01_-_BP1_-_COVERSHEET.pdf

PDF 759 KB Posted

Attached to
New ECAT Facility Project (Infrastructure Only), CDBG-DR HS004
Solicitation number
PD 25-26.087
Issued by
Escambia County, Florida

About this file

This is a Bid Package 1 coversheet for the New ECAT Facility Project involving Escambia County, Florida, the Escambia County Area Transit Authority, and multiple design and construction firms. The project encompasses design and construction administration for critical infrastructure installation at a new transit facility located at 100 Clarinda Lane, Pensacola, Florida, supporting an Administration Building, Bus Wash and Fuel Depot, and Maintenance Building. The scope includes civil works, landscape design, structural, architectural, fire protection, plumbing, mechanical, electrical, and technology systems. The bid package was issued on September 3, 2026, with the status date of September 3, 2026. The project involves comprehensive site work including demolition of existing structures, grading, paving, utility installation, drainage systems, erosion control, and landscaping across multiple site areas including the administration building, maintenance building, transfer center, wash and fuel station, and north parking lot. The design team includes KED Bluestone (owner's consultant), RLG Consulting Engineers (prime consultant), Hodgson Douglas Landscape Architects, and QSC Services, LLC serving as project management.

The project is funded through CDBG-DR HS004 grant funding and requires a licensed Underground or Utility Contractor to execute the infrastructure installation work. The coversheet includes comprehensive drawing indices covering civil, landscape, architectural, electrical, and site plans necessary for bidding and construction execution. Key project contacts include Matthew Jhanke (KED Bluestone), Phillip Brugger (RLG Consulting), Hank Dalton (Hodgson Douglas), and Lance Zaerr, Jr. (QSC Services). The design documentation incorporates deductive alternate bid options for select site components, allowing bidders flexibility in their proposals.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURAL

CONTACT -

P - E -

CIVIL

CONTACT -

P - E -

ARCHITECTURE

ADG

800 SW ADAMS STREET

SUITE 101

PEORIA, IL 61602

CONTACT -

P - E -

MECHANICAL, ELECTRICAL & PLUMBING

CONTACT -

P - E -

309.672.6948

LANDSCAPE

CONTACT -

P - E -

ADDRESS

CITY, STATE ZIP

PROJECT NO.

STATUS

DATE

OWNER ID

SHEET INDEX

PROJECT INFORMATION

CIVIL LANDSCAPE STRUCTURAL ARCHITECTURAL FIRE PROTECTION & PLUMBING MECHANICAL ELECTRICAL TECHNOLOGYGENERAL

OWNER CONSULTANT

CONTACT -

P - E -

BID PACKAGE 1BID PACKAGE 1

ESCAMBIA COUNTY AREA TRANSIT - FACILITY

KEDbluestone 5518 NW 88th Street

JOHNSTON, IA 50131

515.727.0700 matthew.jhanke@kedbluestone.com

FIRST NAME LAST NAME

EMAIL

RLG CONSULTING ENGINEERS

12001 N CENTRAL

EXPY #300

DALLAS, TX 75243

Phillip Brugger 214.739.8100 pbrugger@rlginc.com

BID PACKAGE #1

09/03/2026

100 CLARINDA LN

PENSACOLA, FLORIDA, 32505

HODGSON DOUGLAS LANDSCAPE

ARCHITECTS

12001 N. CENTRAL EXPRESSWAY

STE 1170

CDALLAS, TX 75243

214.749.0333 hdalton@hodgsondouglas.com

Hank Dalton Matthew Jhanke DESIGN & CONSTRUCTION ADMINISTRATION DIVISION

ESCAMBIA COUNTY, FLORIDA 100. E BLOUNT STREET

QSC SERVICES, LLC

PMB #69, 545 BRENT LN.

PENSACOLA, FL

Lance Zaerr, Jr.

309.231.8272 lzaerrjr@qscservices.us PENSACOLA, FL

C00.01 C00.02 C00.03 C00.04 C01.00 C01.01 C01.02 C01.03 C01.04 C01.05 C02.00

CR01.01

CR01.02

CR01.03

CR01.04

CR01.05

C02.01 C02.02 C02.02A C02.03 C02.04 C02.05 C03.00 C03.01 C03.02 C03.02A C03.03 C03.04 C03.05 C04.00 C04.01 C04.02 C04.02A C04.03 C04.04 C04.05 C04.06 C04.07 C04.08 C04.09 C04.10 C05.00 C05.01 C05.02 C05.03 C05.04 C07.00 C07.01 C08.00

GENERAL NOTES

PRE DEVELOPMENT DRAINAGE AREA MAP

DETENTION CALCULATIONS

POST DEVELOPMENT DRAINAGE AREA MAP

OVERALL DEMOLITION PLAN

DEMOLITION PLAN - ADMINISTRATION BLDG

DEMOLITION PLAN - MAINTENANCE BLDG

DEMOLITION PLAN - TRANSFER CENTER

DEMOLITION PLAN - WASH & FUEL STATION

DEMOLITION PLAN - NORTH PARKING LOT

OVERALL PAVING PLAN

PAVING PLAN & PROFILE

PAVING PLAN & PROFILE

PAVING PLAN & PROFILE

ROADWAY SECTIONS

ROADWAY SECTIONS

PAVING PLAN - ADMINISTRATION BLDG

PAVING PLAN - MAINTENANCE BLDG

DEDUCTIVE ALTERNATE PAVING PLAN

PAVING PLAN - TRANSFER CENTER

PAVING PLAN - WASH & FUEL STATION

PAVING PLAN - NORTH PARKING LOT

OVERALL GRADING PLAN

GRADING PLAN - ADMINISTRATION BLDG

GRADING PLAN - MAINTENANCE BLDG

DEDUCTIVE ALTERNATE GRADING PLAN

GRADING PLAN - TRANSFER CENTER

GRADING PLAN - WASH & FUEL STATION

GRADING PLAN - NORTH PARKING LOT

OVERALL STORM SEWER PLAN

DRAINAGE PLAN - ADMINISTRATION BLDG

DRAINAGE PLAN - MAINTENANCE BLDG

DEDUCTIVE ALTERNATE DRAINAGE PLAN

DRAINAGE PLAN - TRANSFER CENTER

DRAINAGE PLAN - WASH & FUEL STATION

DRAINAGE PLAN - NORTH PARKING LOT

DRAINAGE PROFILES

DRAINAGE PROFILES

DRAINAGE PROFILES

DRAINAGE QUANTITIES

DRAINAGE QUANTITIES

OVERALL UTILITY PLAN

UTILITY PLAN - ADMINISTRATION BLDG

UTILITY PLAN - MAINTENANCE BLDG

UTILITY PLAN - TRANSFER CENTER

UTILITY PLAN - WASH & FUEL STATION

EROSION CONTROL PLAN

EROSION CONTROL DETAILS

CIVIL DETAILS

000 COVER SHEET L0.01

L0.02

TREE PROTECTION

TREE MITIGATION CHART

CONCEPTUAL RENDERING: FOR REFERENCE ONLY

ES000

ES100

BID PACKAGE #1 ELECTRICAL COVER PAGE

BID PACKAGE #1 ELECTRICAL SITE PLAN

Tommy Keyser Snapshot

Tommy Keyser Architect

EXP. 02/28/2027

000 - COVER

2026-09-03T14:04:50-0500
Thomas F. Keyser

File details come from the government source that posted it. Updated .