017200 Project Record Documents_Single Prime.pdf

PDF 14 KB Posted

Attached to
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
Solicitation number
36C24420R0075
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

This document outlines project record requirements for construction of a new parking garage at the Wilkes-Barre VA Medical Center in Pennsylvania. The project involves providing all labor, materials, tools and equipment to construct a new parking structure to accommodate approximately 435 vehicles according to the drawings and specifications. Contractors must maintain accurate record documents throughout the project and submit marked-up drawings and samples at substantial completion for the owner's records. Relatedly, solicitation number 36C24420R0075 seeks offers for the parking structure project valued between $10-20 million. The procurement is set aside for verified service-disabled veteran-owned small businesses and uses a tiered evaluation process including large businesses. Offerors must price proposals in whole dollars and the contractor will be responsible for correct worker classification and wage compliance.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
015000TempFacilitiesControls.pdf PDF
084113 Aluminum Storefront Systems.pdf PDF
097753 Living Wall System.pdf PDF
074515 Composite Wall Panel.pdf PDF
VMAC_Sketch_SKE-1.pdf PDF
S02 Solicitation 36C24420R0075 AMD 0001.pdf PDF
P03 JA Tyco SimplexGrinnell.pdf PDF
P03 JA Johnson Controls.pdf PDF
36C24420R0075_4.docx DOCX document
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
221300.pdf PDF
220523.pdf PDF
210800.pdf PDF
210512.pdf PDF
111200 Parking Control Equipment.pdf PDF
099600 High Performance Coatings.pdf PDF
079020 Garage Waterproofing Systems.tha.pdf PDF
078410 Through Penetration Firestop Systems.pdf PDF
071113 Bituminous Dampproofing.pdf PDF
061000 Rough Carpentry.pdf PDF
055000 Metal Fabrications.pdf PDF
051200 Structural Steel Framing.pdf PDF
034500 Precast Architectural Concrete.pdf PDF
017900 Warranties_Single Prime.pdf PDF
017823 Operation and Maintenance Data_Single Prime.pdf PDF
015000 Temporary Facilities _ Controls_Single Prime.pdf PDF
014535.docx DOCX document
013100 Project Coordination_Single Prime.pdf PDF
012800 Field Engineering_Single Prime.pdf PDF
012600 Modification Procedures_Single Prime.pdf PDF
000000 Table of Contents_Single Prime 02.docx DOCX document
Arch Dwg 11-16.pdf PDF
S02 Dwg C2-E2.pdf PDF
S02 Parking Structure List of Dwgs.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
334000 Storm Sewer Utilities.pdf PDF
316326 Drilled Caissons.pdf PDF
312319 Dewatering.pdf PDF
280526.pdf PDF
264313.pdf PDF
280500.pdf PDF
260533.pdf PDF
260519.pdf PDF
260511.pdf PDF
230711.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PARKING GARAGE PROJECT NUMBER 693-222

DEPARTMENT OF VETERANS AFFAIRS

WILKES-BARRE, PENNSYLVANIA

017200 - 1

SECTION 017200 - PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative and procedural requirements for Project Record Documents.

B. Project Record Documents required include the following:

1. Copies of Record Drawings

2. Record Samples

C. Related Sections: The following Sections contain requirements that relate to this Section:

1. Division 1 Section "Submittals" specifies general requirements for preparing and submitting Project Record Documents

2. Division 1 Section “Operation and Maintenance Data” specifies requirements regarding submittal of operation and maintenance manuals.

3. Division 1 Section "Contract Closeout" specifies general closeout requirements.

4. Divisions 2 through 33 Sections for specific Project Record Document requirements.

D. Maintenance of Documents and Samples: Store record documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition. Make documents and samples available at all times for the Architect's inspections.

1.3 RECORD DRAWINGS

A. Markup Procedures: During construction, maintain a set of black-line white prints of Contract Drawings and Shop Drawings for Project Record Document purposes. Do not use record documents for construction purposes. Protect record documents from deterioration and loss in a secure, fire-resistant location. Provide access to record documents for the Architect's reference during normal working hours.

017200 - 2

1. Mark these Drawings to show the actual installation where the installation varies from the installation shown originally. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.

Items required to be marked include, but are not limited to, the following:

a. Dimensional changes to the Drawings

b. Revisions to details shown on the Drawings

c. Depths of foundations below the first floor

d. Locations and depths of underground utilities

e. Revisions to routing of piping and conduits

f. Revisions to electrical circuitry

g. Actual equipment locations

h. Duct size and routing

i. Locations of concealed internal utilities

j. Changes made by Change Order or Construction Change Directive

k. Changes made following the Architect's written orders

l. Details not on the original Contract Drawings

2. Mark record prints of Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. Where Shop Drawings are marked, show cross-reference on Contract Drawings location.

3. Mark record sets with red erasable colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

4. Mark important additional information that was either shown schematically or omitted from original Drawings.

5. Note Construction Change Directive numbers, alternate numbers, change-order numbers, and similar identification.

B. Responsibility for Markup: The Contractor shall prepare the record drawings.

1. Accurately record information in an understandable drawing technique.

2. Record data as soon as possible after obtaining it. Record and check the markup prior to enclosing concealed installations.

3. At the time of Substantial Completion, submit record drawings to the Architect for the Owner's records. Organize the drawings into sets and bind and label the sets for the Owner's continued use.

C. Copies and Distribution: Print 3 black-line prints of each drawing, whether or not changes and additional information were recorded. Organize the copies into manageable sets. Bind each set with durable-paper cover sheets. Include appropriate identification, including titles, dates, and other information on the cover sheets.

1. Organize and bind the original marked-up set of prints that were maintained during the construction period in the same manner.

2. Organize print sets. Place these sets in durable tube-type drawing containers with end caps. Mark the end cap of each container with suitable identification.

3. Submit the marked-up record set and three (3) copy sets to the Architect for the Owner's records; the Architect will retain one (1) copy set.

017200 - 3

1.4 RECORD SAMPLE SUBMITTAL

A. Immediately prior to the date of Substantial Completion, meet with the Owner at the Project site to determine which of the samples maintained during the construction period shall be transmitted to the Owner for record purposes. Comply with the Architect's instructions for packaging, identification marking, and delivery to the Owner's sample storage space. Dispose of other Samples in a manner specified for disposing surplus and waste materials.

1.5 MISCELLANEOUS RECORD SUBMITTALS

A. Refer to Individual Specification Sections in Divisions 2 through 33 for additional record-keeping requirements and submittals in connection with various construction activities.

Immediately prior to Substantial Completion, complete miscellaneous records and place in good order, properly identified and bound or filed, ready for use and reference. Submit to the Architect for the Owner's records.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 RECORDING

A. Post changes and modifications to the Documents as they occur. Do not wait until the end of the Project.

END OF SECTION 017200