012300_FL-ALTERNATES.pdf
PDF 48 KB Posted
- Solicitation number
- S124834-vCurrent
- Issued by
- Hampden County, Massachusetts
About this file
This document is a section from the specifications for the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. It outlines the alternate bid items that contractors can propose in addition to the base bid work. The alternates include replacing the roofing system, replacing doors and windows, facade repairs, and boiler plant replacement. For each alternate, the base bid scope of work is described, and the additional work to be performed under the alternate is specified. The project is managed by the Massachusetts Department of Conservation and Recreation.
The document provides details on the procedures for submitting and executing the accepted alternates. It states that the cost or credit for each alternate is the net addition to or deduction from the Contract Sum, and no other adjustments are made to the Contract Sum. The schedule of alternates is provided at the end of the section, referencing the applicable specification sections for the required materials and installation.
View the file
Other files
Show 40 more
Latest 50 of 185 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11
10090 ALTERNATES 012300 - 1
SECTION 012300
ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if
Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the
Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternate into the Work. No other adjustments are made to the
Contract Sum.
1.4 PROCEDURES
A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985101
CHICOPEE, MASSACHUSETTS ISSUED FOR BID - 05/20/11
10090 ALTERNATES 012300 - 2
D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. 1: Roof Replacement.
1. Base Bid: Roofing work limited to select and isolated cutting and patching as required to support plumbing, HVAC and electrical work.
2. Alternate: In addition to base bid Work, replace roofing system in its’ entirety, including hazardous materials abatement / considerations and roof drain replacement.
B. Alternate No. 2: Door and Window Replacement.
1. Base Bid: Replace the front entry door and storefront systems.
2. Alternate: In addition to base bid Work, replace window systems and the back door systems, including hazardous materials abatement / considerations.
C. Alternate No. 3: Façade Repairs.
1. Base Bid: Select masonry infill at locations indicated on the Drawings and per Section
04 20 00 “Unit Masonry.”
2. Alternate: In addition to base bid Work, repair of the exterior brick façade and window sills per:
a. Section 01 22 00 “Unit Prices.”
b. Section 04 01 20 “Maintenance of Unit Masonry.”
c. Section 04 14 00 “Maintenance of Stone Assemblies.”
D. Alternate No. 4: Boiler Plant Replacement.
1. Base Bid: Existing boiler plant remains in service.
2. Alternate: Replace boiler plant and related systems in indicated on the Drawings and by
Division 22, 23 and 26 Sections.
END OF SECTION 012300