contractor shall configure the console and provide all necessary cables and power supply units required for operation. The contractor shall provide new studio-style speakers to monitor audio in the recording booth.
C.3.7.1 Recording Booth Computer The Contractor shall provide one computer that will be used to manage the Dante network and perform multi-track audio recordings. This Computer will be installed on top of the existing desk in the recording booth. The recording computer shall meet the following specifications:
Include a compatible keyboard and mouse;
Include One (1) 24” display monitor;
Include a licensed copy of Dante Virtual Soundcard; and Must be capable of operating as a stand-alone computer that will not be connected to the Library’s IT network domain, nor have access to outside internet; and Includes any cables required for operation.
C.3.8 Technical Furniture
C.3.8.1 Front of House Audio Desk and Lighting Desk
C.3.8.1.A – Design Specifications The Contractor shall provide two (2) identical desks: one (1) dedicated to Front-of-House audio, and one (1) for Lighting Control. The desks shall be positioned in the rear of the auditorium behind row “S” when in use. The Audio Desk shall be of sufficient size to accommodate the audio console identified in section C.3.5, with adequate ventilation. The Lighting Desk shall be of sufficient size to accommodate an Ion Xe-20 lighting console (https://www.etcconnect.com/Products/Consoles/Eos-Consoles/Ion-Xe/Features.aspx?LangType=1033), which will be furnished by the Library and also provide adequate ventilation. Each of the desks shall meet the following specifications:
Accommodates two (2) technicians in a stationary seated position;
Includes a minimum of 12 rack spaces (12RU);
Includes two (2) VESA monitor arms;
Has an integrated cable management tray;
Incorporates a singular elevated mounting point for a Library provided PTZ broadcast camera (Sony IMLE-FR7);
Has an integrated power distribution unit (PDU);
Capable of navigating through the existing house door for rare occurrences when they might need to be removed;
Contains polyurethane casters;
Constructed of wood, and stained in a color that complement the venue;
Designed to minimize any impact on the venue’s acoustic properties;
C.3.8.1.B – Draft and Final Design Within 60 business days following the site visit, the Contractor shall provide draft designs for the Audio Desk and the Lighting Desk described in Section C.3.8.1.A to the COR and Library. Within 10 business days of receiving the draft designs, the Library will provide feedback on the draft designs to the contractor. The contractor shall submit a final design based on the Library’s feedback within 10 business days.
C.3.8.2 Monitor Mix Cart
The Contractor shall provide one (1) portable monitor mix cart which shall house the monitor mix audio console referenced in Section C.3.6. The appropriate brackets necessary to mount the console on the cart must be included.
The cart must include two (2) rack drawers to accommodate the storage of microphones, and an in-ear system.
i. Dimensions. The form factor must be one (1) rack width, and the height must include a minimum of 12 rack unit (12RU) spaces. Unused RU’s must be populated with blank rack panels. The cart must have a top lid, and a removable front cover which can be attached when it is not in use. Additionally, the cart must have a rear access panel, which includes a hole for cable pass-through.
ii. Power. The Contractor shall provide a rack-mounted power distribution unit (PDU) which includes integrated dimmable lighting. The cart must include a rack-mounted uninterruptible power supply (UPS) system to absorb interruptions to power.
C.3.8.3 Custom Lectern
C.3.8.3A – Design Specifications
The Contractor shall provide one (1) custom designed lectern. When in use, the lectern shall position on the Coolidge stage. The lectern shall meet the following specifications:
Must be semi-portable (with locking wheels);
Dimensions of the lectern must be about 28 inches deep, about 19 inches (one rack width), and about 48 inches tall;
Includes integrated rack mounting capability with a minimum of 10 standard rack units;
Has a slide-out shelf for a keyboard & mouse;
Has a flip-up shelf on the right-hand side to support a laptop;
Has a storage compartment on the left-hand side to store accessories such as presentation clickers and adapters;
Includes an integrated hard-wired gooseneck microphone.
Has an integrated LED reading light.
Includes a clock/timer.
Includes a docking station to provide power, data, and audio in/out connectivity with all types of laptops (Windows, MacOS, etc).
Has a touch-screen interface that allows control of microphone volumes;
Has an input/output connection panel near the base that has connections for lectern power, connection to control system, SDI video output (from computer docking station), XLR audio output (from hard-wire microphone), Library of Congress IT network connection (for docking station);
Includes four (4) unique Library logo inserts, which are easily interchangeable via “Z” clip & stored inside the lectern when not in use. The Library will provide designs for the logo inserts;
Stained in a color that compliments the venue; and Includes a step stool that can be stored inside the lectern when not in use.
C.3.8.3B – Draft and Final Lectern Design The Contractor shall provide a draft lectern design to the COR and Library as described in Section C.3.8.3A. Within 10 business days of receiving the draft design, the Library will provide feedback on the draft design to the contractor. The contractor shall submit a final design based on the Library’s feedback within 10 business days.
C.3.9 Headphones The Contractor shall provide three (3) pairs of closed-back large diaphragm foldable headphones.
C.3.10 Government Furnished Equipment Installation
C.3.10.1 Battery Charing Bay The Contractor shall install a microphone battery charging bay which will be mounted in the Monitor Mix Cart referenced in Section C.3.8.2. The battery changing bay will be provided by the Library.
C.3.10.2 Government Furnished Intercom System Integration The Contractor shall install and integrate the Library’s existing Pliant intercom system, into the overall design. The intercom system’s range shall serve the auditorium, backstage and dressing room areas. The intercom system shall have “PROGRAM” audio input connection, and “STAGE ANNOUNCE” audio output feed, both configured from the Front-of- House Audio Mix Position. The Library will provide the following Pliant Intercom system devices:
Pliant “CCU-44 4x4” Control Unit (Quantity: 1) Pliant “CRP-44-900” 900MHz Radio Pack (Quantity: 18) Pliant “PBT-LIP-01” Battery Pack (Quantity 22) Pliant “SB110” Headset (Quantity: 12) Pliant “PBT-RPC-66” Battery Charging Bay (Quantity: 4) Pliant “CHB-8C-02” 8-port Network Copper Hub (Quantity: 4) Pliant “CHB-8F” 8 port Fiber Hub (Quantity: 1) Pliant “CRT-900” 900mMHz Transceiver (Quantity: 4)
The Contractor shall provide ethernet/fiber cables necessary for inter-connection to the intercom system.
C.3.10.3 PTZ Broadcast Camera The Library will provide two (2) SONY IMLE-FR7 cameras, to be mounted the contactor to the front-of-house audio desk, and the lighting desk referenced in Section C.3.8. The Contractor shall provide the required mounting equipment for the cameras. Existing cabling for camera operation can re-used – unless the Contractor determines a need to fabricate/provide replacement cables required for operation.
C.3.10.4 Lighting Console The Library will provide an Expression Ion XE-20, which includes an extended fader wing. This console will be housed at the lighting desk referenced in Section C.3.8. The Contractor shall be responsible for mounting and cabling the console.
C.3.11 Installation & Integration Services The Contractor shall install, configure, and test all devices. Any devices requiring mounting to physical structures, and running/terminating wiring, of the venues shall be conducted by Contractor under the supervision of Library staff. The Contractor shall provide all mounting equipment, audio equipment, communication devices, converters, wiring, and all other items required for proper installation, configuration, and operation. All wires must be clearly labeled and use a naming convention specific to the Library, which will be provided by the COR.
The Contractor shall be responsible for programming the Primary and Redundant Dante network for all audio Dante-enable audio equipment installed.
C.3.12 – Diagrams Upon completion of installation and integration, the Contractor shall provide final “As-built” wiring diagrams in “PDF” & “DWG” formats. The diagrams must also include flame resistant certifications for all applicable deliverables.
C.3.13 - Warranty Upon acceptance of the diagrams referenced in Section C.3.12 by the COR, the contractor shall provide warranty for all equipment and systems under this contract for one (1) year against bugs, defects or any issues impacting the expected system operations.
C.4. CONTRACT PERFORMANCE
C.4.1 Kick-Off Meeting
The Contractor shall participate in a kick-off meeting with the COR and Library staff to discuss contract requirements, Contractor’s plan and project schedule. The meeting may occur onsite at the Library or virtually using a virtual meeting platform (such as Microsoft Teams or Zoom). The Contractor shall coordinate with the COR to schedule the kick-off meeting.
C.4.2 Travel
All travel undertaken under this contract is non-reimbursable.
C.5 PERSONNEL REQUIREMENTS
C.5.1 Special Qualifications The Contractor’s personnel performing onsite installation and commissioning must possess CTS (Certified Technology Specialist) certification. The Contractor’s personnel performing programming of the control system and associated panels must possess Q-SYS certification.
C.5.2 Key Personnel
The following positions are considered Key Personnel
A. Project Manager and Alternate:
The Contractor shall provide a Project Manager and Project Manager Alternate who shall be CTS certified and have a minimum of five (5) years’ experience in managing audiovisual system integration projects. OR, if not CTS certified both must have a minimum of 10 years’ experience in managing audiovisual system integration projects. The Project Manager shall be responsible for the performance of the work. The Project Manager alternate shall act for the Contractor during the Project Manager’s absence. The Project Manager or Alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
030ADV26R0049 Section D
SECTION D - PACKAGING AND MARKING
D.1 LC52.211-1 DELIVERIES (APR 2015)
All deliveries submitted to the CO or the COR or other Library personnel designated to receive deliverables shall clearly indicate the following information:
a. Agency/Requiring Library Service Unit and MAIL STOP/Room Number
b. Description of information/data being submitted
c. Contract Number
d. Contractor Name and Address
(End of Clause)
D.2 LC52.211-2 DELIVERIES TO THE LIBRARY OF CONGRESS, CAPITOL HILL CAMPUS (JUN
2021)
(a) SAFETY. Trucks making deliveries to the Library of Congress must meet the following minimum clearances: 13 ft high, 9 ft wide and 20 ft long. Contractor vehicles exceeding that limitation shall not be permitted access to the Loading Dock area. The Contractor shall ensure that ceiling; doors or walls are not disturbed or damaged. The Contractor shall be held responsible for all costs of repairs to ceiling, doors, etc. and any secondary damage resulting from that damage. The maximum ceiling height inside the loading dock is 14′-8″.
(b) SECURITY. The contractor must adhere to all Library of Congress and U.S. Capitol Police physical security protocols and offsite screening procedures. These requirements may change during the course of the contract and it is the responsibility of the contractor to stay in compliance with current regulations. The most current procedures for accessing only the Madison Loading Dock are as follows:
(c) SCREENING PROCESS FOR ALL VEHICLES COMING TO LIBRARY OF CONGRESS LOADING DOCKS & JEFFERSON EAST
PARKING LOT FREIGHT ELEVATOR
Process includes all trucks, cars and vans coming to the LC Capitol Hill campus. All contractors are now required to notify the Off-Site Delivery Center (OSDC) no later than 24 HOURS PRIOR TO ARRIVAL (48-72 hours if possible)
Contractors are required to have a letter on file with the U.S. Capitol Police. The letter must be on company letterhead accompanied by signature of the owner, president or manager and sent directly to the OSDC email:
OSDCAdmin@USCP.GOV and the COR. The letter shall be protected with a password, and the password shall be sent separately. Requests for access must be renewed every year and should contain the following information:
1. Company Name,
2. Drivers/Employee Names requiring access,
3. Social Security Number for each Driver/Employee,
4. Date of Birth for each Drive Employee,
5. Driver License Number,
6. Vehicle make, model, tag number,
7. Building(s) to be accessed,
8. COR’s name and phone number, 030ADV26R0049 Section D
9. Contract number
All deliveries must include a Bill of Lading and designate a Library Point of Contact (POC) name and telephone number for deliveries. If making more than one delivery on the Hill, make the Library of Congress your last stop. If you do not, you will have to go through the screening process again after leaving the Library.
Vehicles leaving the Library are not resealed.
(d) DELIVERIES BEFORE 3:00 P.M. – OFF-SITE DELIVERY CENTER (OSDC)
The OSDC is open Mon-Fri. 4:30 a.m. to 3:00 p.m. at 4700 Shepherd Parkway S.W. for screening by the U.S. Capitol Police. Once cleared, proceed to D Street and Delaware Avenue S.W. (open Mon-Fri.4:45 am – 3:00 pm) to gain access to Capitol Hill. The OSDC phone number is (202)224-0202.
When a vehicle enters the OSDC:
1. Drivers information is checked.
2. Truck unloaded and material X-rayed and screened.
3. Material is replaced and the vehicle is sealed.
4. Vehicle proceeds to Delaware Avenue, seal is verified, and truck is cleared to first destination.
5. If multiple deliveries on the Hill the vehicle will be resealed upon departure from each delivery location – except the Library of Congress.
6. Vehicle arrives at the Library of Congress. The seal is verified and removed by the police.
(e) DELIVERIE S AFTER 3:00 P.M. Weekdays or Saturday – ALL DELIVERIES / WITH COORDINATION WITH USCP LIBRARY DIVISION (Exception basis for same day delivery only)
Provide all information as above and copy the Library Division at police_support@loc.gov (underscore between police and support) and a fax to (202) 707-1030 and include the estimated arrival time. The inspection location is the 600 block of New Jersey Ave. S.E., and C St NW near the power plant. Call the Library Division at (202) 707-1000 who will arrange for the vehicle to be swept. The vehicle will then be escorted to the Library. All containers have a designated placement location and the Contractor shall not leave any container in any area except those identified in this contract. This expressly designates Independence Avenue, C Street, 1st, 2nd, 3rd Streets and East Capitol Street, SE as areas off limits for staging of containers. All delivery vehicles shall have clearly identified company signage. Driver and all onsite staff shall wear distinguishable company uniform and/or company ID. The Contractor shall not travel beyond the dock area of the Madison Loading Dock. The Contractor shall comply with the Library security procedures. Contractor will be briefed by the COR on Library’s security procedures currently in effect. The security procedures vary periodically.
(End of Clause)
D.3 LC52.231-1 PAYMENT OF POSTAGE FEES (MAY 2015)
All postage and fees related to submission of information, including forms, and reports, etc., to the Contracting Officer or Contracting Officer’s Representative (COR) or other persons designated to receive, shall be paid by the Contractor.
(End of Clause)
030ADV26R0049 Section F
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LC52.215-5 PLACE AND PERIOD OF PERFORMANCE (JAN 2019)
Place of Performance: The contractor’s usual place of business and onsite at the Library of Congress
The overall period of performance shall be as stated in section B.
The contractor is responsible for determining its hours of operation in fulfilling the requirements of this contract. The Library’s standard operating hours are from 8:30 AM through 5:30 PM, Monday through Friday, excluding Federal holidays. The contractor shall coordinate with the COR for any work to be conducted at Library facilities.
(End of Clause)
F.2 SCHEDULE OF EVENTS/DELIVERABLES
The Contractor shall communicate any problems or potential delays to the Contracting Officer’s Representative (COR) as soon as possible. Contractor must deliver the camera kits to the COR at the following address
The Library of Congress – Multimedia Group Attn: To be provided at the time of award 101 Independence Ave, SE Office: To be provided at the time of award Mail Stop: 1220 Washington DC 20540-9360
Paragraph reference
Deliverable Due Date Payment Amount
C.4.1 Kick-Off meeting No later than 9/30/2026
Not Separately Priced (NSP)
C.3.1A Site Survey No later than 11/15/2026
NSP
C.3.1B System Design NLT 02/05/2027
C.3.2 Infrastructure Removal Services
NLT 09/29/2027
C.3.3 –C.3.11 Hardware & Installation/Commissioning
NLT 09/29/2027
C.3.8 Technical Furniture Final Design
NLT 3/05/2027
C.3.8 Technical Furniture Fabrication, Delivery and Installation
NLT 4/31/2027
030ADV26R0049 Section F
C.3.12 Diagrams NLT 09/28/2027
C.3.13 1 Year Warranty 09/28/2027 – 09/27/2028
030ADV26R0049 Section G
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 LC52.201-3 CONTRACT ADMINISTRATION (AUG 2015)
This contract will be administered by:
Library Contracting Officer: Mojisola Adejuwon Address: Contracts & Grants Directorate, The Library of Congress 101 Independence Ave. SE Washington, D.C. 20540 Phone: (202) 707-0400 Email: moad@loc.gov
Library Contract Specialist: Olexiy Levchuk Address: Contracts & Grants Directorate, The Library of Congress 101 Independence Ave. SE Washington, D.C. 20540 Phone: (202) 707-1462 Email: olevchuk@loc.gov
Library Contracting Officer Representative: To be provided at the time of award Address: To be provided at the time of award Phone: To be provided at the time of award Email: To be provided at the time of award.
Contractor Contract Administrator: To be provided at the time of award Address: To be provided at the time of award Phone: To be provided at the time of award Email: To be provided at the time of award
G.2 LC52.204-5 IDENTIFICATION AND BUILDING PASSES (SEP 2024)
(a) The Contractor shall ensure that all contractor employees, both directly employed and subcontracted, contractors and sub-contractors, who will need regular, unescorted access to Library facilities obtain Library-issued photo identification badges. The Library will issue the ID badges without charge. The Contractor shall schedule with the COR time for contractor staff to be available to receive Library ID badges prior to starting work. The Contractor shall accurately maintain a list of contractor employee badge numbers and provide updates to the COR upon request.
(b) The Contractor shall provide instruction and ensure that each contractor employee performing work under this contract visibly displays their Library ID badge at all times they are present on-duty on Library premises. Refusal or repeated neglect to display the Library ID badge may result in removal from non-public Library premises and removal from the contract.
(c) Upon termination, resignation, contract completion, or other event leading to a contractor employee not requiring continued access to Library facilities under this contract, the Contractor is responsible for returning all Government identification, building passes, keys, and other Government property issued to that contractor employee within 5
030ADV26R0049 Section G business days from the termination of that contractor employee’s access. Failure on the part of the Contractor to return these materials may result in the Contractor’s liability for all costs associated with addressing the resultant security breach.
(End of Clause)
G.3 LC52.232-1 LIBRARY OF CONGRESS INVOICE INSTRUCTIONS (DEC 2022)
The Contractor must prepare and submit invoices electronically to: https://www.ipp.gov. The Contractor may submit payment requests using other than electronic means only when alternate procedures are authorized by the contracting officer in writing. Assistance is available via the IPP Help Desk via email at: ippcustomersupport@fiscal.treasury.gov or by commercial telephone at (866) 973-3131. Invoices shall contain the information required in FAR 52.212-4, paragraph (g).
(End of Clause)
G.4 LC52.232-2 SCHEDULE OF PAYMENTS (JUN 2015)
The contractor must submit invoices for payment upon delivery of the items or successful performance of the events identified in the Deliverables Schedule in Section F pursuant to the standards and acceptance criteria defined in this contract.
030ADV26R0049 Section H
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 LC52.201-1 CONTRACTING OFFICER'S REPRESENTATIVE (COR) APPOINTMENT AND
AUTHORITY (JAN 2016)
(a) Performance of work under this contract is subject to the technical direction of the COR. The term “technical direction” includes, without limitation, direction to the contractor that directs or redirects the labor effort, shifts the work between work areas or locations, and/or fills in details and otherwise serves to ensure that tasks outlined in the contract are accomplished satisfactorily.
(b) Technical direction must be within the scope of the contract specification(s)/work statement. The COR does not have authority to issue technical direction that:
(1) Constitutes additional work outside the contract specification(s)/work statement;
(2) Constitutes a change as defined in the “Changes” clause of this contract;
(3) Causes an increase or decrease in the contract price, or the time required for contract performance;
(4) Changes any of the terms, conditions, or specification(s)/work statement of the contract;
(5) Interferes with the contractor's right to perform under the terms and conditions of the contract; or
(6) Directs, supervises or otherwise controls the actions of the contractor's employees.
(c) Technical direction may be oral or in writing. The COR must confirm oral direction in writing within five workdays, with a copy to the Contracting Officer.
(d) The Contractor shall proceed promptly with performance resulting from the technical direction issued by the COR.
If, in the opinion of the contractor, any direction of the COR or the designated representative falls within the limitations of (b) above, the contractor shall immediately notify the Contracting Officer no later than the beginning of the next Government work day.
(e) Failure of the Contractor and the Contracting Officer to agree that technical direction is within the scope of the contract shall be subject to the terms of the “Disputes” clause of this contract.
(End of Clause)
H.2 LC52.203-1 CONTRACTOR PUBLICITY (OCT 2013)
The Contractor, or any entity or representative acting on behalf of the Contractor, may not refer to the equipment or services furnished pursuant to the provisions of this contract in any news release or commercial advertising, or in connection with any news release or commercial advertising, without first obtaining explicit written consent to do so from the Contracting Officer. Should any reference to such equipment or services appear in any news release or commercial advertising issued by or on behalf of the Contractor without the required consent, the Government will consider institution of all remedies available under applicable law.
H.3 LC52.204-1 COLLECTIONS SECURITY (DEC 2013)
(1) The Library is a public institution responsible for making its resources (collections and staff) available to the Congress and the American people. To achieve a balance between access and security, the Library requires everyone (staff, visitors, interns, contractors, etc.), to always use due diligence and protect its assets during use.
(2) Physical access to Library collections is limited to staff and/or determined by the host office. In addition, established requesting processes in the various readings rooms must be followed.
(3) Loan Privileges. Contractor employees may obtain loans of Library property for internal use and Library work-related purposes.
i. Loan of Library Property. All loans of Library property must be approved and documented by the host Library Services office. Contractor staff shall obtain a Library “General Pass” (Form LW 12/54 (rev2/88)) for each loan.
ii. Liability – Loss or Damage of Library Property. Use or loan of all Library property and signature on this contract means that the contractor acknowledges and agrees to:
(a) ensure the return all Library property issued in the same condition as borrowed;
(b) accept responsibility and liability for the negligent loss or damage of issued or borrowed Library property; and
(c) ensure that the loaned property is used for Library purposes and not loaned to any other person.
(End of Clause)
H.4 LC52.204-2 CONDUCT ON LIBRARY PREMISES (JUL 2021)
1. Access to Library buildings and grounds is governed by 36 C.F.R. part 702 - Conduct on Library Premises. Contractor staff must comply with these requirements and restrictions and related Library of Congress Regulations and Directives.
2. The Library is committed to preventing and addressing all forms of discriminatory harassment and to ensuring that Equal Employment Opportunity (EEO) principles are fundamental to Library culture. Everyone — employees, interns, volunteers, contractors, researchers, and visitors — is expected to help make the Library a respectful environment free from offensive behavior.
a. Library of Congress employees, contractors, interns, volunteers, researchers, patrons, and other visitors have a right to Library facilities that are free from discrimination based on their race, color, national origin, religion, sex, sexual orientation, gender identity, age (40 and over), disability, genetic information, union affiliation, political affiliation, or marital status.
b. The Library does not tolerate discrimination – including sexual harassment, other forms of harassment, or a hostile work environment – based on these factors. The Library does not tolerate retaliation against anyone who engages in any form of protected EEO activity.
c. Contractor (including subcontractor) staff alleged to have engaged in discrimination or retaliation in the performance of this contract may be prohibited from entering Library facilities to perform work under their contracts.
Contractors are required to promptly respond to all Library inquiries into allegations of discrimination, and must, in good faith, cooperate with Library investigations. Good faith cooperation includes, but is not limited to, making contractor staff available for:
1. Formal and informal interviews by Library agents investigating allegations of discrimination;
2. Reviewing and signing appropriate affidavits or declarations summarizing statements provided by such contractor staff during the course of an investigation;
3. Producing documents requested by the Library agents conducting the investigation; and
4. Preparing for and providing testimony in depositions or in administrative hearings.
(End of Clause)
H.5 LC52.204-3 INFORMATION SYSTEMS SECURITY (JUL 2024)
(1) Computer Security Policy. The Library requires anyone using or accessing its digital assets (including networks, servers, workstations, systems, data, web pages, and email) to protect them and use them only for official business, and only in accordance with Library regulations and applicable Library bargaining agreements. Unauthorized or inappropriate use may be grounds for termination or other contractual remedy.
(2) Privacy Policy. No one has the right to privacy while using any Library computer system, including internet or email services. Usage may be monitored.
(3) Level of Access. The Library’s Host Office will determine the level of access to the Library’s IT equipment, staff and software needed to successfully perform…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .