02-Performance Work Statement_18 Mar 26.docx
DOCX document 65 KB Posted
- Attached to
- Rags Cleaning Services
- Solicitation number
- W50S6W-26-Q-A001
- Issued by
-
Department of the Army National Guard
About this file
This is a Performance Work Statement (PWS) for shop towel leasing and laundering services for the 113th Wing, District of Columbia Air National Guard (DCANG) at Joint Base Andrews. The contractor must provide all personnel, equipment, materials, supervision, and quality control necessary to deliver reliable, compliant, and cost-effective shop towel services. The requirement includes a one-year base period with four optional one-year renewals, with services performed Tuesday through Friday, 7:00 a.m. to 4:30 p.m. (or 5:00 p.m. for deliveries), excluding federal holidays and facility closures.
The contractor shall furnish 2,000 cotton or cotton-blend shop rags (minimum 12"x12") and 15 to 25 protective overalls (two-piece dark blue uniforms) with bi-weekly pickup and delivery to four buildings on the installation. Initial delivery of new rags and overalls must occur within 30 days of contract award, distributed as follows: 800 white rags to Building 1228, 800 white rags to Building 3119, 200 red rags to Building 3217, and 200 red rags plus 15-25 overalls to Building 3227. The contractor must provide NFPA 30-compliant fireproof containers for storing soiled and clean rags separately and conduct joint inventory verification at each pickup/delivery. Laundered items must be entirely clean, thoroughly dry, lint-free, odor-free, and wrinkle-free, meeting an acceptable quality level of 98 percent for cleanliness and 100 percent for container compliance and delivery schedules. Annual estimated workload includes 52,000 rags, 104 containers, and 1,820 overalls. The contractor must comply with all military installation security requirements, including antiterrorism training, OPSEC training, identification procedures, and background check standards. All contractor employees require base identification and vehicle passes, and the contractor must designate a Contract Manager with full authority over daily operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers_21 Apr 26_updated 22 Apr 26.docx | DOCX document | |
| Additional Questions and Answers_22 Apr 26.docx | DOCX document | |
| Questions and Answers_21 Apr 26.docx | DOCX document | |
| 03-Pricelist_15Apr26.xlsx | XLSX spreadsheet | |
| 04-Quality Assurance Surveillance Plan_18 Mar 26.docx | DOCX document | |
| Combined Synopsis-Solicitation_Rag Cleaning Services_9 Apr 26.docx | DOCX document | |
| 01-Provisions and Clauses.pdf | ||
| 05-Wage Determination.pdf | ||
| 03-Pricelist.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
113th Wing Rags and Overalls Laundering Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Rag Services for the 113th Wing, as defined in this PWS.
1.1.1 Objectives The objective of this requirement is to provide the 113th Wing DCANG with a reliable, compliant, and cost‑effective shop towel leasing and laundering service. The contractor shall ensure continuous availability of clean shop towels, maintain compliance with all applicable regulations, and deliver timely and predictable pickup/delivery services.
1.2 Background: The 113th Wing, District of Columbia Air National Guard (DCANG), conducts mission‑critical operations requiring frequent handling of hazardous materials and waste. Shop towels are used to minimize exposure and maintain a safe environment. To ensure compliance with OSHA, EPA, and Air Force environmental standards, the Wing requires a contractor to provide leased shop towels, laundering services, and consistent pickup and delivery support across multiple DCANG facilities at Joint Base Andrews.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and four 12-month Option Years.
1.4 General Information:
1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0700-1700 on Tuesday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Buildings 1228, 3119, 3217, 3227 located on Joint Base Andrews. The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that stability and continuity of the work force are essential.
1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement.
1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday
1.4.2.3 President’s Day
1.4.2.4 Memorial Day
1.4.2.5 Juneteenth National Independence Day: June 19th
1.4.2.6 Independence Day: July 4th
1.4.2.7 Labor Day
1.4.2.8 Columbus Day
1.4.2.9 Veteran’s Day: November 11th
1.4.2.10 Thanksgiving Day
1.4.2.11 Christmas Day: December 25th
1.4.3 Reserved.
1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
2. The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver s license, current vehicle registration, valid vehicle insurance certificate, and [insert any additional requirements to comply with local security procedures] to obtain a vehicle pass.
3. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
4.Reserved
5. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
6. Failure to comply with these requirements may result in withholding of final payment.
1.4.5.1. Reserved
1.4.5.2. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Air Force Instruction (AFI) 10-245, AFI 31-101 and Air Force Manual (AFMAN) 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative)
1.4.5.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.
1.4.5.4 Reserved.
1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.6 Reserved
1.4.5.7 Reserved
1.4.5.8 Reserved
1.4.5.9 Reserved
1.4.5.10 Reserved
1.4.5.11 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.
1.4.5.12 Reserved
1.4.5.13 Reserved
1.4.5.14 Reserved
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Reserved
1.4.6.2 Reserved
1.4.7 Reserved
1.4.8 Reserved
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR , to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.10.1 The contractor shall retrieve all identification media (including vehicle passes) from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and vehicles passes) to the KO within 14 days of an employee’s departure.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Reserved
1.4.13 Reserved
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Reserved
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.2 Acronyms:
| AEI | Army Enterprise Infostructure | |
| AR | Army Regulation | |
| AT/OPSEC | Antiterrorism/Operational Security | |
| BI | Background Investigation | |
| CM | Contract Manager | |
| COR | Contracting Officer Representative | |
| DA | Department of the Army | |
| DD254 | Department of Defense Contract Security Classification Specification | |
| DFARS | Defense Federal Acquisition Regulation Supplement | |
| DoD | Department of Defense | |
| DSCA | Defense Counterintelligence and Security Agency | |
| FAR | Federal Acquisition Regulation | |
| GFP/M/E/S | Government Furnished Property/Material/Equipment/Services | |
| HQDA | Headquarters, Department of the Army | |
| HSPD | Homeland Security Presidential Directive | |
| IA | Information Assurance | |
| IS | Information System(s) | |
| KO | Contracting Officer | |
| NGB | National Guard Bureau | |
| OCI | Organizational Conflict of Interest | |
| PII | Personally Identifiable Information | |
| PIPO | Phase In/Phase Out | |
| POC | Point of Contact | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QC | Quality Control | |
| QCP | Quality Control Program | |
| SCR | Service Contract Reporting | |
| SSN | Social Security Number | |
| TE | Technical Exhibit | |
| USD(I) | Under Secretary of Defense for Intelligence |
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
3.1 Property: None
3.2 Materials: None
3.3 Equipment: None
3.4 Services: None
3.5 Utilities: None
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): The contractor will provide the 113th Wing with leased rags, protective overalls, and hazardous storage bins.
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.2 Reserved
4.3 Reserved
5.0 Requirements: The contractor shall:
5.1 SUPPLIES
5.1.1 Shop rags shall be made of absorbent cotton or cotton blend material, designed for use in cleaning grease and oil. Shop towels shall be a minimum of 12 inches wide and 12 inches long.
5.1.2 Five sets of overalls for 3 to 5 members every two weeks. Overalls shall be a two-piece (full length pants/short sleeve button shirt) uniform in Dark Blue. Tops – Short sleeve with non-marring buttons, two name patches, one with the Squadron Name (113 Logistics Readiness Squadron) on the left and one with the members name on the right. Material would be a cotton/poly blend. Top sizes will be determined. Pant sizes will be determined. Check with the COR for top and pant sizes.
5.1.3 The contractor shall provide freestanding containers with lids for soiled rags as well as a separate container for clean rags to ensure the soiled and clean rags are stored separately. These containers are different than those used by the contractor to transport the clean and soiled rags. These bins shall be fireproof to prevent spontaneous combustion, as per National Fire Protection Agency (NFPA) 30 – Flammable Combustible Code.
5.1.4 Pick-up/delivery shall be once every two weeks. Deliveries shall commence within 30 days of contract award. Delivery receipts must be provided to the customer upon all deliveries/pickups.
5.2 LAUNDERING SERVICES. Laundered shop rags and overalls shall be accomplished by commercially acceptable practices utilized by mass commercial production laundry facilities in accordance with industry standards.
5.2.1 Each processed item shall be entirely clean, thoroughly dry and free of lint; colors shall be bright and clean. Minor discoloration as a result of fading and staining is acceptable.
5.2.2 At the completion of the laundering process, shop rags and overalls shall be free of objectionable odor and no trace/residue of foreign materials.
5.2.3 Rags and overalls shall be machine finished so that all surfaces are smooth and free of wrinkles.
5.2.4 Rags and overalls shall retain their original shape and form.
5.3 LAUNDERING SERVICES/PICKUP & DELIVERY. Pick-up/delivery shall be once every two weeks, on the same day each week. In the event a holiday falls on the established pick-up/delivery day, the contractor shall perform the service on the working day prior to the holiday, i.e. if the service is scheduled on Friday, the contractor shall provide service on Thursday; service scheduled on a Tuesday shall be performed the previous Friday. The contractor shall confirm availability with the delivery location prior to any federal holiday. Normal work hours are Tuesday through Friday, 7:00 a.m., through 4:30 p.m.
5.3.1 The Contractor shall provide an initial delivery of 2,000 new shop rags and between 15 to 25 overalls within 30-days after contract award;
· 800 white rags to Building 1228,
· 800 white rags to Building 3119,
· 200 red rags to Building 3217,
· 200 red rags and between 15 - 25 overalls to Building 3227.
Thereafter 2,000 clean laundered and packaged shop rags and between 15 to 25 overalls will be delivered, and 2,000 used shop rags and 15 to 25 overalls will be picked up every two weeks.
5.3.2 The contractor and the Government Representative (QAE or COR) shall conduct a joint inventory of items being picked-up and/or delivered each week.
5.3.3 A check off sheet provided by the contractor shall be utilized. A copy shall remain with the Government, and the original shall be submitted each month with the contractors invoice. Discrepancies shall be resolved immediately.
5.3.4 Shortages shall be “replaced during the next delivery date.” Failure to make replacement within this time shall result in a cost deduction from the applicable delivery order.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
| Date of Publication |
| Mandatory or Advisory |
| Website |
Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar
Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars
Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf
| DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP) |
| 04/03/2017 |
https://www.esd.whs.mil/Directives/issuances/dodm/
DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/
DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/
DoD 8570.01-M Information Assurance Workforce Improvement Program 12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/
AFI 10-245
Antiterrorism 03/28/2013 (Certified current 03/30/2017) https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131
AFI 31-101
Security Forces Standards and Procedures 08/18/2020 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131
AFMAN 31-113
Security Forces Standards and Procedures 03/05/2013 Change 1:
12/02/2015 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131
AFPD 17-1
Information Dominance Governance and Management 04/12/2016 https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131
AFI 10-701
Operations Security 7/24/2019 (Change 1:
06/09/2020) https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
| Form |
| Date |
| Website |
DD 1172-2
Application for Identification Card/DEERS Enrollment
| Mar 2017 |
| http://www.dtic.mil/whs/directives/forms/index.htm |
I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf
DD 441
Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm
DD 250
Material Inspection and Receiving Report
| Aug 2000 |
| https://www.esd.whs.mil/Directives/forms/dd0001_0499/ |
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
5.1.1 Shop towel materials meet minimum absorbency and size
| 12x12 cotton/cotton blend rags provided |
| Meets the standard 98% of the time |
| Random Monitoring / COR |
5.1.3 Provide fireproof containers for clean/soiled rags
| NFPA‑30 compliant containers maintained |
| Meets the standard 100% of the time |
| 100% Inspection / COR |
5.2.1-5.2.4 Laundered rags and overalls meet cleanliness standards
| Clean, dry, lint‑free, odor‑free, wrinkle‑free |
| Meets the standard 98% of the time |
| Random Monitoring / COR |
5.3 Pickup/delivery every two weeks
| On schedule, holidays adjusted correctly |
| No more than two (2) deficiencies per 52-week period |
| Periodic Inspection / COR |
5.3.1 Initial 2,000 rags and 35 overalls delivery
| Delivered within 30 days of award |
| Meets the standard 100% of the time |
| 100% Inspection / COR |
5.3.3 Monthly check‑off sheet submission
| Included monthly with invoice |
| Meets the standard 100% of the time |
| 100% Inspection / COR |
TECHNICAL EXHIBIT 2
Deliverables Schedule
| PWS Reference / Deliverable Title |
| Frequency |
| Number of Copies |
| Medium/Format |
| Submit To |
| 1.4.5.3 AT Level 1 Awareness Training Certificates |
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
1.4.5.11 OPSEC
Training Certificates
| Provide within 15 calendar days after employee completes training. |
| 1 |
| Electronic Submission |
| COR |
| 5.3.2 Joint Inventory Sign‑off Sheet |
| Every Pickup/Delivery |
| 1 |
| Electronic/Hard Copy |
| COR |
| 5.3.3 Monthly Check‑off Sheet |
| Monthly |
| 1 |
| Electronic/Hard Copy |
| COR |
| 5.1.4 Delivery Receipts |
| Every 2 Weeks |
| Original(s) |
| Electronic/Hard Copy |
| COR |
5.1.3 Provide fireproof containers for clean/soiled rags
| Every Pickup/Delivery |
| 4 |
| N/A |
| COR |
5.3.1 12”x12” 2,000 Rags and between 15 - 25 overalls
| Every Pickup/Delivery |
| 800 white rags to Building 1228, 800 white rags to Building 3119, 200 red rags to Building 3217, and 200 red rags and between 15 –25 overalls to Building 3227. |
| N/A |
| COR |
TECHNICAL EXHIBIT 3
Estimated Workload Data
This information is provided for historical background only. It is not guarantee of workload quantities.
| ITEM |
| NAME |
| ANNUAL ESTIMATED QUANTITY |
| 1 |
| 12”x12” Rags |
| 52,000 (2026) |
52,000 (2027) 52,000 (2028) 52,000 (2029) 52,000 (2030)
| 2 |
| Fireproof Containers |
| 104 (2026) |
104 (2027) 104 (2028) 104 (2029) 104 (2030)
| 3 |
| Protective Overalls |
| 1,820 (2026) |
1,820 (2027) 1,820 (2028) 1,820 (2029) 1,820 (2030)
Ver. October 2022
File details come from the government source that posted it. Updated .