About this file

This is a draft plans and specifications document released as a Special Notice for informational purposes regarding a future procurement for the Comprehensive Everglades Restoration Plan (CERP) Broward County Water Preserve Areas Contract 2 project in Florida. The document is not a solicitation.

The project involves construction of the C-11 Impoundment and Mitigation Area A, including dam and levee embankment construction, water control structures, environmentally sensitive area systems, lake backfill, and drainage features. Key technical requirements include: building a dam embankment approximately 15 feet high with 4,800 feet of slurry wall; creating a 113-acre wetland marsh mitigation area; installing 12 water control structures (gated culverts, ungated culverts, and weirs); backfilling an existing quarry up to 55 feet deep; and managing continuous stormwater for a two square-mile drainage area. The Army Corps of Engineers Jacksonville District is seeking contractor feedback on these draft plans by March 14, 2025 at 5:00 PM EST through the ProjNet system using Project ID SAJ305 and Bidder Inquiry Key P437TE-HNNN86.

View the file

Other files

File Type Posted
01_DRAFT_CNT2_Plans_4Civil_Part29.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part14.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part24.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part9.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part15.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part7.pdf PDF
01_DRAFT_CNT2_Plans_6Mechanical.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part28.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part4.pdf PDF
04_DRAFT_CNT2_Specs_GDR.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part10.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part2.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part4.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part11.pdf PDF
02_DRAFT_CNT2_Specs_II.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part12.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part32.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part33.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part21.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part31.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part8.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part27.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part5.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part1.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part23.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part13.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part5.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part22.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part16.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part25.pdf PDF
01_DRAFT_CNT2_Plans_5Structural.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part19.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part1.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part2.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part6.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part18.pdf PDF
01_DRAFT_CNT2_Plans_1General_Part3.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part4.pdf PDF
01_DRAFT_CNT2_Plans_7Electrical.pdf PDF
03_DRAFT_CNT2_Specs_I.pdf PDF
01_DRAFT_CNT2_Plans_3Geotech_Part2.pdf PDF
01_DRAFT_CNT2_Plans_2Survey_Part3.pdf PDF
01_DRAFT_CNT2_Plans_4Civil_Part20.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W W

E B

E R

S H

E E

T

O F

S

IT

E D

E M

O L

IT

IO

N P

L A

N

CD0002

S

P O

P H

A M

V

S E

V E

R A

N C

V

S E

V E

R A

N C

THIS SHEET

(PROTECT AND DO NOT DISTURB)

ENVIRONMENTALLY SENSITIVE AREA

(PROTECT AND DO NOT DISTURB)

ENVIRONMENTALLY SENSITIVE AREA

CENTERLINE

EMBANKMENT

D-511

PROPERTY LINE

10' (MIN)

10' (MIN)

(M

IN

10' (MIN)

(SEE NOTE 5)

RESTRICTED USE MUCK AREA

1000'

PROJECT LIMITS

BUFFER (SEE NOTE 6)

RESTRICTED ACTIVITY

14 15 16

BY OTHERS. SEE NOTE 7

FUTURE RESUMPTION

TERMINATION AND

CONSTRUCTION

TRANSITION AREA OF

PROJECT LIMITS

PROJECT LIMITS

BY OTHERS. SEE NOTE 7

FUTURE RESUMPTION

TERMINATION AND

CONSTRUCTION

TRANSITION AREA OF

SEE NOTE 7

TEMPORARY PROJECT LIMITS.

TEMPORARY PROJECT LIMITS844635.07630080.8432

TEMPORARY PROJECT LIMITS844629.62630321.0131

TEMPORARY PROJECT LIMITS844504.59630321.0130

TEMPORARY PROJECT LIMITS844532.48629091.6029

TEMPORARY PROJECT LIMITS847195.58630080.6328

TEMPORARY PROJECT LIMITS847197.46629969.4827

TEMPORARY PROJECT LIMITS844637.90629955.8626

TEMPORARY PROJECT LIMITS844670.60628514.3725

TEMPORARY PROJECT LIMITS844545.63628511.5424

TEMPORARY PROJECT LIMITS844535.31628966.6023

TEMPORARY PROJECT LIMITS842662.89628966.6022

TEMPORARY PROJECT LIMITS842662.89629082.6621

SOUTH PROJECT LIMITS842621.61629351.7720

SOUTH PROJECT LIMITS843063.17629362.1019

POLYGON 23 CORNER842193.71629404.3918

POLYGON 23 CORNER842618.67629406.3517

POLYGON 23 CORNER842637.46628603.4416

POLYGON 23 CORNER843549.14628602.5715

POLYGON 23 CORNER844022.42628601.5014

POLYGON 23 CORNER844575.40628595.9513

POLYGON 23 CORNER844540.73630032.0112

POLYGON 23 CORNER844539.77630075.4611

POLYGON 23 CORNER844539.24630098.9110

POLYGON 23 CORNER842183.47630104.929

SOUTH PROJECT LIMITS847212.40630351.098

SOUTH PROJECT LIMITS846688.02630339.057

TEMPORARY PROJECT LIMITS847217.07630081.126

TEMPORARY PROJECT LIMITS846693.69630091.805

SOUTH PROJECT LIMITS846688.43630321.014

SOUTH PROJECT LIMITS843040.74630321.013

TEMPORARY PROJECT LIMITS843069.50629091.602

TEMPORARY PROJECT LIMITS842628.93629081.871

DESCRIPTIONEASTINGNORTHINGPOINT

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F

IL

E N

A M

E

D R

A W

IN

G

D A

T E

A N

S I

D

W

E P

-2

-C -X

X X

X

JA

C

K S

O N

V

IL

L E

D

IS

T R

IC

T

S

A N

M A

R C

O B

L V

D

J A

C K

S O

N V

IL

L

E F

L

C

-1

C

N T

C -C

D

.d g n

U s e r:

m lu h

/1

/2

/0

/2

/0

/2

S ta n te c T

E T

R A

T E

C H

J O

I N

T V

E T

U R

E N

J V

I I on any electronic copies.

the signature must be verified signed and sealed and document are not considered

Printed copies of this

Vincent Joseph Severance signed and sealed by

This item has been digitally

License No. 93101

Professional Engineer, State of Florida, Vincent Joseph Severance, B R

O W

A R

D C

O U

N T

Y

F L

O R

ID

A

C O

N T

R A

C T

C

-1 I

M P

O U

N D

M E

N T

A N

D M

IT

IG

A T

IO

N

A R

E A

A

B R

O W

A R

D C

O U

N T

Y W

A T

E R

P R

E S

E R

V E

A R

E A

S P

R O

J E

C T

C O

M P

R E

H E

N S

IV

E

E V

E R

G L

A D

E S

R E

S T

O R

A T

IO

N

P L

A N

C

E R

P

W E

P R

C O

N T

R A

C T

R

T A

S U

B M

IT

T

A L

U S

SW 36TH ST

S O

U T H P

O S T R

O A

D

SW 26TH ST

GRIFFIN ROAD

N

A1

SITE DEMOLITION PLAN

400' 800'0

MATCH LINE CD0001

C-11 IMPOUNDMENT

SOUTHWEST 36TH ST

GRIFFIN ROAD

U S

GENERAL NOTES

SHEET KEYNOTES

EXISTING B/4 CANAL CULVERTS TO REMAIN.10.

TO BE DISTURBED BY THE PROJECT.

AREA BETWEEN PROJECT LIMITS AND TEMPORARY PROJECT LIMITS IS NOT 9.

ENVIRONMENTAL PROTECTION REQUIREMENTS WITHIN PROJECT LIMITS.

WETLAND POLYGON 23, SEE SPECIFICATION SECTION 01 57 20 FOR 8.

BE RESTORED TO EXISTING CONDITIONS).

REMOVAL FOR BASE PLACEMENT MAY ENCROACH THIS BUFFER BUT MUST

OFFSET FROM TOE OF SLOPE TO PROPERTY LINE OR RIGHT-OF-WAY (MUCK 7.

PROTECT AREAS FROM CONSTRUCTION ACTIVITIES. SEE SHEET GC0002.

6. EXISTING CONDITIONS WITHIN BOUNDARY TO REMAIN. CONTRACTOR MUST

REMOVE CULVERT.5.

MISCELLANEOUS PAVEMENT REMOVAL.4.

SEE TYPICAL SECTIONS AND SPECIFICATION 31 10 00.

REQUIRED WITHIN THE LIMITS OF THE EMBANKMENTS, LEVEES, AND CANALS.

TO CF0039). CLEARING AND STRIPPING OF ALL VEGETATION WILL BE

LIMITS OF CLEARING AND STRIPPING (SEE TYPICAL SECTION SHEETS CF0034 3.

CLEAR IMPOUNDMENT INTERIOR PER SPECIFICATION SECTION 31 10 00.2.

INTERNAL IMPOUNDMENT AREA.

CREATED BY SOUTHWEST 36TH STREET DOWN TO EL 4.0 ACROSS THE

REMOVE SOUTHWEST 36TH ST PAVEMENT AND SUBBASE. REMOVE BERM 1.

N

FOR TRANSITION DETAILS.

SEE GC0007 FOR TEMPORARY DRAINAGE PLAN AND SHEETS CZ0029-CZ0031

SEE SPECIFICATION SECTION 01 14 00 FOR SCHEDULING REQUIREMENTS. 7.

ON THE SOUTHEASTERN PORTION OF THE PROJECT AREA.

INCINERATING WITHIN 1000' OF THE EMBANKMENT CENTERLINES IDENTIFIED

NO MATERIAL PROCESSING, BORROW AREAS, BATCH PLANTS OR 6.

REQUIREMENTS.

EXISTING BORROW PIT, SEE CF0084 AND CF0085 FOR BACKFILL

PROJECT LIMITS MUST NOT BE USED AS BACKFILL IN THE CENTRAL LAKE OR

SEE C-0005 FOR AREA LOCATION. RESTRICTED USE MUCK AREA WITHIN 5.

ACCORDANCE TO SPECIFICATION 31 00 00 EARTHWORK .

4. INCIDENTAL BACKFILL RESULTING FROM DEMO ITEMS MUST BE IN

ACCORDANCE WITH SPECIFICATION 02 41 00.

CANAL FOOTPRINT TO 50 FEET BEYOND THE TOE OF THE EMBANKMENT IN

COMPLETELY REMOVE ALL BURIED PIPING WITHIN THE EMBANKMENT AND

UNKNOWN LOCATIONS WITHIN THE EMBANKMENT AND CANAL FOOTPRINT.

SITE MAY CONTAIN EXISTING BURIED IRRIGATION AND DRAINAGE PIPES AT 3.

CD0003.

2. WELL LOCATIONS PROVIDED IN THE WELL ABANDONMENT PLAN ON SHEET

DETAILS AND PROHIBITION OF ONSITE STORAGE OF DEBRIS).

SURVEY DATA AND PROJECT INFORMATION (SEE SPECIFICATION 02 41 00 FOR

QUANTITIES CANNOT BE ACCURATELY DETERMINED FROM THE EXISTING

WELLS, AND OTHER DEBRIS AND DUMPED TRASH. SITE DEMOLITION

DRAINAGE CULVERTS, ABANDONED UTILITIES, VEHICLE GATES, MONITORING

THE INTERIOR OF THE SITE INCLUDES MISCELLANEOUS PAVED AREAS, 1.

LEGEND

RESTRICTED ACTIVITY BUFFER (SEE NOTE 6)

TO BE REMOVED

RESTRICTED USE MUCK AREA

ON PLAN FOR EACH AREA

PROTECTED AREA, SEE KEYNOTE 6, OR 8 AS IDENTIFIED

CLEARING AND STRIPPING

UTILITIES

CULVERT

HEADWALL

CULVERT AND

AND CULVERT

PAVEMENT

VEHICLE GATE

GUARDRAIL AND

PAVEMENT,

VEHICLE GATE

GUARDRAIL AND

BORROW PIT

EXISTING

POINT TABLE

KEY PLAN

CD0005

A1

CD0005

A7

CD0005

A4

CD0005

D4

CD0004

B7

CF0085

F2

C O

N

TR

AC

T

M

O D

- F O

R

IN

FO

R

M

AT

IO

N

O N

LY

N O

T R

EV

IE

W

ED

N

O T

FO

R

C O

N

ST

R U

C

TI

O N

/0

6/

C O

N

TR

AC

T

M

O D

- F

IN

AL

N O

T

FO

R C

O N

ST

R

U C

TI

O

NDRAFT

k3endlml Stamp

File details come from the government source that posted it. Updated .