About this file

This file contains engineering drawings and technical specifications for stormwater management details related to a temporary drainage opening in the Broward County Water Preserve Areas Project, Contract 2. The drawings show three cross-sectional views at 1"=20' scale depicting conceptual designs for a temporary drainage opening excavation, bentonite amended soil backfill at a slurry wall, and slurry wall treatment prior to backfill placement.

The drawings specify requirements for a temporary drainage opening through a slurry wall to convey stormwater flow from Canal A/5 and Canal B/4 to the C-11 Canal. Key technical details include embankment transition slopes of 3:1, minimum 15-foot dimensions for excavation areas, cement paste application requirements for the slurry wall surface, and elevation specifications ranging from 0.0 to 18.8 feet for various components. The document includes five detailed general notes covering contractor requirements for drainage opening construction, surface preparation, backfilling procedures, and cement paste application standards in accordance with Section 31 42 00.

View the file

Other files

File Type Posted
01_DRAFT_CNT2_Plans_4Civil_Part29.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part14.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part24.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part9.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part15.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part7.pdf PDF
01_DRAFT_CNT2_Plans_6Mechanical.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part28.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part4.pdf PDF
04_DRAFT_CNT2_Specs_GDR.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part10.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part2.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part4.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part11.pdf PDF
02_DRAFT_CNT2_Specs_II.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part12.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part32.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part33.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part21.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part31.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part8.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part27.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part5.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part23.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part13.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part22.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part16.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part25.pdf PDF
01_DRAFT_CNT2_Plans_5Structural.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part19.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part1.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part2.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part18.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part2.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part4.pdf PDF
01_DRAFT_CNT2_Plans_7Electrical.pdf PDF
03_DRAFT_CNT2_Specs_I.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part2.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part20.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W W

E B

E R

S T

O R

M W

A T

E R

M A

N A

G E

M E

N T

D E

T A

IL

S

GC0008

S

P O

P H

A M

V

S E

V E

R A

N C

J B

U R

K

20' MIN 20' MIN

(SEE NOTE 1)

TEMPORARY DRAINAGE OPENING

EMBANKMENT TRANSITION AND DRAINAGE TERMINATION (SEE NOTE 2)

RESUMPTION (TYP)

EMBANKMENT FILL PRIOR TO

REQUIRED FOR EXPOSED

SURFACE PREPARATION WILL BE EMBANKMENT RESUMPTION (SEE NOTE 3)

15'

CEMENT PASTE (SEE NOTE 5)

SLURRY WALL (SEE NOTE 4)

EXCAVATE TO UNCONTAMINATED

15' MIN

15' MIN

BACKFILL IN SLURRY WALL

IN OF BENTONITE AMMENDED SOIL

WALL WILL BE REQUIRED TO FACILITATE TIE

EXCAVATION TO UNCONTAMINATED SLURRY

BENTONITE AMENDED SOIL BACKFILL

EMBANKMENT FILL

A1

SCALE: 1" = 20'

CONCEPTUAL TEMPORARY DRAINAGE OPENING EXCAVATION SECTION

D1

SCALE: 1" = 20'

CONCEPTUAL BENTONITE AMENDED SOIL BACKFILL AT SLURRY WALL TEMPORARY DRAINAGE OPENING

F1

SCALE: 1" = 20'

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1

C

N T

G C

.d g n U s e r:

m lu h

/3

/2

/0

/2

/0

/2

S ta n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

R

T A

S U

B M

IT

T

A L

EL 0.0

1 1

GENERAL NOTES

RECOMMENDATIONS.

WITH SECTION 31 42 00 AS WELL AS THE MANUFACTURER'S

CEMENT PASTE WILL BE MIXED AND APPLIED IN ACCORDANCE 5.

SOIL.

SURFACE PRIOR TO PLACEMENT OF THE BENTONITE AMENDED

CEMENT PASTE WILL BE PLACED ON THE SLURRY WALL

SLURRY WALL WILL BE ROUGHENED AND A THIN LAYER OF

STRONG SLURRY WALL. THE EXPOSED SURFACE OF THE

WILL BE EXCAVATED AS NEEDED DOWN TO UNCONTAMINATED,

BEFORE BACKFILLING, THE TEMPORARY DRAINAGE OPENING 4.

DETAILS B7, C7, E7, AND F6.

EMBANKMENT RESUMPTION DETAILS ARE ON SHEET CZ0031, 3.

THIS TEMPORARY DRAINAGE OPENING SECTION.

THE EMBANKMENT TERMINATION SLOPE IS REDUCED TO 3:1 AT

NOTE THE 10:1 TEMPORARY EMBANKMENT FILL IS OMITTED AND

DETAILS ARE ON SHEET CZ0029, DETAILS A1, F1, F5, AND F8.

EMBANKMENT TRANSITION AND DRAINAGE TERMINATION 2.

LEFT AS A ROUGHENED SURFACE.

CUTTING OUT THE SLURRY WALL, THE CUT SURFACE MAY BE

THE ADJACENT PROJECT SITE TO THE C-11 CANAL. WHEN

CANAL A/5 AND EXISTING CANAL B/4 STORMWATER FLOW FROM

OPENING THROUGH THE SLURRY WALL TO CONVEY EXISTING

THE CONTRACTOR MUST PROVIDE A TEMPORARY DRAINAGE 1.

EL 18.8, D-511 EMBANKMENT CREST

EL 6.0, TOP OF SLURRY WALL

EL 18.8, D-511 EMBANKMENT CREST

EL 6.0, TOP OF SLURRY WALL

SHEET CF0004)

TIP ELEVATION TABLE ON

EL VARIES (SEE SLURRY WALL

PRIOR TO BACKFILL PLACEMENT AND EMBANKMENT RESUMPTION WORK

CONCEPTUAL TEMPORARY DRAINAGE OPENING SLURRY WALL TREATMENT

SHEET CF0004)

TIP ELEVATION TABLE ON

EL VARIES (SEE SLURRY WALL

GC0008

F1 12 /0

6/

C O

N

TR

AC

T

M

O D

- F

IN

AL

N O

T

FO

R C

O N

ST

R

U C

TI

O

NDRAFT

k3endlml Stamp

File details come from the government source that posted it. Updated .