01_-_BP1_-_COVERSHEET.pdf
PDF 759 KB Posted
- Solicitation number
- PD 25-26.087
- Issued by
- Escambia County, Florida
About this file
This is a Bid Package 1 coversheet for the New ECAT Facility Project involving Escambia County, Florida, the Escambia County Area Transit Authority, and multiple design and construction firms. The project encompasses design and construction administration for critical infrastructure installation at a new transit facility located at 100 Clarinda Lane, Pensacola, Florida, supporting an Administration Building, Bus Wash and Fuel Depot, and Maintenance Building. The scope includes civil works, landscape design, structural, architectural, fire protection, plumbing, mechanical, electrical, and technology systems. The bid package was issued on September 3, 2026, with the status date of September 3, 2026. The project involves comprehensive site work including demolition of existing structures, grading, paving, utility installation, drainage systems, erosion control, and landscaping across multiple site areas including the administration building, maintenance building, transfer center, wash and fuel station, and north parking lot. The design team includes KED Bluestone (owner's consultant), RLG Consulting Engineers (prime consultant), Hodgson Douglas Landscape Architects, and QSC Services, LLC serving as project management.
The project is funded through CDBG-DR HS004 grant funding and requires a licensed Underground or Utility Contractor to execute the infrastructure installation work. The coversheet includes comprehensive drawing indices covering civil, landscape, architectural, electrical, and site plans necessary for bidding and construction execution. Key project contacts include Matthew Jhanke (KED Bluestone), Phillip Brugger (RLG Consulting), Hank Dalton (Hodgson Douglas), and Lance Zaerr, Jr. (QSC Services). The design documentation incorporates deductive alternate bid options for select site components, allowing bidders flexibility in their proposals.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURAL
CONTACT -
P - E -
CIVIL
CONTACT -
P - E -
ARCHITECTURE
ADG
800 SW ADAMS STREET
SUITE 101
PEORIA, IL 61602
CONTACT -
P - E -
MECHANICAL, ELECTRICAL & PLUMBING
CONTACT -
P - E -
309.672.6948
LANDSCAPE
CONTACT -
P - E -
ADDRESS
CITY, STATE ZIP
PROJECT NO.
STATUS
DATE
OWNER ID
SHEET INDEX
PROJECT INFORMATION
CIVIL LANDSCAPE STRUCTURAL ARCHITECTURAL FIRE PROTECTION & PLUMBING MECHANICAL ELECTRICAL TECHNOLOGYGENERAL
OWNER CONSULTANT
CONTACT -
P - E -
BID PACKAGE 1BID PACKAGE 1
ESCAMBIA COUNTY AREA TRANSIT - FACILITY
KEDbluestone 5518 NW 88th Street
JOHNSTON, IA 50131
515.727.0700 matthew.jhanke@kedbluestone.com
FIRST NAME LAST NAME
RLG CONSULTING ENGINEERS
12001 N CENTRAL
EXPY #300
DALLAS, TX 75243
Phillip Brugger 214.739.8100 pbrugger@rlginc.com
BID PACKAGE #1
09/03/2026
100 CLARINDA LN
PENSACOLA, FLORIDA, 32505
HODGSON DOUGLAS LANDSCAPE
ARCHITECTS
12001 N. CENTRAL EXPRESSWAY
STE 1170
CDALLAS, TX 75243
214.749.0333 hdalton@hodgsondouglas.com
Hank Dalton Matthew Jhanke DESIGN & CONSTRUCTION ADMINISTRATION DIVISION
ESCAMBIA COUNTY, FLORIDA 100. E BLOUNT STREET
QSC SERVICES, LLC
PMB #69, 545 BRENT LN.
PENSACOLA, FL
Lance Zaerr, Jr.
309.231.8272 lzaerrjr@qscservices.us PENSACOLA, FL
C00.01 C00.02 C00.03 C00.04 C01.00 C01.01 C01.02 C01.03 C01.04 C01.05 C02.00
CR01.01
CR01.02
CR01.03
CR01.04
CR01.05
C02.01 C02.02 C02.02A C02.03 C02.04 C02.05 C03.00 C03.01 C03.02 C03.02A C03.03 C03.04 C03.05 C04.00 C04.01 C04.02 C04.02A C04.03 C04.04 C04.05 C04.06 C04.07 C04.08 C04.09 C04.10 C05.00 C05.01 C05.02 C05.03 C05.04 C07.00 C07.01 C08.00
GENERAL NOTES
PRE DEVELOPMENT DRAINAGE AREA MAP
DETENTION CALCULATIONS
POST DEVELOPMENT DRAINAGE AREA MAP
OVERALL DEMOLITION PLAN
DEMOLITION PLAN - ADMINISTRATION BLDG
DEMOLITION PLAN - MAINTENANCE BLDG
DEMOLITION PLAN - TRANSFER CENTER
DEMOLITION PLAN - WASH & FUEL STATION
DEMOLITION PLAN - NORTH PARKING LOT
OVERALL PAVING PLAN
PAVING PLAN & PROFILE
PAVING PLAN & PROFILE
PAVING PLAN & PROFILE
ROADWAY SECTIONS
ROADWAY SECTIONS
PAVING PLAN - ADMINISTRATION BLDG
PAVING PLAN - MAINTENANCE BLDG
DEDUCTIVE ALTERNATE PAVING PLAN
PAVING PLAN - TRANSFER CENTER
PAVING PLAN - WASH & FUEL STATION
PAVING PLAN - NORTH PARKING LOT
OVERALL GRADING PLAN
GRADING PLAN - ADMINISTRATION BLDG
GRADING PLAN - MAINTENANCE BLDG
DEDUCTIVE ALTERNATE GRADING PLAN
GRADING PLAN - TRANSFER CENTER
GRADING PLAN - WASH & FUEL STATION
GRADING PLAN - NORTH PARKING LOT
OVERALL STORM SEWER PLAN
DRAINAGE PLAN - ADMINISTRATION BLDG
DRAINAGE PLAN - MAINTENANCE BLDG
DEDUCTIVE ALTERNATE DRAINAGE PLAN
DRAINAGE PLAN - TRANSFER CENTER
DRAINAGE PLAN - WASH & FUEL STATION
DRAINAGE PLAN - NORTH PARKING LOT
DRAINAGE PROFILES
DRAINAGE PROFILES
DRAINAGE PROFILES
DRAINAGE QUANTITIES
DRAINAGE QUANTITIES
OVERALL UTILITY PLAN
UTILITY PLAN - ADMINISTRATION BLDG
UTILITY PLAN - MAINTENANCE BLDG
UTILITY PLAN - TRANSFER CENTER
UTILITY PLAN - WASH & FUEL STATION
EROSION CONTROL PLAN
EROSION CONTROL DETAILS
CIVIL DETAILS
000 COVER SHEET L0.01
L0.02
TREE PROTECTION
TREE MITIGATION CHART
CONCEPTUAL RENDERING: FOR REFERENCE ONLY
ES000
ES100
BID PACKAGE #1 ELECTRICAL COVER PAGE
BID PACKAGE #1 ELECTRICAL SITE PLAN
Tommy Keyser Snapshot
Tommy Keyser Architect
EXP. 02/28/2027
000 - COVER
| 2026-09-03T14:04:50-0500 | |
| Thomas F. Keyser |
File details come from the government source that posted it. Updated .