0171-0519-0171-0520 As Builts.zip.crdownload

CRDOWNLOAD file 227 MB Posted

Attached to
SPMO of Bridge Decks in Various Towns in District 1
Solicitation number
0171-0519/0171-520
Issued by
Hartford County, Sherman CDP, Connecticut

About this file

This file is an "As Builts" documentation package related to the Connecticut Department of Transportation's Surface Preservation, Maintenance, and Operations (SPMO) of Bridge Decks project in District 1 (Rocky Hill), covering State Project Numbers 0171-0519 and 0171-0520. The project involves bridge joint membrane repairs classified under work code 19A across multiple municipalities within District 1. Sealed electronic bids are required through the Bid Express website (bidx.com), with bid opening scheduled for Wednesday, March 4, 2026, at 2:00 p.m. Prequalification with the Connecticut Department of Transportation is mandatory, and bidders must submit a completed Bid Proposal Request Form (Part C) to obtain the official electronic bid proposal form. Pre-bid questions must be submitted through the CTDOT Pre-Bid Q and A Website (contractsqanda.dot.ct.gov) by 9:00 a.m. on Monday, March 2, 2026. No pre-bid conference or site visit is required. Bidders must submit a bid bond equal to at least 30% of their bid amount prior to bid opening via email to dotbid@ct.gov. Paper bids will not be accepted.

The project is estimated at a total value between $15,000,000 and $19,999,999 and is funded through Federal Highway Administration funding (F.A.P. No. 000T(638) and 0913(189)) combined with state funding. All bidders must comply with prevailing wage rates established by the Connecticut State Labor Commissioner and submit a Contract Wage Certification Form before contract award. No specific Disadvantaged Business Enterprise (DBE) or Small Business Enterprise (SBE) set-aside percentages have been established; however, DBE and SBE commitment documentation must be submitted within five calendar days after bid opening if applicable. DBE Regular Dealers are eligible to receive 60% credit for material and supply costs, while DBE Distributors are eligible to receive 40% credit. The apparent low bidder must file the Gift and Campaign Contribution Certification (OPM Form 1) prior to contract award. The Connecticut Transportation Commissioner must provide written consent before any bid withdrawal within sixty days of bid opening. Upon award notification, contractors are allowed sixty days for the Department to execute the written contract and process required documentation, and principal contractors remain subject to Department of Motor Vehicles motor carrier review.

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .