This is a civil engineering drawing showing a slurry wall plan for the C-11 Impoundment and Mitigation Area A project in Broward County, Florida. The drawing details the layout and specifications of a slurry wall system divided into 7 segments totaling approximately 29,789 linear feet, with varying bottom elevations ranging from -10 to -35 feet.
The plan indicates key features including slurry wall depth transitions, temporary wall terminations, and interface points with structure S-506A. The wall is positioned 7 feet left of the D-511 embankment centerline, with width variations from 2.5 to 4 feet in certain sections. The drawing includes station markers, elevation details, and construction notes regarding flow maintenance requirements for existing canals A/5, B/4 and C/3. General notes specify sequencing requirements, strength requirements, and construction specifications in accordance with Sections 02 35 29 and 35 73 13. The drawing is part of Contract 2 of the Comprehensive Everglades Restoration Plan (CERP) and is marked as "DRAFT - NOT FOR CONSTRUCTION."
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5+
5+
0+
270+00
275+00
280+00
285+00
290+
+0
0+00
5+00
10+00
15+00
20+00
25+00
95+00
100+00
105+00
110+00
35+00
40+00
45+00
50+00
165+00
170+00
175+00
180+00
185+00
190+00
195+00
W W
E B
E R
S L
U R
R Y
W A
L L
P L
A N
CF0004
N
T
IN
IO
V
S E
V E
R A
N C
J B
U R
K
EXISTING BORROW PIT
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 214+50
D-511 EMBANKMENT CENTERLINE
TERMINATION, SEE SHEET CZ0029
TEMPORARY SLURRY WALL
STA 203+75
TERMINATION, SEE SHEET CZ0029
TEMPORARY SLURRY WALL
STA 146+25
D-511 EMBANKMENT CENTERLINE
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 267+95
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 441+90.56
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 402+00
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 311+55
SEE SHEET CZ0024
SLURRY WALL DEPTH TRANSITION,
STA 29+50
S-506A (SEE NOTE 4)
EXCAVATION SUPPORT SYSTEM AT
ACCOMODATE CONSTRUCTION OF
BEGIN 4' WIDE SLURRY WALL TO
STA 0+90
S-506A (SEE NOTE 4)
EXCAVATION SUPPORT SYSTEM AT
ACCOMODATE CONSTRUCTION OF
END 4' WIDE SLURRY WALL TO
STA 1+95
BOTTOM ELEV -35'
11,675 LF
SEGMENT 7
BOTTOM ELEV -15'
3,127 LF
SEGMENT 6
BOTTOM ELEV -10'
3,991 LF
SEGMENT 4
BOTTOM ELEV -30'
5,345 LF
SEGMENT 2
BOTTOM ELEV -35'
1,075 LF
SEGMENT 1
BOTTOM ELEV -25'
1,993 LF
SEGMENT 3
BOTTOM ELEV -25'
2,583 LF
SEGMENT 5
11675146+2529+50-357
295029+500+00-156
177313+32311+55-156
2383311+55287+72-255
200402+00400+00-255
3991441+91402+00-104
191443+91442+00-253
1802285+97267+95-253
5345267+95214+50-302
1075214+50203+75-351
LENGTH (ft)STATION INTERVAL
(FT)
BOTTOM ELEV
SEGMENT
SLURRY WALL SUMMARY
(SEE NOTE 4)
WITH S-506A
INTERFACE
SLURRY WALL
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
F
IL
E N
A M
E
D R
A W
IN
G
D A
T E
A N
S I
D
W
E P
-2
-C -X
X X
X
JA
C
K S
O N
V
IL
L E
D
IS
T R
IC
T
S
A N
M A
R C
O B
L V
D
J A
C K
S O
N V
IL
L
E F
L
C
-1 C
N T
C
-C F
.d g n
U s e r:
m lu h
/1
/2
/0
/2
/0
/2
S ta n te c T
E T
R A
T E
C H
J O
I N
T V
E T
U R
E N
J V
I I on any electronic copies.
the signature must be verified signed and sealed and document are not considered
Printed copies of this
Vincent Joseph Severance signed and sealed by
This item has been digitally
License No. 93101
Professional Engineer, State of Florida, Vincent Joseph Severance, B R
O W
A R
D C
O U
N T
Y
F L
O R
ID
A
C O
N T
R A
C T
C
-1 I
M P
O U
N D
M E
N T
A N
D M
IT
IG
A T
IO
N
A R
E A
A
B R
O W
A R
D C
O U
N T
Y W
A T
E R
P R
E S
E R
V E
A R
E A
S P
R O
J E
C T
C O
M P
R E
H E
N S
IV
E
E V
E R
G L
A D
E S
R E
S T
O R
A T
IO
N
P L
A N
C
E R
P
W E
P R
C O
N T
R A
C T
R
T A
S U
B M
IT
T
A L
A1
SLURRY WALL PLAN
GENERAL NOTES
SHEET KEYNOTES
CENTERLINE. SEE SHEET CZ0017.
SLURRY WALL DOWNSTREAM EDGE 7.0' LT OFFSET FROM D-511 EMBANKMENT 4.
CANAL C/3 ALONG THE EASTERN LIMITS OF THE PROJECT.
DURING CONSTRUCTION THE CONTRACTOR MUST MAINTAIN FLOW OF EXISTING 3.
CANAL B/4 FROM THE SOUTHWEST 36TH STREET CROSSING TO THE C-11 CANAL.
DURING CONSTRUCTION THE CONTRACTOR MUST MAINTAIN FLOW OF EXISTING 2.
LENGTH OF EXISTING CANAL A/5.
DURING CONSTRUCTION THE CONTRACTOR MUST MAINTAIN FLOW FOR ENTIRE 1.
N
CENTERLINE, SEE SHEET CZ0017 FOR MORE DETAILS.
REMAINING A CONSTANT 7' OFFSET FROM THE D-511 EMBANKMENT
WALL WIDTH INCREASES TO 4' WITH THE DOWNSTREAM EDGE OF THE WALL
SEE SHEET S-2801 FOR SLURRY WALL INTERFACE WITH S-506A. SLURRY 4.
SCARIFIED AS REQUIRED BY SECTION 35 73 13.
FILL, IN-PLACE COMPACTED FILL MUST BE MOISTURE CONDITIONED AND
BY SECTION 02 35 29. PRIOR TO PLACEMENT OF ADDITIONAL EMBANKMENT
CONTRACTOR’S TEMPORARY WORKBENCH MUST BE REMOVED AS REQUIRED
MINIMUM REQUIRED STRENGTH, DELETERIOUS MATERIALS ON THE
UPON COMPLETION OF SLURRY WALL INSTALLATION AND ACHIEVING THE
INTEGRITY OF THE SLURRY WALL DURING SUBSEQUENT CONSTRUCTION.
REQUIRED STRENGTH SHOULD BE ACHIEVED TO AVOID ANY DAMAGE TO THE
PILES AND PLACEMENT OF COMPACTED FILL TO DESIGN GRADES. MINIMUM
SEEPAGE COLLECTION SYSTEM AND TOE DRAIN, INSTALLATION OF SECANT
STARTING ASSOCIATED WORK TO INCLUDE BUT NOT LIMITED TO THE
REQUIRED STRENGTH IN ACCORDANCE WITH SECTION 02 35 29 PRIOR TO
THE SLURRY WALL MUST BE INSTALLED AND CURED TO THE MINIMUM 3.
INDICATED IN SPECIFICATION SECTION 02 35 29.
FOUNDATION. LIMITS FOR LENGTH OF OPEN UNSUPPORTED TRENCH ARE AS
WITH 35 73 13, AND WILL INCLUDE PORTIONS OF THE EMBANKMENT
TEMPORARY WORK BENCH WHICH MUST BE CONSTRUCTED IN ACCORDANCE
SECTION 02 35 29. CONSTRUCTION WILL REQUIRE INSTALLATION OF A
CONSTRUCTION OF THE SLURRY WALL MUST BE IN ACCORDANCE WITH 2.
COMPLETION OF SLURRY WALL.
THE CONTRACTOR MAY PROGRESS WITH CONSTRUCTION PRIOR TO
THE PROJECT. IN LOCATIONS OUTSIDE OF THE SLURRY WALL ALIGNMENT,
TESTING OF THE SLURRY WALL IS COMPLETED AS AN EARLY WORK ITEM ON
CONTRACTOR MUST SEQUENCE THE WORK SUCH THAT INSTALLATION AND 1.
US 27
C-11 IMPOUNDMENT
S O
U T
H W
E S
T
T
H S
T R
E E
T
G R
IF
F
IN
R
O A
D
CANAL A/5
CANAL B/4
CANAL C/3
C -1
C
A N
A L
0 500' 1000'
C-11 IMPOUNDMENT
CANAL B/4
LAKE
CENTRAL
EXISTING
LAKES
FINGER
EXISTING
MITIGATION AREA "A"
MITIGATION AREA "A"
SOUTH
POST
R
OAD
S O
U T
H W
E S
T
T
H S
T R
E E
T
TYP.
TYP.
CZ0024
D1
CZ0024
A1
C O
N
TR
AC
T
M
O D
- F O
R
IN
FO
R
M
AT
IO
N
O N
LY
N O
T R
EV
IE
W
ED
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/0
6/
C O
N
TR
AC
T
M
O D
- F
IN
AL
N O
T
FO
R C
O N
ST
R
U C
TI
O
NDRAFT
k3endlml Stamp
File details come from the government source that posted it. Updated .