About this file

Large Potable Water Valve Replacement Project – Willow Street

This is a specification and bidding document for the Board of Public Utilities Commissioners of the City of Long Beach, California, for the Large Potable Water Valve Replacement Project on Willow Street (EO-3598, WD-52-22). The project involves furnishing all labor, equipment, and materials necessary to replace six existing 20-inch gate valves with Long Beach Utilities Department-provided 20-inch butterfly valves across three locations: Willow Street and Delta Avenue (Stage 1, three valves), Willow Street and Santa Fe Avenue (Stage 2, one valve), and Spring Street and Delta Avenue (Stage 3, two valves). Work includes traffic control, potholing operations, utility protection, excavation, linestop assembly construction, valve removal and installation, hydrostatic testing, disinfection, backfill, and pavement restoration. A mandatory pre-bid conference was scheduled for June 14, 2023, and bid submission closed at 4:00 PM on July 6, 2023, via the City's online procurement portal (https://longbeachbuys.buyspeed.com/bso/). The contract duration is one hundred sixty (160) calendar days from the Notice to Proceed.

Bidders must possess a valid California Class "A" General Engineering Contractor license and DIR registration. Bid security of no less than 10 percent of the total bid amount is required, with performance and labor/material bonds each equal to 100 percent of the contract price required upon award. The project is subject to prevailing wage requirements under California Labor Code Section 1720 et seq., with the 2023-2 prevailing wage rate applicable. Bids are evaluated on responsiveness and contractor responsibility, with award going to the lowest responsible bidder. The Owner reserves the right to reject any or all bids. Retainage withholding can be avoided if the contractor deposits securities of equivalent or greater value with the Owner per Public Contract Code Section 22300. The project location is in Long Beach, California, just west of the I-710 Freeway near the Willow Street exit, and represents public works subject to Department of Industrial Relations compliance monitoring.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Long Beach Utilities Department

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

WILLOW STREET

Contract Documents and Specifications WD-52-22

May, 2023

DRAWING NO. EO-3598

Board of Public Utilities Commissioners Long Beach, California

PLANS AND SPECIFICATIONS

WD-52-22

LONG BEACH UTILITIES DEPARTMENT

LARGE POTABLE WATER VALVE

REPLACEMENT PROJECT

CONTRACT DOCUMENTS

BIDDING REQUIREMENTS, CONTRACT FORMS,

CONDITIONS OF THE CONTRACT, AND

TECHNICAL SPECIFICATIONS

Prepared by:

Ardurra 43410 Business Park Drive Temecula, California 92590

Board of Public Utilities Commissioners Long Beach, California

This information is available in an alternative format By request to Ryan Hiney at (562) 570-2182

SPECIFICATIONS

WD-52-22

Approved this day of , 20_

Robert J. Verceles

Director of Engineering / Chief Engineer

Authorized this day of , 20_

Christopher J. Garner General Manager

Approved as to Form this t"7 day of , 20_^ Dawn Mclntosh

City Attorn^

Richafd-Aftthony^ Principal Deputy City Attorney

18th May 23

18th May 23

THIS PAGE INTENTIONALLY LEFT BLANK

Board of Public Utilities Commissioners Table of Contents of the City of Long Beach Page i

CONTRACT DOCUMENTS

TABLE OF CONTENTS

WD-52-22

Page

PART 1-BIDDING REQUIREMENTS

Notice Inviting Bids .............................................................................................................. 1-6 Instructions to Bidders ......................................................................................................... 1-6 Bid ................................................................................................................... 1-12 Bidder’s Bond .................................................................................................................... 1-1

PART 2- CONTRACT FORMS

Bond for Faithful Performance ............................................................................................. 1-1 Labor and Material Bond ..................................................................................................... 1-1 City Policy for Minority- and Women-Owned Businesses ................................................... 1-3 Information to Comply with Labor Code Section 2810 ........................................................ 1-1 Workers’ Compensation Certificate ..................................................................................... 1-1

PART 3- CONDITIONS OF THE CONTRACT

General Conditions ............................................................................................................ 1-71 Supplementary General Conditions ..................................................................................... 1-3 Supplementary General Conditions (Other) ........................................................................ 1-4

PART 4- TECHNICAL SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

01 10 01 Summary of Work and Sequence of Construction ........................... 01 10 01-6 01 10 03 Coordination ..................................................................................... 01 10 03-8 01 22 00 Unit Prices ........................................................................................ 01 22 00-8 01 29 73 Schedule of Values .......................................................................... 01 29 73-4 01 31 19 Project Meetings .............................................................................. 01 31 19-4 01 32 00 Construction Progress Documentation ............................................ 01 32 00-8 01 32 33 Construction Photographic and Video Documentation .................... 01 32 33-4 01 33 00 Submittal Procedures ..................................................................... 01 33 00-12 01 35 26 Governmental Safety Requirements ................................................ 01 35 26-8 01 35 44 Environmental Procedures for Hazardous Materials ....................... 01 35 44-4 01 40 00 Quality Requirements .................................................................... 01 40 00-10 01 41 26 Permits ............................................................................................. 01 41 26-4 01 50 00 Construction Facilities and Temporary Controls .............................. 01 50 00-6 01 55 26 Traffic Controls and Temporary Restriping ...................................... 01 55 26-8 01 57 23 Temporary Storm Water Pollution Control ....................................... 01 57 23-4 01 64 00 Installing Owner-Furnished Products ............................................... 01 64 00-4 01 66 00 Product Shipment, Storage, and Handling Requirements ............... 01 66 00-2 01 71 13 Mobilization and Demobilization ...................................................... 01 71 13-2 01 73 33 Mechanical Identification .................................................................. 01 73 33-4 01 74 00 Cleaning and Waste Management ................................................... 01 74 00-4 01 77 00 Closeout Procedures ....................................................................... 01 77 00-2 of the City of Long Beach Page ii

01 78 39 Record Drawings ............................................................................. 01 78 39-4

DIVISION 2 – SITE WORK

02 41 13 Selective Site Demolition ................................................................. 02 41 13-4 02 41 14 Paving Removal and Resurfacing .................................................... 02 41 14-8 02 41 15 Utility Pipeline Removal or Abandonment ........................................ 02 41 15-4

DIVISION 3 - CONCRETE

03 30 00 Case-In-Place Concrete Conforming to Greenbook Specifications 03 30 00-16

DIVISION 9 – FINISHES

09 90 00 Painting and Coatings .................................................................... 09 90 00-16 09 96 56 Epoxy Linings and Coatings ............................................................ 09 96 56-8

DIVISION 31 – EARTHWORK

31 05 16 Aggregate Rock Products for Earthwork .......................................... 31 05 16-4 31 05 50 Protecting Existing Utilities ............................................................... 31 05 50-5 31 23 19 Dewatering ....................................................................................... 31 23 33-2 31 23 33 Trenching and Backfilling ................................................................. 31 23 33-8

DIVISION 33 – UTILITIES

33 01 19 Connecting to Existing Pressure Pipelines ...................................... 33 01 19-4 33 05 26 Utility Identification ........................................................................... 33 05 26-4 33 05 31 Piping Joint Materials ....................................................................... 33 05 31-6 33 05 32 Flange Insulating Kits and Threaded Insulating Bushings ............... 33 05 32-4 33 05 33 Couplings, Tie Rods, Flange Connectors and Unions ..................... 33 05 33-6 33 05 39 Manual Valve Operators .................................................................. 33 05 39-6 33 08 11 Hydrostatic Pressure Testing and Flushing of Water Utilities .......... 33 08 11-4 33 11 11 Ductile Iron Pipe and Fittings ........................................................... 33 11 11-6 33 11 19 Coating, Mastic and Tape-Wrap Systems for Metal Pipe ................ 33 11 19-2 33 11 20 Polyethylene Encasement of Iron Pipe, Fittings, Couplings&Valves 33 11 20-4 33 12 10 Line-Stops, Insertion Valves and Pipe Freezing .............................. 33 12 10-4 33 12 12 Resilient Wedge Gate Valves .......................................................... 33 12 12-6 33 12 14 Butterfly Valves (Installation Only) ................................................... 33 12 14-4 33 12 21 Blow-Off Assemblies and Plugs ....................................................... 33 12 21-4 33 13 00 Disinfecting of Water Utility Pipelines .............................................. 33 13 00-6

PART 5 – DRAWINGS—BOUND SEPARATELY

of the City of Long Beach Page iii

PART 6 – LBUD STANDARD DRAWINGS

LBUD WDS-108 Chlorination and Construction Tap Assembly LBUD WDS-111 Temporary Chlorination and Air Relief Assembly LBUD WDS-115 Adjustable Gate Box – 8-inch LBUD WDS-116 Gate Box Lid – 8-inch LBUD WDS-117 Adjustable Gate Box – 12-inch LBUD WDS-118 Gate Box Lid – 12-inch LBUD WDS-119 Gate Box Details (Sheet 1 of 2) LBUD WDS-119 Gate Box Details (Sheet 2 of 2) LBUD WDS-127 Valve Abandonment LBUD WDS-128 Temporary Steel Plate Bridging LBUD WDS-129 Blanket Protection for Pipes LBUD WDS-406 Trench Restoration – Water and Sewer (Sheet 1 of 2) LBUD WDS-406 Trench Restoration – Water and Sewer (Sheet 2 of 2) LBUD WDS-408 Construction Information Sign (Sheet 1 of 2) LBUD WDS-408 Construction Information Sign (Sheet 2 of 2)

PART 7 – VALVE PRE-PURCHASE PACKAGE

PART 8 – FINAL POTHOLE REPORT

PART 9 – BID PROTEST PROCEDURES

PART 10 – CALTRANS ENCROACHMENT PERMIT

PART 11 – TRAFFIC CONTROL PLAN

PART 1

BIDDING

REQUIREMENTS

Board of Public Utilities Commissioners Notice Inviting Bids Of the City of Long Beach Page 1 of 6

NOTICE INVITING BIDS

WD-52-22

LONG BEACH UTILITIES

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

WILLOW STREET

(EO-3598)

RECEIPT OF BIDS: Bids will be accepted on behalf of the Board of Public Utilities Commissioners of the City of Long Beach, California, Owner of the Work, until 4:00 PM July 6, 2023 for the Large Potable Water Valve Replacement Project – Willow Street, via the City’s online procurement portal https://longbeachbuys.buyspeed.com/bso/, using keyword WD-52-22.

Originals of the Bidder’s Bond and other notarized documents shall be placed in a sealed envelope, addressed and delivered to:

The Board of Utilities Commissioners of the City of Long Beach, California Attn: Engineering Office Administrator Brennan S. Thomas Administration Building Lobby 1800 East Wardlow Road Long Beach, California 90807

When administration building is closed:

Attn: Ryan Hiney 1841 E 33rd Street Long Beach, California 90807

Original documents must be delivered no later than 4:00 PM on July 6, 2023 with the envelope marked “WD-52-22, Large Potable Water Valve Replacement Project Willow Street (EO-3598), DO NOT OPEN WITH REGULAR MAIL.”

DESCRIPTION OF WORK: The Work consists of furnishing all labor, equipment and materials necessary to complete the following work:

1. Maintain operation of the Long Beach Water System throughout construction minimizing shutdowns.

2. Furnish and maintain traffic control devices throughout potholing and construction.

3. Perform potholing operations to verify location of existing underground utilities and to measure outside diameter of existing large diameter pipelines.

4. Protect in place and support existing utilities.

5. Excavate to expose existing large valves and a pertinent piping including line stop locations.

6. Verify the line laying length of the LB Utilities provided butterfly valves

7. Cut interfering segments of existing underground utilities

Of the City of Long Beach Page 2 of 6

8. Construct linestop assemblies, anchor blocks, and temporary and permanent restraint systems.

9. Stage 1 (Willow Street and Delta Avenue): Remove existing 20-inch gate valves at Locations 1A, 1B, and 1C and replace with LB Utilities provided 20-inch butterfly valves including appurtenant piping, accessories, and assemblies.

10. Stage 2 (Willow Street and Santa Fe Avenue): Remove existing 20-inch gate valve at Location 2 and replace with LB Utilities provided 20-inch butterfly valve including appurtenant piping, accessories, and assemblies.

11. Stage 3 (Spring Street and Delta Avenue): Remove existing 20-inch gate valves at Locations 3A and 3B and replace with LB Utilities provided 20-inch butterfly valves including appurtenant piping, accessories, and assemblies.

12. Leakage test and disinfection of all improvements.

13. Backfill and recompact all excavations.

14. Restore pavement to preconstruction conditions.

WORK SITE: The Work Sites are located in the City of Long Beach, California. And are generally located just west of the Long Beach Freeway (I-710) of the Willow Street exit:

Location 1: Located at the intersection of Willow Street and Delta Avenue, west of the W. Willow Street exit off the Long Beach Freeway (I-710).

Location 2: Located at the intersection of Willow Street and Stanta Fe Avenue, further west of the Willow Street exit off the Long Beach Freeway (I-710).

Location 3: Located at the intersection of W Spring Street and Delta Avenue, north of the Willow Street exit off the Long Beach Freeway (I-710).

PRE-BID CONFERENCE: Prospective bidders are required to attend a pre-bid conference with the Owner and Owner’s representatives.

• Pre-bid conference will be an online meeting presentation of technical parameters at 10:00 AM on Wednesday, June 14, 2023 to present the scope of work to be performed under these specifications.

Request the pre-bid conference information for the online meeting and site visit by sending an e-mail to Ryan Hiney at Ryan.Hiney@lbwater.org and include the subject line “Large Potable Water Valve Replacement Project – Willow Street: RSVP to Pre- Bid Conference”.

COMPLETION OF WORK: The Work must be completed within one hundred and sixty (160) calendar days after the commencement date stated in the Notice to Proceed.

Of the City of Long Beach Page 3 of 6

OPENING OF BIDS: All Bids received in a timely manner will be subject to further evaluation with respect to:

• The responsiveness of the Bid

• Determination that Bidder is responsible

CONTRACT DOCUMENTS: Plans and specifications are available for free download through Long Beach Buys at https://longbeachbuys.buyspeed.com/bso/. However, you must be registered and logged in to submit a bid. Registration is free and may be accomplished at the same URL.

BID SECURITY: Bidders must scan and upload with their bid documents a certified check or bank draft payable to the Long Beach Utilities Department, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid. The original of the above instrument shall be submitted to the Long Beach Utilities Department in a sealed envelope and must be received and time/date stamped by the Long Beach Utilities Department no later than the time and date stated for receipt of bids. The outside of this envelope shall clearly state “Bid Security for WD-52-22, Large Potable Water Valve Replacement Willow Street (EO-3598). DO NOT OPEN WITH REGULAR MAIL.” The Long Beach Utilities Department is located at 1800 East Wardlow Road, Long Beach, CA 90807.

BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 120 calendar days after the date of Bid opening.

CONTRACTOR’S LICENSE: The Contractor shall possess a valid California Class “A” General Engineering Contractor license at the time the Contract is awarded.

Failure to possess the specified license may render the Bid as non-responsive.

CALIFORNIA WAGE RATE REQUIREMENTS: This project is a public work under Labor Code § 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made available upon request. Copies may also be obtained on the California Department of Industrial Relations website http://www.dir.ca.gov/dlsr. This project will be subject the 2023-2 prevailing wage rate, as determined by the Director of the Department of Industrial Relations for the State of California. The Contractor to whom the Contract is awarded, and its subcontractors is directed to pay not less than the general rate of per diem wages for each craft, classification, or type of worker needed to execute the contract. Contractor

Of the City of Long Beach Page 4 of 6 is required to post a copy of the determination of the director of the prevailing rate of per diem wages at each job site. Contractors are required to pay at least the California minimum wage for the basic hourly rate in all cases where the published prevailing wage rate is below the California minimum wage. Any and all employer payments required by the prevailing wage determinations must also be paid. If the California minimum wage is increased in the future to an amount above that shown in the prevailing wage determination, the basic hourly rate in that determination automatically increases to the new minimum wage.

DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) COMPLIANCE: This project is a public work and subject to the following: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Contractors are further cautioned that certified payrolls shall be submitted electronically directly to the Department of Industrial Relations.

CERTIFIED PAYROLL SUBMISSION: Pursuant to the provisions of Labor Code Section 1776, Contractor shall keep and shall cause each subcontractor performing any portion of the work under this Contract to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by Contractor or subcontractor in connection with the work. Such payroll records for Contractor and all subcontractors shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor pursuant to the provisions of Section 1776 of the Labor Code. Contractor's failure to furnish such records to the Long Beach Utilities Department or the Long Beach Utilities Department’s authorized Labor Compliance representative in the manner provided herein for notices shall entitle the Long Beach Utilities Department to withhold the penalty prescribed by law from progress payments due to Contractor.

APPRENTICESHIP EMPLOYMENT: The Contractor shall comply with Section

1777.5 of the Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor and, by submitting a Bid and executing the Contract, the Contractor stipulates that it shall so comply. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

Of the City of Long Beach Page 5 of 6

PENALTIES: Contractor and subcontractors are subject to penalties, including, but not limited to, under Labor Code §§ 1775, 1776, 1777.7 and 1813, for failure to comply with Sections 13.28 through 13.31 and/or Labor Code § 1720 et seq.

NOTICE OF INTENT TO AWARD: The notice of intent to award a contract will be posted electronically on the Long Beach Buys Portal after all bids have been reviewed and evaluated for responsiveness. Actual posting time may vary.

RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the terms of the Contract Documents without retention of any portion of the payment by the Owner by depositing securities of equivalent or greater value with the Owner in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the Owner, whose decision on valuation of the securities shall be final. Eligible securities shall be limited to those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the Owner.

CONTACT: All communications relative to this Work shall be directed to the Owner (or Ardurra) prior to opening of the bids:

Ardurra 43410 Business Park Drive Temecula, CA 92590 Telephone: 760-518-6266 E-mail: aczajkowski@ardurra.com Attention: Amy Czajkowski, PE, CCM

Board of Public Utilities Commissioners of the City of Long Beach 1800 East Wardlow Road Long Beach, CA 90807-4931 Attention: Ryan Hiney Telephone: (562) 570-2319 E-mail: ryan.hiney@lbwater.org

Communications may be written or oral, but LBUD is not bound by any oral interpretation of the Contract Documents made by any City/LBUD employee, nor does LBUD guarantee the accurate transcription of oral questions.

OWNER’S RIGHTS RESERVED: The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make award to the lowest responsible bidder as it may best serve the interest of the Owner.

Of the City of Long Beach Page 6 of 6

DATE: _________________________

OWNER: Board of Public Utilities Commissioners of the City of Long Beach

By: __________________________ Christopher J. Garner, General Manager

Long Beach Utilities Department

END OF NOTICE INVITING BIDS

5/22/2023

Board of Public Utilities Commissioners Instructions to Bidders of the City of Long Beach Page 1 of 6

INSTRUCTIONS TO BIDDERS

REQUIREMENTS AND CONDITIONS

CONTRACT DOCUMENTS

The documents that comprise the Contract Documents are set forth in the Contract and the definition of “Contract Documents” in Article 1 of the General Conditions.

CONTRACTOR’S LICENSE

No bid will be accepted from a Bidder who is not a properly licensed contractor in the State of California. Bidders shall possess the appropriate licenses at the time the bid is submitted. Each Bidder shall record on the bid, the number and termination dates of all necessary licenses. A valid state license sufficient to qualify as the prime contractor is a pre-requisite for bidding. Necessary City licenses may be secured after the bids are opened but must be obtained prior to execution of the Contract.

BIDS

Entry of bid amounts will be accomplished electronically. Bids prices submitted on a paper bid form will not be accepted. Bidders are strongly encouraged to send an individual who is responsible for the bid, and not a runner. Bid Submission processes and how to access the bidding system will be discussed at the pre-bid meeting.

Bids shall be made in accordance with the following: The bid shall be submitted online at https://longbeachbuys.buyspeed.com/bso/ at keyword [Spec # i.e. WD-52- 22]. Bidders must be registered on the City’s portal to access the bidding page and to download the plans and specifications. All documents to be submitted with the bid are contained in Part 2 of this Specification; these documents shall be scanned and uploaded with the bid. The originals of the Bidder’s Bond, and any other document which may require notarization, must be placed in a sealed envelope, clearly marked on the outside with “WD-52-22, Large Potable Water Valve Replacement Project Willow Street (EO-3598), DO NOT OPEN WITH REGULAR MAIL,” and these originals must be received by the City Clerk at the address shown in the Notice Inviting Bids by the time and date stated therein. These originals may be mailed or hand-delivered, but the LBUD is not responsible for lost or misdirected mail. The LBUD’s time-stamp clock is the official time for receipt of documents.

Bids shall not contain any additional description or summaries of the Work to be done, and shall not be modified in any way by bidders. Alternates will not be considered, except as called for. No oral, telegraphic, or telephonic bids or modifications will be considered.

of the City of Long Beach Page 2 of 6

The Bid Form included in Part 1 is provided to assist Bidders in the preparation of their bid, but bids shall be entered electronically as directed above, as well as in Part 1 of this Specification and the Notice Inviting Bids. Bidders shall complete all items of the Bid.

The electronic bidding system will total the amount bid.

Bidders are cautioned that the electronic bidding system will cease allowing entry at the time stated for bid opening, regardless of when entry was begun. Bidders are reminded to begin bid submission with sufficient time to complete the entries.

Bidders shall sign the bid properly, in longhand.

LBUD will not consider any bid that does not meet these requirements.

Bidders shall include with their Bids in the manner described above the security shown in the Notice Inviting Bids. LBUD will reject any Bid not accompanied by such Bid Security.

WITHDRAWAL OF BID

A Bidder may withdraw the bid either personally or by a signed written request delivered to Owner any time prior to the scheduled time for opening of the bids.

STATEMENTS MADE AFTER BID OPENING BUT PRIOR TO AWARD OF

CONTRACT

Bidders are cautioned that comments and statements, whether oral or written, made by Owner employees regarding the validity of bids, the waiver of deviations from Specifications, the possibility or probability of an award being made to a particular Bidder, and other similar matters are NOT binding by the Owner. Bidders should not order materials, obtain financing or take other actions based on such comments and statements. Only authorization of a contract by the Owner is conclusive and binding on the Owner with respect to this bid and its resulting contract.

BIDDERS INTERESTED IN MORE THAN ONE BID

No person, partnership or corporation shall be allowed to make or file or be interested in more than one bid for the Work, unless alternative bids are called for.

A person, partnership, or corporation submitting a price to a Bidder, or who has quoted prices on material to a Bidder, is not disqualified from quoting prices to other Bidders.

INTERPRETATION OF PLANS AND OTHER DOCUMENTS

of the City of Long Beach Page 3 of 6

If any prospective Bidder is in doubt as to the true meaning of any part of the plans, specifications, or other Contract Documents, or finds discrepancies in, or omissions from the Plans and Specifications or other Contract Documents, the Bidder may submit to Owner a written request for an interpretation or correction. An interpretation or correction of the documents will be made solely by Owner by Addendum. Owner and Owner’s employees, agents or consultants will not be responsible for any other explanation or interpretation of the documents.

ENGINEER’S ESTIMATE OF QUANTITIES OR WORK

The quantities of work to be done and materials to be furnished are approximate as shown in the Contract Documents and are given as a basis for comparison of bid only. Owner does not expressly or by implication agree or represent that the actual amount of work will correspond with the Engineer’s estimates.

ADDENDA

Addenda issued in writing before the time in which to submit bids expires shall be covered in the bid and shall form a part of the Contract Documents.

EXISTING CONDITIONS AND EXAMINATION OF CONTRACT DOCUMENTS

GENERAL

Each Bidder shall visit the sites of construction so that the facilities, difficulties, and restrictions attending the execution of the Work are fully understood. Bidders shall thoroughly examine and be familiar with the drawings and specifications. Bidders shall carefully correlate observations with requirements of the Contract Documents and otherwise satisfy themselves of the expense and difficulties attending performance of the work. The failure or omission of any Bidder to receive or examine any Contract Document, form, instrument, addendum, or other document or to visit the sites and become acquainted with conditions there existing shall not relieve any Bidder from obligations with respect to the bid or to the Contract. The submission of a bid shall be taken as prima facie evidence of compliance with this section. Bidders shall not, at any time after submission of the bid, dispute or assert that there were any misunderstandings in regard to the nature or amount of work.

SITES

Bidder shall be responsible for identifying and setting up an area for temporary storage of materials and equipment during construction. Upon completion and acceptance of the Work, all equipment, unused materials, temporary facilities, and other miscellaneous items resulting from or used in the operations shall be removed.

The sites shall be restored to their original ground configuration by filling any pits or trenches and leveling soil piles or ruts. All stored materials and equipment shall be removed from the sites as part of demobilization upon completion of the Work.

of the City of Long Beach Page 4 of 6

At all times during the Work, keep the premises clean and orderly, and upon completion of the Work, repair all damage caused by equipment and leave the sites clear of rubbish or excess materials of any kind.

SITE INVESTIGATION AND REPRESENTATION

By submitting a Bid, the Bidder acknowledges satisfaction as to the nature and location of the Work, the general and local conditions, particularly those bearing upon availability of transportation, access to the sites, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather, river stages, or similar physical conditions at the sites, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during the Work, and all other matters which can in any way affect the Work or the cost thereof.

By submitting a Bid, the Bidder further acknowledges satisfaction as to character, quality, and quantity of surface and subsurface materials to be encountered from its inspection of the sites and from reviewing any available records of other exploratory work. Failure by the Bidder to become acquainted with the physical conditions of the sites and all the available information will not relieve the Bidder from responsibility for properly estimating the difficulty or cost of successfully performing the Work.

The Bidder warrants by submitting a bid that, as a result of examination and investigation of all the aforesaid data, the Bidder can perform the Work in a good and workmanlike manner and to the satisfaction of the Owner. The Owner assumes no responsibility for any representations made by any of its employees, officers or agents during or prior to the execution of a Contract, unless (1) such representations are expressly stated in the Contract, and (2) the Contract expressly provides that the responsibility therefor is assumed by the Owner.

AWARD OF CONTRACT OR REJECTION OF BIDS

AWARD

The award will be to the lowest responsible Bidder complying with the Contract Documents. The Owner, however, reserves the right to reject any and all bids, and to waive any informality in bids received. If, in the judgment of Owner, a bid is unbalanced, it shall be considered sufficient grounds for rejection of the entire bid.

Before award of the Contract, any Bidder upon request from the Owner shall furnish a recent statement of the Bidder’s financial condition and previous construction experience or such other evidence of qualifications as may be requested by Owner.

Failure to do so shall constitute grounds for rejection of the bid.

BONDS

of the City of Long Beach Page 5 of 6

The form of bonds that the Bidder, as Contractor, shall be required to execute are included in the Contract Documents and should be carefully examined by the Bidder.

The Contractor, simultaneously with the execution of the Contract, will be required to furnish a payment bond and a performance bond, each in an amount equal to one hundred (100) percent of the Contract Price. Said bonds shall be secured from a surety satisfactory to Owner and who is authorized to transact business in California.

Said bonds shall continue in full force and effect for the guarantee period.

EXECUTION OF CONTRACT

The Contractor shall sign the Contract and return it to Owner, together with the bonds and certificates of insurance and endorsements, within ten (10) calendar days after the mailing date of the Notice of Award. The date of commencement stated in the Notice of Award will constitute the beginning of the Contract Time. The Contract, bonds, certificates of insurance and endorsements and other documents to be executed by Contractor shall be executed and submitted in duplicate, one of which shall be filed with the Owner and one returned to the Contractor. Owner will issue a Notice to Proceed. The receipt of the Notice to Proceed will be authorization for Contractor to begin Work in the field and to start ordering equipment and material.

FAILURE TO EXECUTE CONTRACT OR SUBMIT INSURANCE

Failure by a Bidder to whom the Work is awarded to execute the Contract and file acceptable bonds and certificates of insurance coverage and endorsements as provided herein shall be just cause for the cancellation of the award and the forfeiture of the bid security, and shall make the Bidder liable to Owner for all damages resulting from the failure, including reasonable attorney’s fees. The value of the bid security shall not be a limitation of damages.

The insurance certificates and endorsements included in the Contract Documents shall be completed, without alteration, to the satisfaction of Owner, and delivered to Owner by Contractor or Contractor’s insurance company within ten (10) days after the date of the Notice of Award. The insurance certificates and endorsements shall reflect coverage that complies with all insurance requirements in the Contract Documents.

MISCELLANEOUS

BID BREAKDOWN

Lump-sum and unit-price bid items shall be broken down as indicated on the bid form. Contractor may be directed to provide greater detail of the items making up the Contract Price prior to submission of the first Progress Payment Request as indicated in the General Conditions.

of the City of Long Beach Page 6 of 6

The bidder shall set forth for each item of Work, in clearly legible figures, a unit price and an item total for each item of Work in the respective spaces provided for this purpose. In the case of unit prices, the amount set forth under the ITEM TOTAL column shall be the extension of unit price bid multiplied by the estimated quantity for the item. If the bidder fails to enter a unit price and enters only an item total, then the Owner will divide the item total by the estimated quantity to arrive at a unit price, and the bidder shall be locked by that unit price. If the unit price is less than one cent, be sure that the proper number of zeros are included. If there is a discrepancy between the unit price and the item total, the unit price shall prevail over the item totals and the Owner will correct the item total.

The summation of all items in the ITEM TOTAL column shall be placed at the caption TOTAL AMOUNT BID. The TOTAL AMOUNT BID is informational only and may be used for comparison in determining the apparent low Bid at time of Bid opening. The summation of the mathematically correct extended totals for each item under the ITEM TOTAL column is the intended bid. Any errors shall, at the option of the Owner, constitute grounds for the rejection of the Bid.

CONTRACT TIME

The Contract Time shall be as set forth in the Notice Inviting Bids.

LIQUIDATED DAMAGES

Liquidated damages, if any, shall be as set forth in Article 17.5 of the General Conditions of the Contract Documents.

END OF INSTRUCTIONS TO BIDDERS

Board of Public Utilities Commissioners Bid of the City of Long Beach Page 1 of 12

BID TO THE BOARD OF PUBLIC UTILITIES COMMISSIONERS

OF THE CITY OF LONG BEACH FOR

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

WILLOW STREET (EO-3598)

PER SPECIFICATION WD-52-22

Name of Bidder_________________________________________________________

Street Address_________________________________________________________ in the City of __________________________ County of________________________

State of ____________ Zip Code________________ Phone No.__________________

TO: BOARD OF PUBLIC UTILITIES COMMISSIONERS OF THE CITY OF LONG

BEACH

Pursuant to and in compliance with your Notice Inviting Bids and the other documents relating thereto, the undersigned bidder, having familiarized itself with the Contract Documents, local conditions affecting the performance of the Work, and the cost of the Work at the place where the Work is to be done, hereby bids and shall perform within the time stipulated in the Contract Documents, and shall provide and furnish any and all of the labor, material, tools, expendable equipment, and all utility and transportation services necessary to perform the Work and complete, in a workmanlike manner all of the Work required in the Contract Documents, including Addenda, for the prices hereinafter set forth.

The undersigned, as Bidder, declares that the only persons or parties interested in this bid as principals are those named herein; that this bid is made without collusion with any person, firm, or corporation; and bidder shall, if the bid is accepted, execute a Contract with the Board of Public Utilities Commissioners of the City of Long Beach, and that Bidder shall accept in full payment thereof the following prices, to wit:

of the City of Long Beach Page 2 of 12

BID

Furnish all labor, materials, equipment, applicable taxes, and incidentals necessary for the accomplishment of the following specific work items, each being the LUMP SUM (LS)

PRICE, EACH (EA), SQUARE FOOT (SF) PRICE, STIPULATED DOLLAR AMOUNT,

OR EACH PRICE for the specific item:

Item No. Description Size-Quantity Unit Unit Price Item Total

BASE BID ITEMS

1 Mobilization/Demobilization 1 LS $ $

2 Excavation Safety Measures 245 CY $ $

3 Traffic Control and Restriping for all Phases of Work 1 LS $ $

4 Permits and Inspection Reimbursement Allowance 1 Allowance $ 5,000 $ 5,000

5 Construction Information Signs 6 EA $ $

6 Changeable Message Boards 6 EA $ $

Excavation for Verification of Subsurface Conditions, Utility Potholing, and Exposing Existing Pipe Cylinder for OD Measurement

1 LS $ $

8 Dewatering of Pipelines (Locations 1, 2, and 3) 1 LS $ $

9 Misc. Demolition and Disposal of Existing Waterlines and Valves 1 LS $ $

10 Furnish and Install 20-inch Line-Stop (Location 1) 4 EA $ $

11 Furnish and Install 20-inch Line-Stop (Location 2) 1 EA $ $

12 Furnish and Install 20-inch Line-Stop (Location 3) 2 EA $ $

Remove and Disposal of Existing 20-inch Gate Valves, 2” Blow Off Assembly, and Associated Pipe, Bypass Valve and Appurtenances (Location 1)

3 EA $ $

Remove and Disposal of Existing 20-inch Gate Valves and Associated Pipe, Bypass Valve and Appurtenances (Location 2)

1 EA $ $

Remove and Disposal of Existing 20-inch Gate Valves and Associated Pipe, Bypass Valve and Appurtenances (Location 3)

2 EA $ $

of the City of Long Beach Page 3 of 12

Item No. Description Size-Quantity Unit Unit Price Item Total

Install Owner Supplied 20-inch Butterfly Valve and Associated Pipe, Fittings, Couplings, and Appurtenances– Locations 1A,1B, and 1C

3 EA $ $

Install Owner Supplied 20-inch Butterfly Valve and Associated Pipe, Fittings, Couplings, and Appurtenances – Location

1 EA $ $

Install Owner Supplied 20-inch Butterfly Valve and Associated Pipe, Fittings, Couplings, and Appurtenances – Locations 3A and 3B (Stage 3)

2,500

EA $ $

19 Hydrostatic Testing and Chlorination for Locations 1, 2, and 3 1 LS $ $

20 Construct Pavement Replacement and Restoration SF $ $

21 Removal of 12-inch Gate Valve, Location

2 1 EA $ $

SUBTOTAL (BID ITEMS 1-21) $

OPTIONAL ITEMS

22 OPTIONAL – Removal of Underground Concrete, Slurry, or Cement-Treated Base 10 CY $ $

23 OPTIONAL – Allowance for Field Orders 1 Allowance $ 75,000 $ 75,000

24 OPTIONAL – Allowance to Excavate and Dispose of Contaminated Soils 1 Allowance $ 10,000 $ 10,000

SUBTOTAL (BID ITEMS 22-24)

TOTAL AMOUNT BID (BID ITEMS 1 Through 24) $

Signature of Bidder

Name/Title

Date

It is understood that the foregoing quantities are estimated only and are solely for the purpose of facilitating the comparison of bids, and that the Contractor’s compensation will be computed upon the basis of the actual quantities in the completed Work.

Each individual bidder shall review the Plans and Specifications, and all other portions of the Contract Documents, and shall include all items necessary to complete the Work, including the assumption of all obligations, duties, and responsibilities necessary to the successful completion of the Contract, and the furnishing of all materials and equipment of the City of Long Beach Page 4 of 12 required to be incorporated in and form a permanent part of the Work: tools, equipment, supplies, transportation, facilities, labor, superintendence, and services required to perform and complete the Work; and bonds, insurance and submittals; all as per the requirements of the Contract Documents, whether or not expressly listed or designated.

of the City of Long Beach Page 5 of 12

STATEMENTS BY BIDDER

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

Bidder shall indicate opposite each item listed below the name of the manufacturer and product model number proposed to be used for the Work. An award to the Bidder will not imply approval by the Owner of a manufacturer or supplier listed by the bidder. However, if a manufacturer or supplier is acceptable to the Owner, the Bidder shall furnish the items from the manufacturer or supplier indicated. Any manufacturer or supplier listed in the Contract may be substituted, changed, or omitted by the successful bidder, subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission.

The listing of any manufacturer or supplier in the Contract does not, and is not intended to grant any right, title, or interest in the Contract for the benefit of the named manufacturer or supplier. Each Bidder shall inform in writing each named manufacturer or supplier that the named manufacturer or supplier is listed for information purposes only and that the manufacturer or supplier may be substituted, changed or omitted by the Bidder in accordance with the law and subject to the approval of the Owner, without subjecting the Owner to any liability for the substitution, change or omission. The Bidder shall reimburse the Owner for any expenses incurred by the Owner as a result of the Bidder’s failure to notify each named manufacturer or supplier.

The listing of lead times for delivery is for informational purposes only and will not affect the Contract Time(s) specified herein or entitle the Bidder, who becomes the Contractor, to extensions(s) of time. The Bidder is responsible for obtaining delivery of all items at times that will ensure completion within the Contract Time(s).

A. Lead time for delivery from date of signing the Contract shall be as follows:

Ductile Iron Pipe and Fittings

Restrained Coupling Adapters

20-inch Line-Stop of the City of Long Beach Page 6 of 12

B. The Bidder intends to furnish materials supplied by the following manufacturers:

(Bidder shall list one manufacturer only for each item.)

Item Manufacturer Model Number

Ductile Iron Pipe and Fittings _____ _____

Restrained Coupling Adapters _____ _____ ____

20-inch Line-Stop ___ _____ _____ ____

C. Person who inspected site of the Work for the Bidder:

Name__________________________ Date of Inspection:__________________

Name__________________________ Date of Inspection:__________________

D. It is agreed that, if requested by the Owner, the Bidder shall furnish a notarized financial statement, references, and other information, sufficiently comprehensive to permit an appraisal of Bidder’s current financial condition.

E. The Bidder shall furnish the following information. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.

Additional sheets may be attached if necessary.

1) Street Address ________________________________________________

2) Type of Firm: Individual _____________________________________

Partnership _____________________________________ Limited__________ General_________

Limited Liability Company__________ State___________

Joint Venture_____________________________________

Corporation _____________________________________

State of Incorporation or Partnership __________________

3) Telephone ________________________________________________

4) Contractor’s license: Primary Class______ Lic. No. ____________________

Supplemental classifications held, if any:_______________________________

5) DIR Public Works Contractor Registration No. ___________________________ of the City of Long Beach Page 7 of 12

6) Number of years as a contractor in construction work of this type:____________

7) Three projects of this complexity recently completed by the Bidder and/or the

Subcontractor(s):

a. Bidder or Subcontractors Name:

Type of Project:

Work Performed:

Contract Amount::

Date Completed:

Owners Name:

Contact Name and Phone No.:

b. Bidder or Subcontractors Name:

Work Performed:

Contract Amount::

Date Completed:

c. Bidder or Subcontractors Name:

Work Performed:

Contract Amount::

Date Completed:

of the City of Long Beach Page 8 of 12

ADDENDA ACKNOWLEDGMENT

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

Bidder shall signify receipt of all addenda (if any) here:

Addenda Nos.

Respectfully submitted, Contractor’s Legal Name

By ________________________________________

Title _______________________________________

Street Address

Telephone Number

Contractor’s License Number

Dated:______________________________________

NOTE: If Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation, if Bidder is a partnership, the true name of the partnership shall be set forth above, together with the signature of the general partner or partners authorized to sign contracts on behalf of the partnership; if the Bidder is an individual, his/her signature shall be placed above; if the Bidder is a joint venture, the name of the joint venture shall be set forth above with the signature of an authorized representative of each venturer; if the Bidder is a limited liability company, the legal name of the company shall be set forth above with the signature of a principal authorized to bind the Company.

of the City of Long Beach Page 9 of 12

CERTIFICATION OF BIDDER’S QUALIFICATIONS

LARGE POTABLE WATER VALVE REPLACEMENT PROJECT

The undersigned Bidder certifies that Bidder is, at the times of bidding, and shall be throughout the period of the Contract, licensed by the State of California to do the type of work required under the terms of the Contract Documents. Bidder further certifies that Bidder is skilled and regularly engaged in the general class and type of work called for in the Contract Documents.

The Bidder represents that Bidder is competent, knowledgeable and has special skills regarding the nature, extent and inherent conditions of the Work to be performed. Bidder further acknowledges that there are certain peculiar and inherent conditions that exist in the Work which may create, during the Work, unusual, peculiar, or unsafe conditions hazardous to persons and property.

Bidder expressly acknowledges that Bidder is aware of such peculiar risks and that it has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the Work with respect to such hazards.

Furthermore, Bidder hereby certifies to the Owner that all representations, certifications, and statements made by the Bidder, as set forth in this Bid, are true and correct and are made under penalty of perjury.

Signed this _____ day of _______________, 20_____

Name of Bidder

Contractor’s License No.

Contractor’s License Expiration Date

Signature of Bidder

Title of the City of Long Beach Page 10 of 12

NONCOLLUSION AFFIDAVIT TO BE EXECUTED

BY BIDDER AND SUBMITTED WITH BID

WD-52-22 – DRAWING NO. EO-3598

State of California County of ________________ } ss.

(1)__________________________________, being first duly sworn, deposes and says that he or she is (2)____________________of (3)______________________________ the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

(4)_________________________________