About this file

This is a surveillance and monitoring plan drawing showing the layout of instrumentation and monitoring equipment for the C-11 Impoundment and Mitigation Area A project in Broward County, Florida. The drawing includes detailed plans for survey settlement markers, vibrating wire pressure sensors, and manhole locations along various levees, canals and embankments.

The plan shows specific engineering details including L-511, L-512, and L-514 levees with 14-foot crest widths at elevation 7.3 feet, C-511 and C-512 canals, D-511 embankment with bottom elevation -2.5 feet, and instrumentation cross-sections. The drawing includes station markings at regular intervals, a key plan showing the project location relative to US-27 and local roads, and general notes specifying that survey settlement markers must be placed every 250 feet along embankment centerlines and vibrating wire pressure sensors must be installed at specific manhole invert elevations to monitor seepage. The drawing is part of Contract 2 documentation for the Comprehensive Everglades Restoration Plan.

View the file

Other files

File Type Posted
01_DRAFT_CNT2_Plans_4Civil_Part14.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part24.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part9.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part15.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part7.pdf PDF
01_DRAFT_CNT2_Plans_6Mechanical.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part28.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part4.pdf PDF
04_DRAFT_CNT2_Specs_GDR.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part10.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part2.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part4.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part11.pdf PDF
02_DRAFT_CNT2_Specs_II.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part12.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part32.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part33.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part21.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part31.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part8.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part27.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part5.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part23.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part13.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part22.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part16.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part25.pdf PDF
01_DRAFT_CNT2_Plans_5Structural.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part19.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part1.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part2.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part18.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part2.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part4.pdf PDF
01_DRAFT_CNT2_Plans_7Electrical.pdf PDF
03_DRAFT_CNT2_Specs_I.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part2.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part20.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W W

E B

E R

S H

E E

T

O F

S U

R V

E

IL

L A

N C

E A

N D

M O

N

IT

O R

IN

G

P L

A N

CF0073

S

P O

P H

A M

V

S E

V E

R A

N C

E

T G

R E

E N

W E

L L

THIS SHEET

C-512 CANAL

CREST WIDTH 14'

CREST EL. 7.3'

L-512 LEVEE,

CREST WIDTH 14'

CREST EL. 7.3

L-514 LEVEE,

AREA BERM

FINGER LAKES

EXISTING

SOUTHWEST 26TH STREET

SEE E-2801

D-511 EMBANKMENT

BOTTOM EL -2.5'

C-511 CANAL,

D-511 EMBANKMENT

CENTRAL LAKED-511 ESA EMBANKMENT

C-514 CANAL

L-511 LEVEE/RAISED SW 26TH ST.

L-514 LEVEE

L-511 LEVEE/RAISED SW 26TH ST.

A1

SURVEILLANCE AND MONITORING PLAN

5' DIAMETER MANHOLE (TYP)

400+00

405+00

410+00

435+00

440+00

30+00

55+00

60+00

65+00

70+00

75+00260+00

265+00

295+00

300+00

305+00

310+00

1065+00

1070+00

0 1

1100+00

1105+00

1110+00

1115+00

+00

1175+00

1180+00

1185+00

1190+00

1195+00

600+00

605+00

610+00

615+00

620+00

625+00

+00

735+00

500+00

505+00

510+00

2055+00

2060+00

2050+00

+0

0+

705+00

710+00

715+00

720+00

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1 C

N T

C

-C F

.d g n

U s e r:

m lu h

/1

/2

/0

/2

/0

/2

S ta n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

R

T A

S U

B M

IT

T

A L

U S

SW 36TH ST

S O

U T H P

O S T R

O A

D

SW 26TH ST

GRIFFIN ROAD

N

KEY PLAN

400' 800'0

MATCH LINE CF0074

S O

U T

H P

O S T R

O A

D

MITIGATION AREA "A"

U S

GENERAL NOTES

S-500D

C-11 IMPOUNDMENT

FOR FURTHER DETAILS ON INSTRUMENT LOCATIONS AT THE CROSS-SECTION.

CROSS-SECTION. REFER TO THE DESIGNATED INSTRUMENTATION CROSS-SECTIONS

4. INSTRUMENTS SHOWN IN PLAN VIEW ARE NOT LOCATED ON AN INSTRUMENTATION

INSTRUMENTATION CROSS-SECTIONS.

STANDPIPE PIEZOMETER AT THE ELEVATION DESIGNATED ON THE

3. A VIBRATING WIRE PIEZOMETER MUST BE INSTALLED WITHIN EACH OPEN

DETAILS.

AND TO CF0082 FOR VIBRATING WIRE PRESSURE SENSOR INSTALLATION

DRAIN SYSTEM. REFER TO CF0076 FOR INSTRUMENTED MANHOLE LOCATIONS

ELEVATION FOR SELECT MANHOLES TO MONITOR SEEPAGE WITHIN THE TOE

2. A VIBRATING WIRE PRESSURE SENSOR MUST BE INSTALLED AT THE INVERT

SURVEY SETTLEMENT MARKER DETAILS.

ALONG THE CENTERLINE OF THE EMBANKMENT CREST. REFER TO CF0082 FOR

1. SURVEY SETTLEMENT MARKERS MUST BE LOCATED ON 250 FOOT CENTERS

N

MANHOLE LOCATIONS

VIBRATING WIRE PRESSURE SENSOR

SURVEY SETTLEMENT MARKERS

LEGEND

IMP13

IMP11

IMP12

IMP1

IMP2

IMP3

A1

CF0078

E1

CF0080

CF0078

E1

CF0081

C1

CF0078

C1

CF0081

A1

D

D

D

D

D

D

D D D D

D

D

D D D D D

D

D D D

D

D

C O

N

TR

AC

T

M

O D

- F O

R

IN

FO

R

M

AT

IO

N

O N

LY

N O

T R

EV

IE

W

ED

N

O T

FO

R

C O

N

ST

R U

C

TI

O N

/0

6/

C O

N

TR

AC

T

M

O D

- F

IN

AL

N O

T

FO

R C

O N

ST

R

U C

TI

O

NDRAFT

k3endlml Stamp

File details come from the government source that posted it. Updated .