Large Potable Water Valve Replacement Project Summary
This is a construction plans document prepared by the City of Long Beach Utilities Department for the Large Potable Water Valve Replacement Project on Willow Street (Project ID: EO-3598, Contract No. WD-52-22). The project involves replacing existing 20-inch gate valves with 20-inch butterfly valves at three locations: West Willow Street and Delta Avenue (Location 1), West Willow Street and Santa Fe Avenue (Location 2), and West Spring Street and Delta Avenue (Location 3). The work includes removal of existing cast iron and ductile iron pipes, installation of new ductile iron spool pieces with flanged end connections, installation of line-stop devices for isolation, and restoration of street pavement and surfaces. The project encompasses 16 sheets of detailed plans showing valve and pipe isolation plans, gate valve demolition plans, butterfly valve replacement plans, butterfly valve replacement details at each location, and line-stop excavation details. Construction must comply with the latest edition of Standard Specifications for Public Works Construction, City of Long Beach Water Department standards, and all applicable American Water Works Association (AWWA) standards.
The contractor shall maintain the existing water main in-service during construction and submit a water supply bypass plan for approval prior to construction, including temporary fire protection. Estimated dewatering volumes are 4,500 gallons for Willow Street and Delta Avenue, and 2,300 gallons for West Spring Street and Delta Avenue. All work requires notification to Underground Service Alert (811) a minimum of 48 hours prior to excavation, with standby required for any work within 25 feet of petroleum or gas pipelines. The contractor must obtain approval from the Long Beach Utilities Department for submittals and contact the department at least two weeks prior to starting construction. All pipe shall be hydrostatically tested to 150 PSI and both hydrostatic and bacterial (BAC-T) tests must be completed and acceptable prior to system connections. Street paving restoration shall follow City standards, and all traffic control shall comply with Caltrans Manual of Traffic Controls and City of Long Beach standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LONG BEACH UTILITIES DEPARTMENT
LONG BEACH, CALIFORNIA
PLANS FOR THE CONSTRUCTION OF
MAY 2023
GENERAL MANAGER
CHRISTOPHER J. GARNER
WD-52-22
ROBERT VERCELES - DIRECTOR OF ENGINEERING / CHIEF ENGINEER DATE
LONG BEACH UTILITIES DEPARTMENT
APPROVED BY:
AMY R. CZAJKOWSKI R.C.E. # DATE
LARGE POTABLE WATER VALVE REPLACEMENT PROJECT
WILLOW STREET (EO-3598)
ARDURRA
SUBMITTED BY:
PROJECT MANAGER
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
GATE VALVES REC.
SCALE
CONTRACT NO.
CHECKED BY
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I L E
N
A M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d w g
D
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
N/A
COVER SHEET
E19 & E20
C59082 04/05/2023
5/11/2023
5-16-2023
LOCATION MAP
1. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY, AND HOLD HARMLESS THE CITY AND THE ENGINEER FROM ANY AND ALL LIABILITY REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT.
2. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, AND IN ACCORDANCE WITH THE CITY OF LONG BEACH AMENDMENTS TO STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (LATEST EDITION), THE CITY OF LONG BEACH WATER DEPARTMENT WATER AND SEWER STANDARDS, ALL APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS, AND IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, ALL TO THE SATISFACTION OF THE LONG BEACH UTILITIES DEPARTMENT (LBUD).
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES IN PLANS AND/OR FIELD CONDITIONS IMMEDIATELY TO DESIGN ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION AND SHALL BE RESPONSIBLE FOR DISCREPANCIES NOT SO
REPORTED AND RESOLVED.
4. THE CONTRACTOR SHALL PERFORM A UTILITY SEARCH FOR THE PROJECT AREAS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS, AND IS RESPONSIBLE FOR ANY DAMAGE TO THESE LINES OR STRUCTURES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY RESPECTIVE UTILITIES AND UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA (811) TO DETERMINE THE EXACT FIELD LOCATION OF UTILITIES WHICH MAY CONFLICT WITH THE WORK.
5. THE CONSTRUCTION DRAWINGS SHOW THE GENERAL LOCATION AND DEPTH OF UNDERGROUND UTILITIES BASED ON THE BEST INFORMATION AVAILABLE TO LBUD. LBUD DOES NOT GUARANTEE THE LOCATION AND DEPTH OF UNDERGROUND UTILITIES IN
AREAS REQUIRING EXCAVATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES, PAVEMENT, CURBS, TRAFFIC, STRIPING, MARKER AND MARKINGS, TRAFFIC SIGNAL DETECTOR LOOPS, STREET CONDUITS, STRUCTURES, TREES, AND IRRIGATION SYSTEMS, AS A RESULT OF THEIR OPERATIONS, AND WILL BE REQUIRED TO REPAIR OR REPLACE SAME TO THE SATISFACTION
OF, AND AS DIRECTED BY, LBUD, THE ENGINEER, UTILITY COMPANY, OR PROPERTY OWNER.
7. THE CONTRACTOR SHALL HAVE COPIES OF THE PLANS, SPECIFICATIONS, AND PERMITS FOR THIS PROJECT ON THE PROJECT SITE AT ALL TIMES. CONTRACTOR SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS AND SPECIFICATIONS.
8. SANITARY FACILITIES SHALL BE MAINTAINED ON SITE.
9. THE CONTRACTOR SHALL COOPERATE WITH CONTRACTORS PERFORMING OTHER CONSTRUCTION WORK IN AREAS ADJACENT TO
THE PROJECT SITE.
10. THE CONTRACTOR SHALL MAINTAIN DUST CONTROL AT ALL TIMES. DUST SHALL BE CONTROLLED BY WATERING.
11. THE WALLS AND FACE OF ALL EXCAVATIONS FIVE (5) FEET OR GREATER IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING SYSTEM, SLOPING OF THE GROUND, OR OTHER EQUIVALENT MEANS. TRENCHES OR EXCAVATIONS LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION BY A COMPETENT PERSON INDICATES THAT HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS
DESCRIBED FROM CAL-OSHA.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE EXISTING WATER MAIN IN-SERVICE DURING CONSTRUCTION AND SHALL SUBMIT A WATER SUPPLY BYPASS PLAN FOR APPROVAL BY LBUD PRIOR TO CONSTRUCTION. THE BYPASS PLAN
SHALL INCLUDE TEMPORARY FIRE PROTECTION.
13. DUCTILE IRON PIPE AND FITTINGS SHALL BE CLASS 52 AND ENCASED WITH POLYETHYLENE ENCASEMENT. RESTRAINED JOINT
FITTINGS SHALL BE SPECIFIED UNLESS OTHERWISE NOTED.
14. PROPOSED WATER MAINS SHALL HAVE A MINIMUM COVER OF 42 INCHES UNLESS OTHERWISE NOTED ON THE PLANS.
15. ALL BURIED DUCTILE IRON VALVES, COUPLINGS, AND APPURTENANCES SHALL BE COATED WITH NO-OX-ID COMPOUND WRAPPED
WITH NO-OX-ID TAPE, AND DOUBLE ENCASED WITH POLYETHYLENE ENCASEMENT.
16. BURIED JOINING HARDWARE USED FOR FLANGED CONNECTIONS & FLEX/TRANSITION COUPLINGS SHALL BE TYPE 316 STAINLESS
STEEL.
17. RESTRAINED JOINT FITTINGS AND THRUST BLOCKS SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, CONNECTIONS, VALVES, AND FITTINGS LOCATIONS. INSTALL THRUST BLOCKS AT NEW PIPE AND CLOSEST TO CONNECTION TO EXISTING PUSH-ON JOINT PIPE. (THRUST BLOCKS USE 2,000 PSF SOIL BEARING VALUE PER LBUD STD DWG. WDS-107)
18. ALL PIPE SHALL BE FIELD HYDROSTATICALLY TESTED TO 150 PSI IN ACCORDANCE WITH SPECIFICATIONS.
19. HYDROSTATIC AND BAC-T TESTS SHALL BE COMPLETED AND ACCEPTABLE PRIOR TO CONSTRUCTION SYSTEM CONNECTIONS.
20. A MAXIMUM OF 500 LINEAL FEET OF TRENCH PLATES SHALL BE USED ON THE PROJECT AT ANY GIVEN TIME. GRIND PAVEMENT
UNDER EDGES OF STEEL TRENCH PLATES TO RECESS TRENCH PLATES FLUSH WITH PAVEMENT.
21. STREET PAVING SHALL BE RESTORED PER LBUD STD DWG WDS-406.
22. THE CONTRACTOR SHALL SALVAGE CAST IRON VALVE BOX SLEEVE AND LID AT ALL LOCATIONS WHERE EXISTING VALVES ARE TO BE TAKEN OUT OF SERVICE. (REFER TO ABANDONED VALVE TABLE ON SHEET 9 AND 10 FOR LIST OF VALVES.) CONTRACTOR SHALL BACKFILL VALVE BOX HOLE WITH CONCRETE SLURRY MIX. CONTRACTOR SHALL DELIVER TO LBUD MAINTENANCE YARD
SALVAGED VALVE BOX PARTS.
23. PROTECT IN PLACE STREET CENTERLINE AND SURVEY MONUMENTS. ANY MONUMENTS THAT MUST BE REMOVED FOR
CONSTRUCTION SHALL BE REPLACED BY A CALIFORNIA LICENSED LAND SURVEYOR.
24. BACKFILL TRENCH ZONE WITH NATIVE EARTH BACKFILL OR IMPORTED BACKFILL PER TRENCHING, BACKFILLING, AND COMPACTING SPECIFICATIONS. INSTALL SAND-CEMENT SLURRY BACKFILL WHERE NOTED ON PLANS. THE CONTRACTOR HAS THE OPTION OF BACKFILLING WITH SAND-CEMENT SLURRY IN LIEU OF NATIVE OR IMPORTED MATERIALS AT THEIR DISCRETION.
25. TRAFFIC SHALL BE MAINTAINED AT ALL TIMES AND SHALL BE PROTECTED WITH ADEQUATE BARRICADES, LIGHTS, SIGNS, AND WARNING DEVICES, PER THE CURRENT CALTRANS MANUAL OF TRAFFIC CONTROLS AND PER THE DIRECTION OF THE CITY OF
LONG BEACH.
26. PROVIDE TRAFFIC CONTROL AS NEEDED PER THESE TRAFFIC CONTROL PLANS AND IN CONFORMANCE WITH CITY OF LONG BEACH STANDARD DETAIL 340 THROUGH 386. MAINTAIN PUBLIC ACCESS ON PUBLIC STREETS AND SAFETY AROUND CONSTRUCTION SITE. IF ANY OF THE PROPOSED WORK REQUIRES TRAFFIC CONTROL CONFIGURATIONS NOT SHOWN ON THESE PLANS, THE CONTRACTOR'S BID SHALL INCLUDE THIS WORK AS PART OF THE TOTAL BID PRICE. CONTRACTOR TO PREPARE
TRAFFIC CONTROL PLANS FOR APPROVAL BY LBUD AND THE CITY OF LONG BEACH.
27. OPERATION OF ALL VALVES ON THE PUBLIC WATER LINES SHALL BE PERFORMED BY LBUD UNLESS OTHERWISE SHOWN.
COORDINATE ALL VALVE OPERATIONS WITH LBUD AS REQUIRED.
28. ALL CONCRETE PAVING, INCLUDING SIDEWALKS, CURBS, AND GUTTERS REQUIRING REMOVAL, SHALL BE SAWCUT AND REPLACED
IN KIND TO THE NEAREST CONSTRUCTION JOINT.
29. THE CONTRACTOR SHALL PROVIDE FOR PUBLIC SAFETY AND CONVENIENCE DURING ALL PHASES OF THE WORK. CONTRACTOR SHALL ESTABLISH ADEQUATE ACCESS TO ALLEYS AND GARAGES AT THE END OF EACH WORKING DAY TO THE SATISFACTION OF
THE CITY OF LONG BEACH AND LBUD.
30. EXISTING PIPE OUTER DIAMETER CAN VARY. THE CONTRACTOR SHALL EXCAVATE AND EXPOSE THE WATER MAIN ON BOTH SIDES OF SUBJECT LARGE VALVES REQUIRING CONNECTION TO DETERMINE EXISTING DEPTH, MATERIAL, OUTSIDE DIAMETER, AND CONDITIONS AND ASSURE HIMSELF THAT ALL FABRICATED AND PRE-ASSEMBLED PIPING AND FITTINGS WILL BE COMPATIBLE
WITH THE EXISTING PIPE.
31. THE CONTRACTOR SHALL EXCAVATE ALL UTILITY CROSSINGS AND POINTS OF CONNECTIONS WITHIN THE EXCAVATED LOCATION OF THE VALVE REMOVALS TO FIELD VERIFY THE EXACT LOCATION, SIZE, DEPTH, AND TYPE OF ALL EXISTING UTILITIES AND INTERFERENCES SITUATED ALONG THE ROUTE OF THE PROPOSED CONSTRUCTION PRIOR TO COMMENCEMENT OF EXCAVATION, FABRICATION, AND INSTALLATION. SEE SECTION 31 05 50 OF THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
32. LBUD CANNOT GUARANTEE A COMPLETE SHUT DOWN OF EXISTING WATER MAINS BECAUSE OF THE AGE AND CONDITION OF EXISTING VALVES. LBUD WILL ATTEMPT TO SHUT DOWN APPLICABLE MAINS AS COMPLETELY AS POSSIBLE. HOWEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR DE-WATERING AND ISOLATION OF PIPELINES AND SUBJECT VALVES AT THE
CONTRACTOR'S EXPENSE.
33. ALL CONSTRUCTION ACTIVITIES SHALL COMPLY WITH THE CURRENT CITY OF LONG BEACH NOISE REGULATIONS AS DEFINED IN
THE LONG BEACH MUNICIPAL CODE.
34. THE CONTRACTOR SHALL PROVIDE A PRE-CONSTRUCTION VIDEO IN DVD OF THE PROJECT AS PART OF THE WORK. REFER TO
SECTION 01 32 33 OF THE SPECIFICATIONS.
35. ALL WORK SHALL COMPLY WITH CONDITIONS ESTABLISHED BY THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD.
36. COMPACTION TESTS SHALL BE PERFORMED BY A LABORATORY AS DESCRIBED IN THE SPECIFICATIONS.
37. SURPLUS AND MATERIAL REMOVED WHICH ARE NOT SUITABLE FOR USE IN THIS PROJECT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF AWAY FROM THE JOB SITE IN A MANNER AND AT A LOCATION ACCEPTABLE TO ALL
CONTROLLING AGENCIES.
38. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN UNANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF SITE. SUCH "DISCHARGES" OF MATERIAL. OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS SUBSTANCE IN A QUALITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302. MATERIALS WHICH MAY HAVE EFFECTS OF POLLUTION INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PERSERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE DETERGENT OF FLOATABLE WASTES; WASTES FROM ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING, AND SUPER CHLORINATED POTABLE WATER LINE FLUSHINGS. DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS.
39. CONTRACTOR SHALL USE BEST MANAGEMENT PRACTICES (BMP'S). SAND BAGS AND FABRIC SHALL BE PLACED OVER ANY STORM
DRAINS IN CLOSE PROXIMITY TO THE PROJECT SITE.
40. CONTRACTOR SHALL REPLACE ANY EXISTING TRAFFIC STRIPING AND/OR PAVEMENT MARKINGS WHICH DURING HIS OPERATIONS HAVE BEEN EITHER REMOVED OR THE INTEGRITY HAS BEEN COMPROMISED. ALL RESTRIPING WILL REQUIRE TWO COATS (TWO PASSES) AS A MINIMUM AND BE SUPPLEMENTAL WITH RAISED REFLECTIVE PAVEMENT MARKERS AS REQUIRED.
SHEET INDEX
SHT NO. SHEET TITLE
1 COVER SHEET
2 GENERAL NOTES, PUBLIC AGENCIES AND UTILITIES, SHEET INDEX, AND LOCATION MAP
3 OVERALL SITE PLAN
4 LOCATION 1 (W. WILLOW ST. & DELTA AVE.) VALVE & PIPE ISOLATION PLAN
16 LINE-STOP DETAILS
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.) VALVE & PIPE ISOLATION PLAN
LOCATION 3 (W. SPRING ST. & DELTA AVE.) VALVE & PIPE ISOLATION PLAN
LOCATION 1 (W. WILLOW ST. & DELTA AVE.) GATE VALVE DEMOLITION PLAN
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.) GATE VALVE DEMOLITION PLAN
LOCATION 3 (W. SPRING ST. & DELTA AVE.) GATE VALVE DEMOLITION PLAN
LOCATION 1 (W. WILLOW ST. & DELTA AVE.) BUTTERFLY VALVE REPLACEMENT PLAN
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.) BUTTERFLY VALVE REPLACEMENT PLAN
LOCATION 3 (W. SPRING ST. & DELTA AVE.) BUTTERFLY VALVE REPLACEMENT PLAN
GENERAL NOTES
PROJECT LOCACTION
PUBLIC AGENCIES AND UTILITIES
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
FI
LE
N A
M E
: L A
R G
E V
A
LV
E R
E P
LA
C
E M
E N
T( E
O -3
8)
.d w g D
E S
IG
N
B Y
: B . L
U
N/A
MUNIS PROJECT: 6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
N/AC. QUINT./B. LU
GENERAL NOTES, PUBLIC AGENCIES AND UTILITIES,
SHEET INDEX, AND LOCATION MAP 2
7 LOCATION 1 (W. WILLOW ST. & DELTA AVE.) BUTTERFLY VALVE REPLACEMENT DETAIL
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.) BUTTERFLY VALVE REPLACEMENT DETAIL
LOCATION 3 (W. SPRING ST. & DELTA AVE.) BUTTERFLY VALVE REPLACEMENT DETAIL
ABBREVIATIONSUTILITY LEGENDS
LEGENDS DESCRIPTION
EXIST. LBUD PIPE
ISOLATED LBUD PIPE
LINE-STOP
VALVE TO BE REPLACED
EXIST. VALVE
EXIST. VALVE TO BE SHUT OFF
FIRE HYDRANT
NO. UTILITY NAME CONTACT NAME PH. NO.
1 OLYMPUS TERMINALS LLC - OIL TONY RAMIREZ 562-480-5996
2 CRIMSON PIPELINE LP DAVID BLAKESLEE 562-585-4114
3 C/OF LONG BEACH ENERGY RES G&O 24 HR EMERGENCY LINE 562-570-2140
4 C/OF LONG BEACH-Storm Drain 24 HR EMERGENCY LINE 562-570-2140
5 C/OF LONG BEACH-TRAFFIC/ST LI 24 HR EMERGENCY LINE 562-570-2140
6 LONG BEACH UTILITIES DEPT - SWR/WTR ANGEL MARQUEZ 562-244-9334
7 MCI (VERIZON BUSINESS) FIBER FIBER SECURITY DEPT 800-624-9675
PLAINS ALL AMERICAN PIPE - OIL PLAINS OPERATIONS 800-987-4737
PARAMOUNT PETRO - GAS ERIC DORN 562-577-1400
PARAMOUNT PETROLEUM CORP MARK DENIS 661-978-1733
SOCALGAS DISTRIBUTION SAN PEDR LEAD DISPATCHER 800-427-8894
MARATHON PIPE LINE - OIL NOE CORDOVA 562-572-3991
UTIL/SPECTRUM BELFLOWR - CATV SPECTRUM DAMAGE ONLY 844-780-6054
UTILIQUEST 4 SCE - METRO WEST SC SC EDISON PERSONNEL 800-611-1911
UTIL 4 SCE TRNS TELEC-ELEC COM TCC 800-655-8844
UTILIQUEST/FRONTIER - TEL/FIB UTILIQUEST DISPATCH 323-795-2654
VCI CONSTR - FIBER OPTIC MELISSA CULMER 909-276-1279
ABBREVIATION DESCRIPTION
COMM COMMUNICATION (FIBER OPTIC)
G GAS
GS GASOLINE
W LONG BEACH WATER
O OIL
OH OVERHEAD
R/W RIGHT-OF-WAY
S SEWER
E SOUTHERN CALIFORNIA EDISON
SD STORM DRAIN
SL STREET LIGHT/CITY LIGHT
T TELEPHONE
TS TRAFFIC SIGNAL
REDUCER
EXIST. BLOW-OFF VALVE
E19 & E 20
CI
DI
RCP
CAST IRON
DUCTILE IRON
REINFORCED CONCRETE PIPE
CIP CAST IRON PIPE
CL CENTER LINE
R/W RIGHT-OF-WAY
CML CEMENT MORTAR LINES
PPC POLYETHYLENE COPOLYMER
FE FLANGED END
ABD ABANDONED
VCP VITRIFIED CLAY PIPE
UTILITIES TO BE REPLACED
EXISTING UTILITIES
17 TRAFFIC CONTROL PLAN
LBUD LONG BEACH UTILITIES DEPARTMENT
BUTTERFLY VALVE
5/11/2023
LOCATION 3
W. SPRING ST. AND DELTA AVE.
SEE SHEET 12 - 15
LOCATION 1
W. WILLOW ST. AND DELTA AVE.
SEE SHEET 4 - 7
LOCATION 2
W. WILLOW ST. AND SANTA FE AVE.
SEE SHEET 8 - 11
DELTA AVE.
SANTA FE AVE.
W
S P
R I N
G
S
T
W
W I L L O
W
S
T
ADRIATIC AVE.
BALTIC AVE.
CASPIAN AVE.
BALTIC AVE.
CASPIAN AVE.
CANAL AVE.
ADRIATIC AVE.
W
C A
N T
O
S
T
W
T
H
S
T
W
C O
L U
M B
I
W
T
H
S
T
W
T
H
S
T
EASY AVE.
W
C A
N T
O
W
T
H
S
T
CALTRANS RIGHT-OF-WAY
FASHION AVE.
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:
CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
1" = 150'
B. LU
OVERALL SITE PLAN
SCALE: 1" = 150'
N
E19 & E 20
INTERSTATE
CALIFORNIA
EXIST. 20" GATE VALVE (E19-WVA-059)
WITH 3" BYPASS GAVE VALVE (E19-WVA-060)
EXIST. 20" GATE VALVE (E19-WVA-062)
WITH 3" BYPASS GATE VALVE (E19-WVA-063)
EXIST. 20" GATE VALVE (E18-WVA-046)
WITH 3" BYPASS GATE VALVE (E18-WVA-047)
EXIST. POWER LINE
ABOVE GROUND
EXIST. PARAMOUNT PETROLEUM, 6" PPC # 3
3'-10" N CL
EXIST. PAAP, 10", IDLE, NITROGEN PURGED
EST. 8'/9' N CL
EXIST. LONG BEACH WATER, 20" CI-CML
10' N CL
EXIST. TESORO LINE 032, 12" CRUDE
~16' N CL
EXIST. TESORO LINE 212, 6" NATURAL GAS
~26' N CL
EXIST. TEL COMM. (VCI CONST.)
EST. LOCATION SHOWN
EXIST. STORM DRAIN, 27" R.C.P.
43' N CL
EXIST. LONG BEACH WATER, 8" DI
10' E CL
EXIST. CRIMSON, 8" NORWALK NO. 1 LINE (IDLE)
12' W CL
EXIST. SO CAL EDISON
EST. 16' FROM RIGHT-OF-WAY
EXIST. STORM DRAIN, 33" R.C.P.
31' N CL
EXIST. LONG BEACH WATER, 8" DI
10' E CL
EXIST. CRIMSON, 8" NORWALK NO. 1 LINE (IDLE)
2' E CL
EXIST. LONG BEACH WATER, 20" CI-CML
7' W CL
EXIST. STORM DRAIN, 24" R.C.P.
18' W CL
EXIST. STORM DRAIN, 24" R.C.P.
18' E CL
EXIST. LONG BEACH WATER, 20" BYPASS
EXIST. STRET LIGHT
EXIST. STREET LIGHT
W
IL
LO
W
S T.
DELTA AVE.
GATE VALVE DEMOLITION PLAN, SHEET 5
BUTTERFLY VALVE REPLACEMENT PLAN, SHEET 6
EXIST. CURB
EXIST. CURB
EXIST. R/W
EXIST. CURB
EXIST. CURB
EXIST. R/W
EXIST. R/W
EXIST. CURB
EXIST. CURB
EXIST. R/W
2'
EXIST. 8" GATE VALVE (E18-WVA-050)
EXIST. 8" GATE VALVE (E18-WVA-058)
16'
26'
31'
40'
3.8'
8'
43'
14' 12'
EXIST. POWER LINE
OVERHEAD
36'
10'
NEW LINE-STOP-104 (20")
NEW LINE-STOP-101 (20")
NEW LINE-STOP-103
(20")
NEW LINE-STOP-102
(20")
A
A
A
A
ABAN. LONG BEACH WATER, 8" DI
12' E CL
ABAN. LONG BEACH WATER, 8" DI
12' E CL
EXIST. 2" BLOW OFF ASSEMBLY3
EXIST. GATE VALVE (E18-WVA-055) 1
EXIST. FIBER OPTIC
EST. LOCATION SHOWN
EXIST. CATCH BASIN
EXIST. CATCH BASIN
1.8'
5.9'
8.3'10'
EXISTING PIPE IS CI AND SHOULD BE REPLACED
WITH DIP UP TO THE SECOND TEE CONNECTIONS
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
FI
LE
N A
M E
: L A
R G
E V
A
LV
E R
E P
LA
C
E M
E N
T( E
O -3
8)
.d w g D
E S
IG
N
B Y
: B . L
U
N/A
MUNIS PROJECT: 6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
SCALE: 1" = 10'
N
1" = 10'
LOCATION 1 (W. WILLOW ST. & DELTA AVE.)
VALVE & PIPE ISOLATION PLAN 4
50'
100'
10'
60'
30'
7'
NOTES:
1. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY
MEASURES TO PROTECT IN PLACE EXIST. UTILITIES
UNLESS OTHERWISE NOTED.
2. ESTIMATED DEWATERING VOLUME FOR WILLOW
STREET AND DELTA AVENUE IS 4,500 GALLONS.
3. CONTRACTOR WILL NOT BE CLOSING OR OPENING
ANY VALVES.
4. CONTRACTOR MUST SUBMIT THEIR DEWATERING
PLAN FOR THE PIPELINE DEWATERING. THE PLAN
MUST INCLUDE THE METHOD OF DECHLORINATION
AND HOW THE CONTRACTOR WILL HAVE A CLOSED
CONDUIT TO DEWATER FROM THE PIPE TO THE
STORM DRAIN.
5. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48
HOURS PRIOR TO ANY EXCAVATION, CONTRACTOR
SHALL CONTACT AND COORDINATE ANY WORK
WITHIN 25 FEET OF ANY PETROLEUM OR GAS
PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES
STANDBY FROM UTILITY OWNER.
DEMOLITION NOTES:
PROTECT IN PLACE.
REMOVE AND DISPOSE OF EXIST. 20" GATE VALVE
AND 3" BYPASS GATE VALVE, WITH 20" DI PIPE PER
SHEET 5.
REMOVE AND DISPOSE OF EXIST. 2" BLOW OFF
ASSEMBLY.
CONSTRUCTION NOTES:
SEE SHEET 16 FOR LINE-STOP DETAIL
A
E19
EXIST. LBUD PIPE
ISOLATED LBUD PIPE
LINE-STOP
VALVE TO BE REPLACED
EXIST. VALVE
EXIST. VALVE TO BE SHUT OFF
FIRE HYDRANT
REDUCER
EXIST. BLOW-OFF VALVE
LEGEND:
DELTA AVE.
W
W I L
L O
W
S
T
EXIST. 20" GATE VALVE (E19-WVA-059)
WITH 3" BYPASS GATE VALVE (E19-WVA-060)
EXIST 20" GATE VALVE (E19-WVA-062)
WITH 3" BYPASS GATE VALVE (E19-WVA-063)
EXIST. LONG BEACH
WATER, 20" CI-CML
EXIST. STORM DRAIN, 24" R.C.P.
EXIST. POWER LINE
OVERHEAD
EXIST. STORM DRAIN, 33" R.C.P.
EXIST. FIBER OPTIC LINE
EXIST. STREET LIGHT
ISOLATION VALVE
EXIST. 20" GATE VALVE (E19-WWA-058)
WITH 3" BYPASS GATE VALVE (E19-WVA-059)
EXIST. LONG BEACH WATER, 8" DI
EXIST. TESORO LINE 212
6" NATURAL GAS
EXIST. TESORO LINE 032
12" CRUDE
EXIST. PAAP, 10", IDLE
NITROGEN PURGED
EXIST. PARAMOUNT PETROLEUM
6" PPC # 3
EXIST. CRIMSON, 8" NORWALK
NO. 1 LINE (IDLE)
EXIST. POWER LINE
OVERHEAD
EXIST. POWER LINE
ABOVE GROUND
EXIST. STREET LIGHT
EXIST. 20" GATE VALVE (E18-WVA-046)
WITH 3" BYPASS GATE VALVE (E18-WVA-047)
ISOLATION VALVE
EXIST. 20" GATE VALVE (E19-WVA-050)
WITH 3" BYPASS GATE VALVE (E18-WVA-051)
EXIST. LONG BEACH
WATER, 20" CI-CML
EXIST. TEL COMM. (VCI CONST.)
EXIST. CURB
EXIST. CURB
7' 12'
10'
2'
12'
3.8'
8'
16'
10'
26'
31' 40'
43'
20'
EXIST. R/W
EXIST. R/W
16'
26'
APPROXIMATE EXCAVATION
LIMITS
APPROXIMATE EXCAVATION
LIMITS
APPROXIMATE EXCAVATION
LIMITS
NEW LINE-STOP-102
3 3
±4' ±4'
12'
12'
12'
12'
±4' ±4'
±4' ±4'
CAP & ABANDONED
THE BLOW OFF ASSEMBLY IN PLACE
EXIST. LONG BEACH WATER, 8" CI
NEW LINE-STOP-103
EXIST. CATCH BASIN
NEW LINE-STOP-101
NEW LINE-STOP-104
APPROXIMATE EXCAVATION
LIMITS
12'
12'
APPROXIMATE EXCAVATION
LIMITS
12'
APPROXIMATE EXCAVATION
LIMITS
12'
12'
12'
APPROXIMATE EXCAVATION
LIMITS
DEMOLITION NOTES:
PROTECT IN PLACE. APPROXIMATE LOCATION BUT WILL BE WITHIN THE LIMITS OF EXCAVATION.
REMOVE AND DISPOSE OF EXIST. 20" GATE VALVE AND 3" BYPASS VALVE.
SAWCUT AND DISPOSE INTERFERING PORTIONS OF EXIST. 20" PIPE (APPROX. 4').
SCALE: 1" = 6'
N
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
3/16" = 1'
LOCATION 1 (W. WILLOW ST & DELTA AVE.)
GATE VALVE DEMOLITION PLAN
E-19
NOTES:
1. CONTRACTOR SHALL PROTECT IN PLACE EXIST. APPURTENANCES AND ALL OTHER EQUIPMENT NOT TO BE REMOVED DURING CONSTRUCTION OPERATION. ANY EQUIPMENT DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR BETTER
THAN THE EXIST. CONDITION.
2. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE CONTRACTOR SHALL BE
RESPONSIBLE FOR DEWATERING THE PIPELINE. THE CONTRACTOR SHALL PUMP OUT REMAINING NUISANCE WATER IN THE PIPE AND DISCHARGE THE WATER TO EXIST. STORM DRAIN CATCH BASINS.
3. ALL EXIST VALVE BOXES ARE ASSUMED FOR BIDDING PURPOSES TO HAVE ASBESTOS CEMENT RISER PIPES. CONTRACTOR SHALL LEGALLY DISPOSE OF ASBESTOS CEMENT PIPE.
4. EXIST. GATE VALVES TO BE REMOVED MAY HAVE CONCRETE ANCHOR BLOCKS UNDER THE VALVE BODY. CONTRACTOR SHALL REMOVE AND DISPOSE OF CONCRETE ANCHOR BLOCK. CONTRACTOR TO ASSUME THAT THE CONCRETE ANCHOR BLOCK IS THE SIZE SHOWN ON
WDS-107.
5. CONTRACTOR WILL NOT BE CLOSING OR OPENING ANY VALVES.
6. CONTRACTOR SHALL ASSUME THIS LOCATION HAS EXISTING THRUST BLOCKS WHICH WILL REQUIRE THEY BE PROTECTED IN PLACE.
7. ALL APPROXIMATE LIMITS OF EXCAVATION SHOWN ARE FOR EXAMPLE ONLY. PRIOR TO DEMOLITION, CONTRACTOR SHALL EXCAVATE THE AREAS OF THE REPLACEMENTS TO DETERMINE EXIST. UTILITIES, LOCATION OF CONNECTION POINTS, EXIST. PIPE OUTSIDE DIAMETERS, AND END CONNECTIONS.
8. FOR EACH OF THE VALVES SHOWN, ALL VALVE CANS ARE NOT SHOWN ON PLANS FOR CLARITY.
9. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48 HOURS PRIOR TO ANY EXCAVATION, CONTRACTOR SHALL CONTACT AND COORDINATE ANY WORK WITHIN 25 FEET OF ANY PETROLEUM OR GAS PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES STANDBY FROM UTILITY
OWNER.
W
W I L
L O
W
S
T
INSTALL 20" BUTTERFLY VALVE
(E19-WVA-138)
INSTALL 20" BUTTERFLY VALVE
(E19-WVA-139)
EXIST. LONG BEACH
WATER, 20" CI-CML
EXIST. STORM DRAIN, 24" R.C.P.
EXIST. POWER LINE
OVERHEAD
EXIST. STORM DRAIN, 33" R.C.P.
EXIST. FIBER OPTIC LINE
EXIST. STREET LIGHT
ISOLATION VALVE
EXIST. 20" GATE VALVE (E19-WWA-058)
WITH 3" BYPASS GATE VALVE (E19-WVA-059)
EXIST. LONG BEACH WATER, 8" DI
EXIST. TESORO LINE 212
6" NATURAL GAS
EXIST. TESORO LINE 032
12" CRUDE
EXIST. PAAP, 10", IDLE
NITROGEN PURGED
EXIST. PARAMOUNT PETROLEUM
6" PPC # 3
EXIST. CRIMSON, 8" NORWALK
NO. 1 LINE (IDLE)
EXIST. POWER LINE
OVERHEAD
EXIST. POWER LINE
ABOVE GROUND
EXIST. STREET LIGHT
INSTALL 20" BUTTERFLY VALVE
(E19-WVA-116)
EXIST. LONG BEACH
WATER, 20" CI-CML
EXIST. TEL COMM. (VCI CONST.)
EXIST. CURB
EXIST. CURB
7' 12'
10'
2'
12'
3.8'
8'
16'
10'
26'
31' 40'
43'
20'
EXIST. R/W
EXIST. R/W
16'
26'
12'
12'
APPROXIMATE EXCAVATION
LIMITS
APPROXIMATE EXCAVATION
LIMITS
EXCAVATION LIMITS
(BLOWOFF CONSTRUCTION)
15'
12'
12'
NEW LINE-STOP-102
±9.5'
SEE SHEET 7
SECTION A
±9.5'
SEE SHEET 7
SECTION B
3 3
±9.5'
SEE SHEET 7
SECTION C
12'
ISOLATION VALVE
EXIST. 20" GATE VALVE (E18-WWA-050)
WITH 3" BYPASS GATE VALVE (E18-WVA-051)
APPROXIMATE EXCAVATION
LIMITS
CAP & ABANDONED
THE BLOW OFF ASSEMBLY IN PLACE
EXIST. LONG BEACH WATER, 8" CI
EXIST. CATCH BASIN
6.6'
6'
NEW LINE-STOP-103
EXIST. LONG BEACH
WATER, 20" CI-CML
EXIST. LONG BEACH
WATER, 20" CI-CML
12'
12'
APPROXIMATE EXCAVATION
LIMITS
12'
12'
APPROXIMATE EXCAVATION
LIMITS
12'
12'
APPROXIMATE EXCAVATION
LIMITS
12'
APPROXIMATE EXCAVATION
LIMITS
12'
NEW LINE-STOP-101
NEW LINE-STOP-104
CONSTRUCTION NOTES:
PROTECT IN PLACE. APPROXIMATE LOCATION BUT WILL BE WITHIN THE LIMITS OF EXCAVATION.
INSTALL OWNER FURNISHED 20" BUTTERFLY VALVE, FE X FE. CONTRACTOR SHALL VERIFY LAY LENGTH WITH THE CITY PRIOR TO ORDERING
SPOOL PIECES.
INSTALL 20" FULLY RESTRAINED FLANGED TRANSITION COUPLING & 20" DI SPOOL, FE X PE. LAY LENGTH TO BE DETERMINED BY CONTRACTOR.
REPLACE EXIST. LONG BEACH WATER 20" CI WITH 20" DI
NOTES:
SCALE: 3/16" = 1'
N
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
3/16" = 1'
LOCATION 1 (W. WILLOW ST. & DELTA AVE.)
BUTTERFLY VALVE REPLACEMENT PLAN
E-19
VALVE INFORMATION TABLE
1. CONTRACTOR SHALL VERIFY LOCATION, DEPTH AND SIZE OF EXIST. WATER MAIN AND
VALVE BEFORE STARTING CONSTRUCTION. THIS POTHOLE DATA SHALL BE SUBMITTED AND
APPROVED PRIOR TO ANY EXCAVATION WORK.
2. CONTRACTOR SHALL REPLACE ALL AC PAVEMENT, CONCRETE SIDEWALK, CONCRETE
APRON, CURB & GUTTER AND VEGETATION IMPACTED DURING CONSTRUCTION.
3. ALL CI AND DI PIPE AND FITTINGS SHALL MIN WALL THICKNESS SHALL BE PER
SPECIFICATIONS.
4. THE CONTRACTOR SHALL CONTACT LBUD AFTER APPROVAL OF ALL SUBMITTALS AND AT
LEAST TWO (2) WEEKS PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
EXISTING UTILITIES UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF THE
CONNECTION POINTS PRIOR TO SUBMITTING SHOP DRAWINGS. THIS POTHOLE DATA SHALL
BE SUBMITTED AND APPROVED PRIOR TO ANY EXCAVATION WORK.
7. THE CONTRACTOR SHALL DISINFECT PIPING PER ANSI/AWWA C651-14. AND SEE SPEC
SECTION 33 13 00 FOR CHLORINATION OR WATER MAINS FOR DISINFECTION.
8. ALL FLANGES SHALL HAVE 316SS NUTS, BOLTS, AND WASHERS.
9. ALL FLANGES SHALL HAVE INSULATING FLANGES WHEN JOINING DIFFERENT PIPE
MATERIALS.
10. UPON COMPLETION OF THE VALVE REPLACEMENT PROJECT, CONTRACTOR SHALL
SCHEDULE A FIELD MEETING WITH LBUD AND OPERATIONS STAFF TO WITNESS PROPER
OPERATION OF ALL INSTALLED VALVES.
11. BYPASS VALVES CONNECTING TO LARGE VALVES BEING REPLACED SHOULD BE REMOVED.
12. PRIOR TO DEMOLITION, CONTRACTOR SHALL EXCAVATE THE AREAS OF THE
REPLACEMENTS TO DETERMINE EXIST. UTILITIES, LOCATION OF CONNECTION POINTS,
EXIST. PIPE OUTSIDE DIAMETERS, AND END CONNECTIONS. EXCAVATION SIZE DETERMINED
BY CONTRACTOR.
13. TRENCH LIMITS ARE SHOWN AS EXAMPLE ONLY. CONTRACTOR IS TO UTILIZE THE
NECESSARY TRENCH LIMITS FOR THE OPERATION PER CONTRACTORS MEANS AND
METHODS.
14. FOR EACH OF THE VALVES SHOWN, ALL VALVE CANS ARE NOT SHOWN ON PLANS FOR
CLARITY.
15. ALL VALVES, FLANGES, COUPLINGS, AND APPURTENANCES SHALL BE FULLY RESTRAINED.
16. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48 HOURS PRIOR TO ANY EXCAVATION,
CONTRACTOR SHALL CONTACT AND COORDINATE ANY WORK WITHIN 25 FEET OF ANY
PETROLEUM OR GAS PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES STANDBY FROM
UTILITY OWNER.
9.5'
20" BUTTERFLY VALVE
4" FIBER OPTIC CABLE PVC PACKAGE
~ 59" PIPE COVER
1" STREET LIGHT
~ 29" PIPE COVER
20" LBUD LINE
~ 72" PIPE COVER
6" NATURAL GAS TESORO LINE 212
~ 32" PIPE COVER
12" CRUDE TESORO LINE 032
~ 35" PIPE COVER
20" BUTTERFLY VALVE
20" LBUD LINE
~ 62" PIPE COVER
8" CRIMSON NORWALK NO. 1 LINE
~ 56" PIPE COVER
9.5' 9.5'
20" LBUD LINE
~ 81" PIPE COVER
8" CRIMSON NORWALK NO. 1 LINE
~ 45" PIPE COVER
1" STREET LIGHT
~ 39" PIPE COVER
20" BUTTERFLY VALVE
LOCATION 1 (W. WILLOW ST. AND DELTA AVE.)
BUTTERFLY VALVE REPLACEMENT DETAIL
SCALE: NTS
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAP770
DATE
DATE
LARGE POTABLE VALVE REPLACEMENT PROJECT
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
D. RYDBERG
WD-52-22
LOCATION 1 (W. WILLOW ST. & DELTA AVE.)
BUTTERFLY VALVE REPLACEMENT DETAIL 7
EXCAVATION DEPTH
BY CONTRACTOR
EXCAVATION DEPTH
BY CONTRACTOR
EXCAVATION DEPTH
BY CONTRACTOR
E-19
9.5' MIN
9.5' MIN
9.5' MIN
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
3 3
20" DI SPOOL (FE X FE)
20" DI SPOOL (FE X FE)
EXIST CI PIPE
EXIST CI PIPE
EXIST CI PIPE
20" DI SPOOL (FE X FE)
SECTION B SECTION C
EXIST CI PIPE
EXIST CI PIPE
EXIST CI PIPE
VALVE REPLACEMEN
WILLOW STREET
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
CONSTRUCTION NOTES:
PROTECT IN PLACE. APPROXIMATE LOCATION BUT WILL BE WITHIN THE LIMITS OF EXCAVATION.
INSTALL 20" BUTTERFLY VALVE, FE X FE, W/TB. TO BE APPROVED BY LONG BEACH UTILITIES. CONTRACTOR SHALL VERIFY LAY LENGTH WITH THE
CITY PRIOR TO ORDERING SPOOL PIECES.
INSTALL 20" FULLY RESTRAINED FLANGED TRANSITION COUPLING & 20" DI SPOOL, FE X PE. LAY LENGTH TO BE DETERMINED BY THE CONTRACTOR.
NOTES:
1. CONTRACTOR SHALL VERIFY LOCATION, DEPTH AND SIZE OF EXIST. WATER MAIN AND VALVE
BEFORE STARTING CONSTRUCTION. THIS POTHOLE DATA SHALL BE SUBMITTED AND APPROVED
PRIOR TO ANY EXCAVATION WORK.
2. CONTRACTOR SHALL REPLACE ALL AC PAVEMENT, CONCRETE SIDEWALK, CONCRETE APRON,
CURB & GUTTER AND VEGETATION IMPACTED DURING CONSTRUCTION.
3. ALL CI AND DI PIPE AND FITTINGS SHALL MIN WALL THICKNESS SHALL BE PER SPECIFICATIONS.
4. THE CONTRACTOR SHALL CONTACT LBUD AT AT LEAST TWO (2) WEEKS PRIOR TO STARTING ANY
CONSTRUCTION ACTIVITY.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
EXISTING UTILITIES UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF THE
CONNECTION POINTS PRIOR TO SUBMITTING SHOP DRAWINGS. THIS POTHOLE DATA SHALL BE
SUBMITTED AND APPROVED PRIOR TO ANY EXCAVATION WORK.
7. THE CONTRACTOR SHALL DISINFECT PIPING PER ANSI/AWWA C651-14. AND SEE SPEC SECTION 33
13 00 FOR CHLORINATION OR WATER MAINS FOR DISINFECTION.
8. ALL FLANGES SHALL HAVE 316SS NUTS, BOLTS, AND WASHERS.
9. ALL FLANGES SHALL HAVE INSULATING FLANGES WHEN JOINING DIFFERENT PIPE MATERIALS.
10. UPON COMPLETION OF THE VALVE REPLACEMENT PROJECT, CONTRACTOR SHALL SCHEDULE A
FIELD MEETING WITH LONG BEACH UTILITIES AND OPERATIONS STAFF TO WITNESS PROPER
OPERATION OF ALL INSTALLED VALVES.
11. BYPASS VALVES CONNECTING TO LARGE VALVES BEING REPLACED SHOULD BE REMOVED.
12. PRIOR TO DEMOLITION, CONTRACTOR SHALL EXCAVATE THE AREAS OF THE REPLACEMENTS TO
DETERMINE EXIST. UTILITIES, LOCATION OF CONNECTION POINTS, EXIST. PIPE OUTSIDE
DIAMETERS, AND END CONNECTIONS. EXCAVATION SIZE DETERMINED BY CONTRACTOR.
13. TRENCH LIMITS ARE SHOWN AS EXAMPLE ONLY. CONTRACTOR IS TO UTILIZE THE NECESSARY
TRENCH LIMITS FOR THE OPERATION PER CONTRACTORS MEANS AND METHODS.
14. FOR EACH OF THE VALVES SHOWN, ALL VALVE CANS ARE NOT SHOWN ON PLANS FOR CLARITY.
15. ALL VALVES, FLANGES, COUPLINGS, AND APPURTENANCES SHALL BE FULLY RESTRAINED.
16. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48 HOURS PRIOR TO ANY EXCAVATION,
CONTRACTOR SHALL CONTACT AND COORDINATE ANY WORK WITHIN 25 FEET OF ANY
PETROLEUM OR GAS PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES STANDBY FROM UTILITY
OWNER.
±9.5'
±9.5'
±9.5'
STREET PAVEMENT
THICKNESS TO BE
VERIFIED BY
CONTRACTOR
STREET PAVEMENT
THICKNESS TO BE
VERIFIED BY
CONTRACTOR
STREET PAVEMENT
THICKNESS TO BE
VERIFIED BY
CONTRACTOR
SECTION A
EXIST. LONG BEACH 4" BYPASS
EXIST. LONG BEACH WATER 12" AR-RT
19' E CL
EXIST. STORM DRAIN, 15" R.C.P.
~ 63'/64'' N CL
EXIST. LONG BEACH GAS 12" LINE
32' E CL
EXIST. ELEC S.C.E.
~18.5' W CL
EXIST. CHEMOIL (OLYMPUS) 20" PIPELINE
35' W CL
EXIST. ELEC. S.C.E.
~18' CL
EXIST. CRIMSON 8" LINE (ABD)
11' W CL
EXIST. TEL
18' W CL
EXIST. LONG BEACH WATER 6" CI
~ 37' S CL
EXIST. TESORO (MARATHON) LINE 212, NATURAL GAS 6"
~ 6' N CL
EXIST. LONG BEACH WATER 20" CI-CML
10' N CL
EXIST. TESORO (MARATHON) LINE 032, 12" CRUDE
~ 15' N CL
EXIST. LONG BEACH GAS 4"
32' N CL
EXIST. STORM DRAIN 21" RCP
43' N CL
EXIST. FIBER OPTIC
EST. LOCATION SHOWN
EXIST. STREET LIGHT
EXIST. LONG BEACH GAS 4"
28' N CL
EXIST. TESORO (MARATHON) LINE 212, NATURAL GAS 6"
~ 26.5' N CL
EXIST. TESORO (MARATHON) LINE 032, CRUDE 12"
~ 22' N CL
EXIST. CRIMSON 8"
12' N CL
EXIST. PAAP, 10", IDLE, NITROGEN PURGED
8'/9' N CL
EXIST. PARAMOUNT PETROLEUM 6" PPC
3'-10" N CL
EXIST. TESORO L71R, 12" CRUDE
EST. LOCATION SHOWN
EXIST. TESORO L79R, 12" CRUDE
EST. LOCATION SHOWN
EXIST. COMM. G.T.C.
~ 45.5' S CL
EXIST. CRIMSON 8" LINE (ACTIVE)
27' W CL
EXIST. 20" GATE VALVE (E19-WVA-005)
WITH 3" BYPASS GATE VALVE (E19-WVA-006)
GATE VALVE DEMOLITION PLAN, SHEET 9
BUTTERFLY VALVE REPLACEMENT PLAN, SHEET 10
EXIST. CHEMOIL (OLYMPUS) 20" PIPELINE
EST. LOCATION SHOWN
EXIST. STREET LIGHT
EXIST. POWER
OVERHEAD
EXIST. MCI
EST. LOCATION SHOWN
EXIST. LONG BEACH WATER, 6" AC
36' W CL
WILLOW ST.
EXIST. PAINTED MEDIAN STRIP
EXIST. PAINTED MEDIAN STRIP
EXIST. R/W
EXIST. CURB
EXIST. CURB
EXIST. R/W
EXIST. R/W
EXIST. CURB
EXIST. CURB
EXIST. R/W
28'
26.5'
22'
12'
8'
3.8'
37.5' 40' 39.2'
24' 27'
40'
41'
46'
11'
18.5'
27'
36'
19'
32'
10' 15'
EXIST. 12" GATE VALVE (E18-WVA-040)
EXIST. 12" GATE VALVE (E19-WVA-003)
EXIST. 6" GATE VALVE (E19-WVA-007)
EXIST. 12" GATE VALVE (E19-WVA-006)
6'
18'
18.5'
35'
ABAN. LONG BEACH WATER 12"
ABAN. LONG BEACH WATER 12" AR-RT
10' E CL
10'
EXIST. 2" BLOW
OFF ASSEMBLY
EXIST. 6" GATE VALVE (E18-WVA-041)
NEW LINE-STOP-201
(20")
A
S A
N T
A
F
E
A
V E
SEE NOTE 3
SEE NOTE 3
10'
EXIST. CATCH BASIN
EXIST. CATCH BASIN
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
1" = 10'
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.)
VALVE & PIPE ISOLATION PLAN
N
SCALE: 1" = 10'
100'
50'
100'
50'
30'
36'
19'
NOTES:
1. CONTRACTOR SHALL TAKE ALL
PRECAUTIONARY MEASURES TO PROTECT IN
PLACE EXIST. UTILITIES UNLESS OTHERWISE
NOTED.
2. ESTIMATED DEWATERING VOLUME FOR
WILLOW STREET AND SANTA FE AVENUE IS
3,100 GALLONS.
3. CONTRACTOR SHALL ASSUME THIS
LOCATION HAS EXISTING THRUST BLOCKS
WHICH REQUIRE THEY BE PROTECTED IN
PLACE.
4. CONTRACTOR WILL NOT BE CLOSING OR
OPENING ANY VALVES.
5. CONTRACTOR MUST SUBMIT THEIR
DEWATERING PLAN FOR THE PIPELINE
DEWATERING. THE PLAN MUST INCLUDE THE
METHOD OF DECHLORINATION AND HOW THE
CONTRACTOR WILL HAVE A CLOSED
CONDUIT TO DEWATER FROM THE PIPE TO
THE STORM DRAIN.
6. AFTER THE CONTRACTOR NOTIFIES DIG
ALERT 48 HOURS PRIOR TO ANY
EXCAVATION, CONTRACTOR SHALL CONTACT
AND COORDINATE ANY WORK WITHIN 25
FEET OF ANY PETROLEUM OR GAS
PIPELINES. ALL WORK WITHIN 25 FEET
REQUIRES STANDBY FROM UTILITY OWNER.
7. CONTRACTOR SHALL NOTE THAT A
MORATORIUM HAS BEEN ISSUED ON SANTA
FE AVE. NORTH OF WILLOW ST. NO
EXCAVATION IS PERMITTED.
DEMOLITION NOTES:
PROTECT IN PLACE.
REMOVE AND DISPOSE OF EXIST. 20" GATE
VALVE AND 3" BYPASS GATE VALVE, WITH 20"
DI PIPE PER SHEET 9.
CAP AND ABANDONED IN PLACE.
REMOVE AND DISPOSE OF EXIST. 12" GATE
VALVE AND 3" BYPASS GATE VALVE, WITH 12"
DI PIPE PER SHEET 9.
CONSTRUCTION NOTES:
SEE SHEET 16 FOR LINE-STOP DETAIL
A
E-19
43'
EXIST 12" GATE VALVE (E19-WVA-117)
EXIST. LBUD PIPE
ISOLATED LBUD PIPE
LINE-STOP
VALVE TO BE REPLACED
EXIST. VALVE
EXIST. VALVE TO BE SHUT OFF
FIRE HYDRANT
REDUCER
EXIST. BLOW-OFF VALVE
LEGEND:
W. WILLOW ST.
A
N T
A
F
E
A
V E
EXIST. LONG BEACH 4" BYPASS
EXIST. LONG BEACH GAS 12" LINE
EXIST. LONG BEACH WATER 20" CI-CML
EXIST. 10" CRUDE
EXIST. LONG BEACH GAS 4"
EXIST. STREET LIGHT
EXIST. 20" GATE VALVE (E18-WVA-040)
WITH 3" BYPASS GATE VALVE (E18-WVA-041)
EXIST. PAAP, 10", IDLE, NITROGEN PURGED
EXIST. PARAMOUNT PETROLEUM 6" PPC
LINE-STOP-201
EXIST. MCI
EXIST. PAINTED MEDIAN STRIP
3.8'
6'
8'
15'
22'
24'
28'
37.5'
11'
18.5'
10'
25.4'
32'
45.7'
10'15' 8'
22'
ISOLATION VALVE
EXIST. 12" GATE VALVE (E19-WWA-006)
EXIST. STREET LIGHT
1EXIST. TESORO (MARATHON) LINE 212, NATURAL GAS 6"
EXIST. TRAFFIC SIGNAL
8'
EXCAVATION LIMITS
(BLOWOFF CONSTRUCTION)
±2' ±2'
8'
EXIST. THRUST BLOCK
EXIST. THRUST BLOCK
EXIST. CATCH BASIN
N
SCALE: 3/16" = 1'
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
3/16" = 1'
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.)
GATE VALVE DEMOLITION PLAN
NOTES:
1. CONTRACTOR SHALL PROTECT IN PLACE EXIST. APPURTENANCES AND ALL OTHER EQUIPMENT NOT TO BE REMOVED DURING CONSTRUCTION OPERATION. ANY
EQUIPMENT DAMAGED BY THE CONTRACTOR SHALL BE REPLACED TO THE CONDITION EQUAL TO OR BETTER THAN THE EXIST. CONDITION.
2. CONTRACTOR SHALL SUBMIT TO LBUD A WRITTEN REQUEST TO DEWATER THE PIPELINE TWO (2) WEEKS IN ADVANCE OF THE VALVE REPLACEMENT. LBUD WILL BE
RESPONSIBLE FOR CLOSING ALL THE DESIGNATED SHUT-DOWN VALVES AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING THE PIPELINE. THE
CONTRACTOR SHALL PUMP OUT REMAINING NUISANCE WATER IN THE PIPE AND DISCHARGE THE WATER TO EXIST. STORM DRAIN CATCH BASINS.
3. ALL EXIST VALVE BOXES ARE ASSUMED FOR BIDDING PURPOSES TO HAVE ASBESTOS CEMENT RISER PIPES. CONTRACTOR SHALL LEGALLY DISPOSE OF ASBESTOS
CEMENT PIPE.
4. EXIST. GATE VALVES TO BE REMOVED MAY HAVE CONCRETE ANCHOR BLOCKS UNDER THE VALVE BODY. CONTRACTOR SHALL REMOVE AND DISPOSE OF CONCRETE
ANCHOR BLOCK. CONTRACTOR TO ASSUME THAT THE CONCRETE ANCHOR BLOCK IS THE SIZE SHOWN ON WDS-107.
5. CONTRACTOR WILL NOT BE CLOSING OR OPENING ANY VALVES.
6. CONTRACTOR SHALL ASSUME THIS LOCATION HAS EXISTING THRUST BLOCKS WHICH WILL REQUIRE THEY BE PROTECTED IN PLACE.
7. ALL APPROXIMATE LIMITS OF EXCAVATION SHOWN ARE FOR EXAMPLE ONLY. PRIOR TO DEMOLITION, CONTRACTOR SHALL EXCAVATE THE AREAS OF THE REPLACEMENTS
TO DETERMINE EXIST. UTILITIES, LOCATION OF CONNECTION POINTS, EXIST. PIPE OUTSIDE DIAMETERS, AND END CONNECTIONS.
8. FOR EACH OF THE VALVES SHOWN, ALL VALVE CANS ARE NOT SHOWN ON PLANS FOR CLARITY.
9. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48 HOURS PRIOR TO ANY EXCAVATION, CONTRACTOR SHALL CONTACT AND COORDINATE ANY WORK WITHIN 25 FEET OF
ANY PETROLEUM OR GAS PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES STANDBY FROM UTILITY OWNER.
10. CONTRACTOR SHALL NOTE THAT A MORATORIUM HAS BEEN ISSUED ON SANTA FE AVE. NORTH OF WILLOW ST. NO EXCAVATION IS PERMITTED.
DEMOLITION NOTES:
PROTECT IN PLACE.
REMOVE AND DISPOSE OF EXIST. 20" GATE VALVE AND 3" BYPASS VALVE.
SAWCUT AND DISPOSE INTERFERING PORTIONS OF EXIST. 20" PIPE (APPROX. 4').
REMOVE AND DISPOSE OF EXIST. LONG BEACH WATER 12" GATE VALVE.
E-19
5/112023
W. WILLOW ST.
EXIST. LONG BEACH 4" BYPASS
EXIST. LONG BEACH GAS 12" LINE
EXIST. LONG BEACH WATER 20" CI-CML
EXIST. 12" CRUDE
EXIST. LONG BEACH GAS 4"
EXIST. STREET LIGHT
INSTALL 20" BUTTERFLY VALVE
(E18-WVA-117)
EXIST. PAAP, 10", IDLE, NITROGEN PURGED
EXIST. PARAMOUNT PETROLEUM 6" PPC
LINE-STOP-201
EXIST. MCI
EXIST. PAINTED MEDIAN STRIP
3.8'
6'
8'
15'
22'
24'
28'
37.5'
11'
18.5'
10'
25.4'
32'
45.7'
10'15' 8'
22'
REPLACE EXIST. 12" GATE VALVE
(E19-WVA-140)
EXIST. STREET LIGHT
1EXIST. TESORO (MARATHON) LINE 212, NATURAL GAS 6"
EXIST. TRAFFIC SIGNAL
APPROXIMATE EXCAVATION
LIMITS
±9.5'
SEE SHEET 11
SECTION A
EXIST. THRUST BLOCK
EXIST. THRUST BLOCK
8'
8'
EXIST. CATCH BASIN
S A
N T
A
F
E
A
V E
N
SCALE: 3/16" = 1'
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTION
DATE
REV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT:
WAP770
DATE
DATE
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
LARGE POTABLE VALVE REPLACEMENT PROJECT
WILLOW STREET
F I
M
E
L A
R G
E V
A L V
E R
E P
L A
C E
M E
N T
E
O d
S
I G
N
B
Y
B
L U
N/A
MUNIS PROJECT:
6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
WD-52-22
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
BC
BC
JH/RH
3/16" = 1'
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.)
BUTTERFLY VALVE REPLACEMENT PLAN
CONSTRUCTION NOTES:
PROTECT IN PLACE. APPROXIMATE LOCATION BUT WILL BE
WITHIN THE LIMITS OF EXCAVATION.
INSTALL 20" BUTTERFLY VALVE, FE X FE. TO BE APPROVED BY
LBUD. CONTRACTOR SHALL VERIFY LAY LENGTH WITH THE CITY
PRIOR TO ORDERING SPOOL PIECES.
INSTALL 20" FULLY RESTRAINED FLANGED TRANSITION
COUPLING & 20" DI SPOOL, FE X PE. LAY LENGTH TO BE
DETERMINED BY CONTRACTOR.
NOTES:
E-19
VALVE INFORMATION TABLE
1. CONTRACTOR SHALL VERIFY LOCATION, DEPTH AND SIZE OF EXIST. WATER MAIN AND
VALVE BEFORE STARTING CONSTRUCTION. THIS POTHOLE DATA SHALL BE SUBMITTED
AND APPROVED PRIOR TO ANY EXCAVATION WORK.
2. CONTRACTOR SHALL REPLACE ALL AC PAVEMENT, CONCRETE SIDEWALK, CONCRETE
APRON, CURB & GUTTER AND VEGETATION IMPACTED DURING CONSTRUCTION.
3. ALL CI AND DI PIPE AND FITTINGS SHALL MIN WALL THICKNESS SHALL BE PER
SPECIFICATIONS.
4. THE CONTRACTOR SHALL CONTACT LBUD AFTER APPROVAL OF ALL SUBMITTALS AND
AT LEAST TWO (2) WEEKS PRIOR TO STARTING ANY CONSTRUCTION ACTIVITY.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN
PLACE EXISTING UTILITIES UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF
THE CONNECTION POINTS PRIOR TO SUBMITTING SHOP DRAWINGS. THIS POTHOLE
DATA SHALL BE SUBMITTED AND APPROVED PRIOR TO ANY EXCAVATION WORK.
7. THE CONTRACTOR SHALL DISINFECT PIPING PER ANSI/AWWA C651-14. AND SEE SPEC
SECTION 33 13 00 FOR CHLORINATION OR WATER MAINS FOR DISINFECTION.
8. ALL FLANGES SHALL HAVE 316SS NUTS, BOLTS, AND WASHERS.
9. ALL FLANGES SHALL HAVE INSULATING FLANGES WHEN JOINING DIFFERENT PIPE
MATERIALS.
10. UPON COMPLETION OF THE VALVE REPLACEMENT PROJECT, CONTRACTOR SHALL
SCHEDULE A FIELD MEETING WITH LBUD AND OPERATIONS STAFF TO WITNESS PROPER
OPERATION OF ALL INSTALLED VALVES.
11. BYPASS VALVES CONNECTING TO LARGE VALVES BEING REPLACED SHOULD BE
REMOVED.
12. PRIOR TO DEMOLITION, CONTRACTOR SHALL EXCAVATE THE AREAS OF THE
REPLACEMENTS TO DETERMINE EXIST. UTILITIES, LOCATION OF CONNECTION POINTS,
EXIST. PIPE OUTSIDE DIAMETERS, AND END CONNECTIONS. EXCAVATION SIZE
DETERMINED BY CONTRACTOR.
13. TRENCH LIMITS ARE SHOWN AS EXAMPLE ONLY. CONTRACTOR IS TO UTILIZE THE
NECESSARY TRENCH LIMITS FOR THE OPERATION PER CONTRACTORS MEANS AND
METHODS.
14. FOR EACH OF THE VALVES SHOWN, ALL VALVE CANS ARE NOT SHOWN ON PLANS FOR
CLARITY.
15. ALL VALVES, FLANGES, COUPLINGS, AND APPURTENANCES SHALL BE FULLY
RESTRAINED.
16. AFTER THE CONTRACTOR NOTIFIES DIG ALERT 48 HOURS PRIOR TO ANY EXCAVATION,
CONTRACTOR SHALL CONTACT AND COORDINATE ANY WORK WITHIN 25 FEET OF ANY
PETROLEUM OR GAS PIPELINES. ALL WORK WITHIN 25 FEET REQUIRES STANDBY FROM
UTILITY OWNER.
17. CONTRACTOR SHALL NOTE THAT A MORATORIUM HAS BEEN ISSUED ON SANTA FE AVE.
NORTH OF WILLOW ST. NO EXCAVATION IS PERMITTED.
9.5'
20" BUTTERFLY VALVE
8" CRIMSON NORWALK NO. 1 LINE4" PVC PACKAGE
~ 26" PIPE COVER
6" ABANDONED WATER LINE
~ 41" PIPE COVER
1 1
20" LBUD LINE
~ 77.5" PIPE COVER
THRUST BLOCK 1
THRUST BLOCK1
DIRECTOR OF ENGINEERING / CHIEF ENGINEER
MANAGER OF ENGINEERING
APPROVED
RECOMMENDED
DEPARTMENT DATE
BY CK'D.
CITY ENG.
VERIZON
EDISON CO.
LB ENERGY
FIRE
INPUT BY
AS-BUILT BY
POSTED GIS
CONSTRUCTED BY
GIS TILE
SPEC. NO
SECTION MAP
SERVICE ATLAS PAGE
DRAWN BY
DATE
DATE
CORRECTED BY
DATE
DATE
DATE
DATE
DATE __/__/__
VARIOUS
DESCRIPTIONDATEREV. SHEET OF 16 SHEETS
EO-3598
DRAWING / FILE NUMBER:
FAMIS PROJECT: WAP770
DATE
DATE
LARGE POTABLE VALVE REPLACEMENT PROJECT
FI
LE
N
AM
E:
M c_ dw g D
ES
IG
N B
Y:
N/A
MUNIS PROJECT: 6002010008
PLANS PREPARED BY:CALL TOLL FREE
TWO WORKING
DAYS BEFORE YOU
DIG
CONTRACTOR SHALL NOTIFY
UNDERGROUND SERVICE ALERT A
MINIMUM OF 48 HOURS PRIOR TO
BEGINNING ANY CONSTRUCTION WORK.
D. RYDBERG
WD-52-22
3/8" = 1'B. LU
LOCATION 2 (W. WILLOW ST. & SANTA FE AVE.)
BUTTERFLY VALVE REPLACEMENT DETAIL 11
LOCATION 2 (W. WILLOW ST. AND SANTA FE AVE.)
BUTTERFLY VALVE REPLACEMENT DETAIL
SCALE: NTS
EXCAVATION DEPTH BY CONTRACTOR
E-19
PLANS PREPARED BY:
43410 Business Park Drive Temecula, California 92590
(951) 253-3331 www.Ardurra.com
SECTION A
5.5'
EXIST CI PIPE
20" DI SPOOL (FE X FE)
EXIST CI PIPE
VALVE REPLACEMEN
WILLOW STREET
CHRISTOPHER J. GARNER
GENERAL MANAGER
LONG BEACH UTILITIES DEPARTMENT
CONSTRUCTION NOTES:
PROTECT IN PLACE. APPROXIMATE LOCATION BUT WILL BE WITHIN THE LIMITS OF EXCAVATION.
INSTALL 20" BUTTERFLY VALVE, FE X FE, W/TB. TO BE APPROVED BY LONG BEACH UTILITIES. CONTRACTOR SHALL VERIFY LAY LENGTH WITH THE
CITY PRIOR TO ORDERING SPOOL PIECES.
INSTALL 20" FULLY RESTRAINED FLANGED TRANSITION COUPLING & 20" DI SPOOL, FE X PE. LAY LENGTH TO BE DETERMINED BY THE CONTRACTOR.
NOTES:
1. CONTRACTOR SHALL VERIFY LOCATION, DEPTH AND SIZE OF EXIST. WATER MAIN AND VALVE
BEFORE STARTING CONSTRUCTION. THIS POTHOLE DATA SHALL BE SUBMITTED AND APPROVED
PRIOR TO ANY EXCAVATION WORK.
2. CONTRACTOR SHALL REPLACE ALL AC PAVEMENT, CONCRETE SIDEWALK, CONCRETE APRON,
CURB & GUTTER AND VEGETATION IMPACTED DURING CONSTRUCTION.
3. ALL CI AND DI PIPE AND FITTINGS SHALL MIN WALL THICKNESS SHALL BE PER SPECIFICATIONS.
4. THE CONTRACTOR SHALL CONTACT LBUD AT AT LEAST TWO (2) WEEKS PRIOR TO STARTING ANY
CONSTRUCTION ACTIVITY.
5. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT IN PLACE
EXISTING UTILITIES UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATION OF THE