003897A_Anclote_Road_Improvements_Final_PER_062024_1.pdf
PDF 5 MB Posted
- Attached to
- Anclote Road Stormwater and Roadway Improvements - Professional Engineering Services (PID 003897A)
- Solicitation number
- 26-0128-RFQ-CCNA
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a Preliminary Engineering Report (PER) prepared by Pennoni Associates Inc. for Pinellas County Public Works regarding roadway and stormwater improvements along Anclote Road in unincorporated Pinellas County and the City of Tarpon Springs, Florida. The project encompasses a 2.4-mile corridor extending from Anclote Boulevard to Alternate US 19 and addresses localized flooding, poor pavement conditions, and safety concerns for pedestrians and bicyclists. The report evaluates a no-build alternative and two primary build alternatives featuring either a 10-foot shared-use path with 5-foot sidewalks (Alternative 1) or 4-foot on-street bike lanes with 5-foot sidewalks (Alternative 2), along with two distinct Phase Area 3 configurations. The project is divided into three phases: Phase Area 1 from Alternate US 19 to L&R Industrial Boulevard (including Center Avenue improvements); Phase Area 2 from L&R Industrial Boulevard to Wesley Avenue (including Savannah Avenue and Brady Road improvements); and Phase Area 3 from Wesley Avenue to Anclote Boulevard. Probable construction cost estimates for alternatives (excluding right-of-way and pond costs) range from $25.4 million without a roundabout to $27.0 million with a roundabout intersection improvement at Anclote Road and Anclote Boulevard. The report was completed in June 2024 and includes extensive analysis of existing conditions, drainage systems, environmental impacts, cultural resources, contamination sites, and public involvement findings from a February 23, 2023 community meeting.
The project addresses critical infrastructure deficiencies including inadequate stormwater management, with proposed solutions including roadside treatment swales, wet detention ponds (estimated at 0.61 to 0.79 acres per phase requiring offsite acquisition), and improved drainage structures. Environmental considerations include floodplain compensation analysis showing net cut volumes requiring no additional compensation, sea level rise projections of 2.82 feet by 2080 under intermediate scenarios, wetland impacts of approximately 1.09 to 1.13 acres across alternatives, and identified contamination sites requiring special management during construction. The project will require multiple environmental permits including Southwest Florida Water Management District (SWFWMD) and U.S. Army Corps of Engineers authorizations, with anticipated impacts to approximately 267 trees requiring replacement or relocation per Pinellas County code. Right-of-way acquisition requirements range from $768,840 to $1,167,555 depending on the alternative selected, with additional costs for offsite stormwater ponds estimated between $400,915 and $540,170 per pond. The project is identified as a Target Employment Center and supports consistency with the Forward Pinellas 2045 Long Range Transportation Plan, providing multimodal connectivity to industrial, commercial, residential, and employment areas while connecting to the Coastal Anclote Trail and Elfers Spur Trail systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Anclote_Rd_SOS_100625.pdf | ||
| Sample_Agreement.pdf | ||
| 26-0128-RFQ-CCNA_3-4-26.pdf | ||
| Appendices_Final_PER__00387A_Anclote_Road_Combined_062024.pdf | ||
| 003897A_Anclote_Road_Improvements_Final_PER_062024_1.pdf | ||
| 003987A_FY26_PFO_11.20.25pdf.pdf | ||
| Sum_of_Alter_in_PER_f_One_Note.docx | DOCX document | |
| 102225_addit_cmts_Trees.pdf | ||
| Request_for_ITB_CCNA_RFP_Nov2023.docx | DOCX document | |
| Additional_requirements_rev1.docx | DOCX document | |
| Community_Grants_Procurement_Review_Checklist_October_2023.docx | DOCX document | |
| Anclote_Rd_SOS_100625.docx | DOCX document | |
| 06-Best-practice-guide-for-procure.pdf | ||
| Notice_of_Intent_to_Sole_Source_07-25-2023.pdf | ||
| Non-Competitive_Oversight_Committee_Justification_Form.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANCLOTE ROAD ROADWAY AND STORMWATER
IMPROVEMENTS
(ANCLOTE BOULEVARD TO ALTERNATE US 19)
COUNTY PID: 003897A
PRELIMINARY ENGINEERING REPORT
PREPARED FOR:
PINELLAS COUNTY
PUBLIC WORKS CIP DIVISION, STORMWATER & PARKS SECTION
14 SOUTH FORT HARRISON AVENUE
CLEARWATER, FLORIDA 33756
PREPARED BY:
PENNONI ASSOCIATES INC.
5755 RIO VISTA DRIVE
CLEARWATER, FLORIDA 33760
JUNE 20, 2024
FINAL
ANCLOTE ROAD IMPROVEMENTS
PENNONI
TABLE OF CONTENTS
1. INTRODUCTION
1.1 Project Description
1.2 Purpose and Need
1.2.1 Purpose
1.2.2 Need
a. Safety
b. Social and Economic Demands
c. Consistency with Transportation Plans
1.2.3 Project Location and Phases
a. Phase Area 1
b. Phase Area 2
c. Phase Area 3
1.3 Related Projects, Studies, and Resources
2. EXISTING CONDITIONS
2.1 Existing Roadway Characteristics
2.1.1 Location and Functional Classification
2.1.2 Access Management
2.1.3 Evacuation Route
2.1.4 Typical Sections
2.1.5 Pedestrian and Bicycle Facilities
2.1.6 Transit Facilities
2.1.7 Existing Right of Way
2.1.8 Horizontal and Vertical Alignment
2.1.9 Geotechnical Data
2.1.10 Signalizations and Intelligent Transport System (ITS)
2.1.11 Pavement Conditions
2.1.12 Railroads
2.1.13 Utilities
2.1.14 Bridges and Culvert Cross Drain Structures
2.1.15 Lighting
2.1.16 Land Use
2.1.17 Target Employment Centers for Economic Development
2.1.18 Traffic and Levels of Service
2.1.19 Transportation and Traffic Analysis
2.1.20 Existing Drainage
a. Phase Area 1
b. Phase Area 2
c. Phase Area 3
2.1.21 Existing Floodplains
2.1.22 Impaired Water Body
2.1.23 Contamination
3. DESIGN CONTROLS AND CRITERIA
3.1 Design Criteria
4. ALTERNATIVE ANALYSIS
4.1 No Build Alternative
4.2 Build Alternative 1 (Phase Areas 1 and 2 and Portion of Phase Area 3)
4.3 Build Alternative 2 (Phase Areas 1 and 2 and Portion of Phase Area 3)
4.4 Build Alternative 1 (Phase Area 3)
4.5 Build Alternative 2 (Phase Area 3)
4.6 Roundabout (Phase Area 3)
4.7 Alternatives Evaluation
5. PRELIMINARY DESIGN ANALYSIS
5.1 Typical Sections
5.2 Bicycle and Pedestrian Accommodations
5.3 Right-of-Way Requirements
5.4 Drainage Analysis for Treatment and Attenuation
5.5 Floodplain Compensation Analysis
5.6 Drainage Map Hydrology
5.7 Sea Level Rise Analysis
5.8 Drainage Structures and Pipes Analysis
a. Phase Area 1
b. Phase Area 2
c. Phase Area 3
5.9 Utility Impacts
5.10 Permitting
5.11 Tree and Landscape Analysis
5.12 Design Variation and Exceptions
5.13 Social and Economic Impacts Analysis
5.14 Wetlands and Surface Waters
5.15 Cultural Resource Assessment
5.16 Probable Construction Cost Estimates
6. PUBLIC INVOLVEMENT/PROJECT COORDINATION
FIGURES
Figure 1 – Project Location and Phase Areas
Figure 2 – Existing Typical Section. Rural Roadway with Swales and Non-Continuous Sidewalks
Figure 3 – Potential Trail Connections
Figure 4 – PSTA Route Map
Figure 5 – Existing Right-of-way
Figure 6 – Soils Map including Organics and Seasonal High Water Table
Figure 7 – 2009 Pinellas County Railway Network
Figure 8 – Future Land Use (Tarpon Springs)
Figure 9 – Future Land Use (Pinellas County)
Figure 10 – Future Land Use (Pinellas County)
Figure 11 – Drainage Flows and Outfalls
Figure 12 – Existing Drainage Photo Locations and Numbers
Figure 13 – Phase Area 1 - Just West of Alternate US 19 on the South Side
Figure 14 – Phase Area 1 - Approaching Outfall 1 Around the Curve
Figure 15 – Phase Area 1 – Center Avenue Depressional Area
Figure 16 – Phase Area 2 – Roadside Ponding
Figure 17 – Phase Area 2 – Anclote Road Approaching Curve
Figure 18 – Phase Area 2 – Savannah Avenue
Figure 19 – Phase Area 3 – Outfall 4 Hazard
Figure 20– Phase Area 3 – Wacassassa Street
Figure 21 – Phase Area 3 – Standing Water
Figure 22 – FEMA 100-Year Flood Plain
Figure 23 – High and Medium Ranking Contamination Sites
Figure 24 – No Build Typical Section
Figure 25 – Build Alternative 1 Typical Section (Phase Areas 1 and 2 and Portion of 3)
Figure 26 – Build Alternative 2 Typical Section (Phase Areas 1 and 2 and Portion of 3)
Figure 27 – Build Alternative 1 Typical Section (Phase Area 3)
Figure 28 – Build Alternative 1 Typical Section (Phase Area 3)
Figure 29 – Right-of-way – Existing
Figure 30 – Potential Pond Locations in Each Phase Area
Figure 31 – Graphic Relative Sea Level Change (RSLC) Scenarios for St. Petersburg, Florida, Figure 32 – Sea Level Change, Relative to the Year 2000 for St. Petersburg, FL
Figure 33 – Sea Level Rise Projection (2050)
Figure 34 – Sea Level Rise Projection (2070)
Figure 35 – Wetland Map
TABLES
Table 1 - Summary of Soil Groups within the Anclote Road Improvement Corridor
Table 2 – Percentage of Soil Groups within the Anclote Road Improvement Corridor
Table 3 - Summary of Utility / Agency Owners (UAOs)
Table 4 – Existing Cross Drains
Table 5 - Design Criteria Table
Table 6 - Alternative Evaluation Table
Table 7 - Potential Right-of-way Land Acquisition Requirements
Table 8 – Treatment and Attenuation Regulations
Table 9 – BMP Viability Rankings
Table 10 – Nitrogen and Phosphorus Load Reduction (Swales Only)
Table 11 – Nitrogen and Phosphorus Load Reduction (Swales to Detention Pond)
Table 12 – Offsite Pond Sizes and Estimated Cost
Table 13 – Floodplain Impacts
Table 14 – Summary of Tree Impacts
Table 15 – Roadway Alternative 1 Wetland/Surface Water Acreage
Table 16 – Roadway Alternative 2 Wetland/Surface Water Acreage
Table 17 – Potential Pond Sites FLUCFCS Acreage
Table 18 – Probable Construction Costs
APPENDICES
APPENDIX A – Concept Plans Set (Build Alternative 1)
APPENDIX B – Concept Plans Set (Build Alternative 2)
APPENDIX C – Colored Roll Plans Set (Build Alternative 1)
APPENDIX D – Colored Roll Plans Set (Build Alternative 2)
APPENDIX E – Concept Plans Sets (Center Avenue, Savannah Avenue, Brady Road and Roundabout)
APPENDIX F – Geotechnical
APPENDIX G – Transportation/Traffic Analysis
APPENDIX H – Contamination
APPENDIX I – Cultural Resources
APPENDIX J – Watershed Basin Map and Areas
APPENDIX K – Stormwater, Water Quality and Floodplain Calculations
APPENDIX L – Florida DEP Sea-Level Impact Projection (SLIP) Study
APPENDIX M – Wetlands and Surface Waters
APPENDIX N – Probable Construction Cost Estimates
APPENDIX O – Public Meeting Information
1. INTRODUCTION
Pinellas County retained Pennoni to prepare a Preliminary Engineering Report (PER) to address roadway, drainage, pedestrian, and bicyclist safety concerns in the Anclote Road corridor between Anclote
Boulevard and Alternate US 19.
1.1 Project Description
The project area currently experiences localized flooding along Anclote Road, Center Avenue, Savannah
Avenue, and other locations along the project limits. The existing roadway pavement in many locations is also in poor condition and requires rehabilitation. The project area has numerous adjacent sites of environmental concern and discharges to the Anclote River.
Anclote Road is a continuous 2.4-mile two-lane collector road serving under-developed industrial and commercial areas, employment centers, and residential areas in unincorporated Pinellas County and the
City of Tarpon Springs. The County has identified this area as a Target Employment Center for economic development, allowing increased density for uses such as manufacturing, office, and research & development. Forward Pinellas Target Employment and Industrial Land Study (TEILS) 2022 update identifies the project area as a "Local" Target Employment Center defined as follows: TEC Local – These areas house smaller scale manufacturers and artisan users with industrial and warehouse space needs.
The TEC Local designation would allow for flex-space and mixed-use in conjunction with local sub-area planning efforts (visioning studies, special area plans, etc.).
The transportation objectives for improving this corridor are to provide multimodal access to industrial, workforce, and residential areas, improve safety, and enhance stormwater management. The project will also provide improved access to Elfers and Coastal Anclote Trails.
1.2 Purpose and Need
1.2.1 Purpose
The Preliminary Engineering Report (PER) addresses pedestrian and bicyclist safety concerns by evaluating a combination of a 10-foot-wide shared-use path, sidewalks, and on-street bike lanes within the project limits. The PER also assesses improvements to the roadway and drainage in the corridor.
The report will assist the County in determining the scope, budget, and schedule of future improvements based on the following factors:
• Safety
• Right-of-way Constraints
• Utility Conflicts
• Drainage and Environmental Impacts
• Floodplain impacts
• Construction Costs
• Long Range Transportation Plan (LRTP) Consistency
1.2.2 Need
The need for improvements focuses on enhancing safety and mobility for all modes of transportation, including motor vehicles, pedestrians, and bicyclists. Residents and corridor users have identified multiple areas of concern:
• Improved corridor safety.
• Enhanced mobility throughout the corridor.
• Enhanced multimodal transportation.
• Improved drainage.
a. Safety
The posted speed limit on Anclote Road is 35 miles per hour. This roadway is a designated unrestricted truck route and an essential east-west collector roadway in Pinellas County's transportation network. There are limited pedestrian and bicycle amenities within the project limits. A total of 20 crashes were reported between 2019 and 2022. The crashes include eight injuries and 12 property damage-only crashes, with no fatal crashes reported.
b. Social and Economic Demands
The established community and businesses surrounding the project corridor have shaped the character of Anclote Road. The poor multimodal levels of service hinder economic development and prosperity in the study area. The County has identified this area as a Target Employment
Center for economic development, allowing increased density for uses such as manufacturing, office, and research & development.
c. Consistency with Transportation Plans
The Forward Pinellas 2045 LRTP identifies a network of sidewalks, bicycle lanes, and trails for
Pinellas County. Enhancing the multimodal accommodations along the Anclote Road corridor will connect multiple non-motorized facilities, and the proposed improvements align with the goals outlined in the 2045 LRTP.
1.2.3 Project Location and Phases
The project location and study phases are shown in Figure 1.
a. Phase Area 1
The limits are from Alternate US 19 to the intersection of Anclote Road and L&R Industrial
Boulevard, including outfalls. It also includes Center Avenue from Anclote Road to Fulton Street.
b. Phase Area 2
The limits are from the intersection of Anclote Road and L&R Industrial Boulevard to the intersection of Anclote Road and Wesley Avenue, including outfalls. It also includes Savannah
Avenue from Anclote Road to Brady Road and Brady Road to the Work Release Center.
c. Phase Area 3
The limits are from the 90-degree bend by Wesley Avenue and Anclote Road Intersection to
Anclote Boulevard, including outfalls.
Figure 1 – Project Location and Phase Areas
1.3 Related Projects, Studies, and Resources
• Anclote River Watershed Management Plan and Watershed Evaluation, 2023.
• Pinellas County and City of Tarpon Springs GIS sources.
2. EXISTING CONDITIONS
Anclote Road is a two-lane roadway and primarily serves as a vital east-west thoroughfare within Pinellas
County's transportation network, connecting Anclote Boulevard to Alternate US 19. The project area's future land uses include industrial, commercial, and residential developments. The project improvements will improve connections to businesses and residents and Alternate US 19. The area is growing, and undeveloped areas will provide additional employment growth opportunities.
2.1 Existing Roadway Characteristics
2.1.1 Location and Functional Classification
The project is in northern Pinellas County, and its limits extend along Anclote Road from Anclote Boulevard to Alternate US 19, covering approximately 2.4 miles with a posted speed of 35 mph and varying right-of-way. Anclote Road is classified as a collector road. The alignment has four 90-degree curves and no signalized intersections within the project limits.
2.1.2 Access Management
Anclote Road is a two-lane undivided roadway. Its layout permits non-restrictive access management, allowing turns at any point to enter side streets, businesses, or residential driveways within the project limits.
2.1.3 Evacuation Route
Anclote Road is not an evacuation route. Alternate US 19 is an evacuation route.
2.1.4 Typical Sections
The existing typical section for the Anclote Road corridor within the project limits consists of two 10-foot travel lanes accompanied by roadside swales and 5-foot non-continuous sidewalks along the roadway alignment (See Figure 2).
Figure 2 – Existing Typical Section. Rural Roadway with Swales and Non-Continuous Sidewalks
2.1.5 Pedestrian and Bicycle Facilities
Anclote Road has non-continuous 5-foot sidewalks with no bike lanes and paths throughout the corridor.
The project's primary goal is continuous connectivity from Anclote Boulevard to Alternate US 19. There are currently limited crosswalks or no signalized intersections within the project limits.
The improvements will allow for potential trial connections as separate projects to the Coastal Anclote
Trail and the Elfers Spur Trail (See Figure 3).
Figure 3 – Potential Trail Connections
2.1.6 Transit Facilities
The Pinellas Suncoast Transit Authority (PSTA) does not serve the Anclote Road study area. The closest transit route is Route 18, which operates on Alternate US 19 at the beginning of the project limits. This route provides bus service and follows Alternate US 19 north and south. PSTA also offers Routes 18, 66L, and JCT approximately 0.33 miles south of Anclote Road and Alternate US 19 (See Figure 4).
Figure 4 – PSTA Route Map
2.1.7 Existing Right of Way
The right-of-way varies from 40 to 73 feet (See Figure 5). Most right-of-way is 66 feet wide for Phase Areas
1 and 2. The right-of-way reduces to 40 feet wide just south of Wacassassa Street in Phase Area 3.
Figure 5 – Existing Right-of-way
2.1.8 Horizontal and Vertical Alignment
The existing horizontal alignment is east-west and north-south through four 90-degree curves starting at
Anclote Boulevard and ending at Alternate US 19. The topography within the corridor ranges from an elevation of 4 feet to an elevation of 14 feet. The vertical datum is NAVD 88. The County Transportation
Manual indicates that the minimum edge of pavement elevation should be five feet above mean sea level.
This requirement will significantly impact wetlands, floodplains, adjacent properties and right-of-way and should be further evaluated during the final design phase.
2.1.9 Geotechnical Data
A Web Soil Survey through the United States Department of Agriculture (USDA) Natural Resources
Conservation Service was utilized to identify the soil types within the project limits. Figure 6 represents the various soil types, organic soils, and seasonal high water table levels within the project limits. Table 1 shows the soil groups within the project limits. Table 2 was created to analyze the soil data further by establishing a 300-foot buffer (150 feet north and south of the Anclote Road centerline). The table indicates the soils within the project area, with the largest percentage comprising Astatula, Tavares Urban, Myakka Urban Land, Matlacha and St. Augustine Urban.
Certain soil types, such as clays, silts, and muck, characterized by poor drainage and organic content, are unfavorable for constructing the proposed culvert crossing before the first curve west of Alternate US 19.
These soils can potentially undergo shrinkage and swelling, posing challenges during construction. If encountered during construction, this soil type should be removed per FDOT Standard Plans Index 120-
002 and utilized per FDOT Standard Plans Index 120-001.
Figure 6 – Soils Map including Organics and Seasonal High Water Table
Table 1 - Summary of Soil Groups within the Anclote Road Improvement Corridor
SUMMARY OF USDA SOIL SURVEY
PINELLAS COUNTY, FLORIDA
USDA Map Symbol and Soil Name
Soil Classification pH
Seasonal High Water Table
Depth
(in) USCS AASHTO Permeability
(in/hr) Depth (feet)
Months
(3)
Anclote
0-16 SP, SP-SM A-2-4, A-3 6.0 - 20.0 5.6-7.8
+2.0-0.0
June-Dec
16-80 SM, SP, SP-SM A-2-4, A-3 6.0 - 20.0 5.6-7.8
0-3 SP, SP-SM A-3 20.0 - 50.0 4.5-6.5
(4) Astatula - Urban land
3-80 SP, SP-SM A-3 20.0 - 50.0 4.5-6.5 +2.0-0.0 June-Dec
INFORMATION NOT PROVIDED FOR URBAN LAND
(6) Basinger - Urban land
0-2 SP-SM, SM A-3, A-2-4 6.0 - 20.0 4.5-6.0
0.3-1.5
July-Oct
2-18 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0
18-36 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0
36-80 SP-SM, SM A-2-4, A-3 6.0 - 20.0 5.1-6.5
(13) Immokalee - Urban land
0-6 SP, SP-SM A-3 6.0 - 20.0 3.5-6.0
0.5-1.5
June-Nov
6-35 SP, SP-SM A-3 6.0 - 20.0 3.5-6.0
35-50 SM, SP-SM A-2-4, A-3 0.6 - 6.0 3.5-6.0
50-80 SP, SP-SM A-3 6.0 - 20.0 3.5-6.0
(16) Matlacha -
St. Augustine - Urban land
0-42 SP, SP-SM A-3 2.0 - 6.0 6.1-8.4
2.0-3.0
June-Oct
42-80 SP, SP-SM A-3 6.0 - 20.0 6.1-8.4
0-8 SP-SM, SP A-3 6.0 - 20.0 6.1-8.4
1.5-3.0
8-33 SP-SM A-2-4 2.0 20.0 6.1-8.4
33-48 SP, SP-SM A-3 6.0 - 20.0 6.1-8.4
48-63 SM, SP-SM A-2-4 2.0 20.0 6.1-8.4
63-80 SP-SM, SP A-3 6.0 - 20.0 6.1-8.4
INFORMATION NOT PROVIDED FOR URBAN LAND
USDA Map Symbol and Soil Name
Soil Classification pH
Seasonal High Water Table
Depth
(in) USCS AASHTO Permeability
(in/hr) Depth (feet)
Months
(17) Myakka - Urban land
0-4 SP, SP-SM A-3 6.0 - 20.0 3.5-6.5
0.5-1.5
June-Nov
4-22 SP, SP-SM A-3 6.0 - 20.0 3.5-6.5
22-36 SM, SP-SM A-2-4, A-3 0.6 - 6.0 3.5-6.5
36-80 SP, SP-SM A-3 6.0 - 20.0 3.5-6.5
(29)
Tavares - Urban land
0-6 SP-SM, SM A-3, A-2-4 6.0 - 20.0 3.5-6.0
1.5-3.5
6-80 SP-SM, SM A-3, A-2-4 6.0 - 20.0 3.5-6.0
(32) Wulfert, tidal
0-12 PT A-8 6.0 - 20.0 5.6-7.3
0.0
Jan-Dec 12-36 PT A-8 6.0 - 20.0 3.5-7.3
36-80 SM, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3
Table 2 – Percentage of Soil Groups within the Anclote Road Improvement Corridor
USDA
Map
Symbol
Hydrologic Soil Group
(HSG)
USDA Soil Name
Quantity (Acres)
Percent of Corridor
Total
4 A Astatula soils and Urban land, 0 to 5 percent slopes 57.27 48.5%
29 A Tavares fine sand and Urban land complex, 0 to 5 percent slopes 29.95 25.4%
17 A/D Myakka soils and Urban land 9.72 8.2%
16 B Matlacha and St. Augustine soils and Urban land 9.65 8.2%
6 A/D Basinger fine sand-Urban land complex, 0 to 2 percent slopes 3.86 3.3%
32 A/D Wulfert muck, tidal, 0 to 1 percent slopes 3.60 3.1%
3 A/D Anclote fine sand, depressional 1.76 1.5%
13 A/D Immokalee soils and Urban land 0.67 0.6%
6 A Tavares sand, 0 to 5 percent slopes 0.58 0.5%
The depths to the encountered groundwater table (when encountered) ranged from approximately 2.5 to 6.4 feet below the existing ground surface at the locations of the borings performed. The groundwater table was not encountered within the depths explored at some of the borings.
Based on a review of USDA soil information and the field exploration, the historical Seasonal High
Groundwater Table (SHGWT) levels within the project limits range from at or above the ground surface to
3½ feet below existing grades. According to the results of the borings performed for the project, the
SHGWT levels range from approximately ½ foot to greater than 5½ feet below existing grades. At the locations of borings SH-4 and SH-7, the SHGWT levels were not determined due to a general absence of geotechnical indicators in the soil samples. Refer to Appendix F for the geotechnical information.
2.1.10 Signalizations and Intelligent Transport System (ITS)
There are no signals within the project limits. Additionally, it is important to note that the Anclote Road improvement corridor currently lacks ITS infrastructure, and the Pinellas County ITS/ATMS Master Plan does not outline any future provisions for ITS infrastructure along Anclote Road.
2.1.11 Pavement Conditions
The geotechnical field exploration encountered asphalt pavement thicknesses ranging from approximately 1.0 to 10.0 inches underlain by base materials consisting of brick and/or limerock of varying thicknesses.
Based on visual observations and core locations, the pavement condition noted along the project alignment is "Fair" to "Poor" condition. The condition at each core location and core photographs are shown in Appendix F.
During the final design, the FDOT Flexible Pavement Design Manual and Pinellas County guidelines for road rehabilitation projects should be utilized to ensure an adequate Structural Number (SN) value is obtained based on the corresponding ESAL value over the design life of the roadway.
2.1.12 Railroads
There are no visible railroad tracks or crossings within the project limits. However, according to the 2009
Pinellas County Railway Network, a railway track that was within the project limits may now be abandoned
(See Figure 7).
Figure 7 – 2009 Pinellas County Railway Network
2.1.13 Utilities
Numerous utilities are located within the Anclote Road right of way from Anclote Boulevard to Alternate
US 19. The following utilities, shown in Table 3, exist within the limits of the Anclote Road Study Corridor.
Table 3 - Summary of Utility / Agency Owners (UAOs)
Utility/Agency Owner (UAO)
Utility Type(s) Primary Contact Alternate Contact
Charter Communications
Cable, Fiber Duffy McClelland
(352) 527-2189
USIC Dispatch Office
(800) 778-9140
City of Tarpon Springs Sewer, Water Willie Williams Howard Matthews
Clearwater Gas System Gas Jacinta Garcia Corcoba
(727) 422-9998
Gregg Kunz
(727) 224-7311
Duke Energy St. Petersburg
Electric Duke's Customer Service Center
(407) 629-1010
USIC Dispatch
(800) 778-9140
Duke Energy Sub Aqueous
Electric Duke's Customer Service Center 407-629-1010
USIC Dispatch
(800) 778-9140
Florida Governmental Utility Authority (FGUA)
Water David Gillette
(727) 372-0115
Pamela Yacobelli
(727) 372-0115
Frontier Communications
CATV and Communication Lines
Kyle Perkins
(727) 313-6167
Craig Ellison, USIC
(800) 575-5594
Knology Broadband of Florida (DBA Wide Open West-Wow)
Fiber Richard Laganga
(727) 422-8040
Tito Aquino/ Orenza Merritt (Emergency Contact)
(727) 501-3709
Pasco County Utilities Reclaimed Water, Sewer, Water
George Demint
(813) 235-6189 x6940
Ralpheal Ubertaccio 727-992-4236
Uniti Fiber, LLC Fiber Charlie Croft
(251) 214-7059
NOC Uniti Fiber
(877) 652-2321
2.1.14 Bridges and Culvert Cross Drain Structures
There are no bridges within the project limits. Cross drains within the project limits range from 24 inches to 42 inches. Refer to Section 2.1.20 for additional information.
2.1.15 Lighting
The intersections along Anclote Road at Anclote Boulevard, L&R Industrial Boulevard, and Alternate US
19 within the project limits have high-pressure sodium or metal halide lighting.
2.1.16 Land Use
Existing land use in the area varies throughout the project limits. Residential development, including single-family residences and Hickory Point Mobile Home Park, is most common from south of Anclote Blvd to Meyers Cove Drive. Two large undeveloped parcels owned by Stauffer Management Company LLC are located north and south of Anclote Road from Myers Cove Drive to the turn near Wesley Avenue between
Savannah Avenue and Windy Bay.
A recent residential development, with light industrial and commercial land uses, characterizes this section of the project corridor. Residential and commercial development, primarily boat storage and marina services, occur in the remaining section of the project corridor.
Anclote Road provides a key connection for businesses and residents to Alternate US 19. Future land use is consistent with existing land use. Large areas are designated for industrial uses, and undeveloped areas provide opportunities for employment growth in the County.
Tarpon Springs's future land use is shown in Figure 8, and Pinellas County's future land use is shown in
Figure 9.
Figure 8 – Future Land Use (Tarpon Springs)
Figure 9 – Future Land Use (Pinellas County)
ANCLOTE BLVD
ANCLOTE ROAD
ANCLOTE BLVD
ANCLOTE ROAD
2.1.17 Target Employment Centers for Economic Development
The project corridor is located within a Target Employment Center for economic development, as shown in Figure 10. This designation permits a 100% floor area ratio intensity bonus for manufacturing, office, and research and development uses.
Figure 10 – Future Land Use (Pinellas County)
2.1.18 Traffic and Levels of Service
According to Forward Pinellas's 2021 Facility Level of Service Report, the Average Annual Daily Traffic for
Anclote Road from Anclote Boulevard to Alternate US 19 is 3,200 vehicles per day. Level of Service (LOS) was calculated using guidelines identified by the FDOT Quality/Level of Service Handbook, FDOT
Generalized Tables, FDOT ArtPlan, and the Highway Capacity Manual. Based on these traffic counts, the current Level of Service (LOS) for Anclote Road is "C." For the Anclote Road and Alternate US 19, the through movements have a LOS from "D" to "F," according to the report (See Appendix G).
2.1.19 Transportation and Traffic Analysis
Field reviews were conducted to observe traffic flow, identify existing traffic control, and note general operations at all roadway segments and intersections within the project limits. A GIS application was utilized to record (and photograph) safety, traffic operations, and design issues associated with the project and to consider incorporating enhanced safety elements for all users along Anclote Road. A link to this field review database and graphical presentation is provided here:
https://gis.pennoni.com/portal/apps/webappviewer/index.html?id=482c6c0fe7a44203b2ba546c79b86
025.
Refer to Appendix G for the project Transportation/Traffic Analysis.
2.1.20 Existing Drainage
The project area currently experiences localized flooding along Anclote Road, Center Avenue, Savannah
Avenue, and other locations along the project limits.
The existing rural roadway drains via roadside swales, storm pipes, and outfalls (See Figure 11).
a. Phase Area 1
Anclote Road and Highland Avenue intersection is the high point elevation of 14.07 feet along the eastern portion of Phase Area 1. To the east of Highland Avenue, the drainage flows along the edge of the roadway and shallow swales to the intersection of Alternate US 19. There is a low point just west of Alternate US 19, and the water is ponding on the south side of Anclote Road at
Station 424+50. Alternate US 19 is an FDOT roadway with a storm system discharging to Outfall 1 that drains south to the Anclote River.
To the west of Highland Avenue, the drainage flows via inlets, side drains and swales to the wetland area east of Outfall 2 at Station 404+75.
From the Anclote Road and L&R Industrial Boulevard intersection, the drainage flows south via inlets, side drains and swales to a 24-inch cross drain at Station 210+10 and discharges to the tidal wetland area on the east side.
https://gis.pennoni.com/portal/apps/webappviewer/index.html?id=482c6c0fe7a44203b2ba546c79b86025 https://gis.pennoni.com/portal/apps/webappviewer/index.html?id=482c6c0fe7a44203b2ba546c79b86025
The segment from Station 400+26 to 407+23 will drain to Outfall 2 at Station 404+75 via inlets, side drains and swales.
Outfall 2 is a 42-inch corrugated metal pipe, and the area to the north is a tidal wetland. The outfall area also has organic soils based on the geotechnical investigation that need consideration when replacing the corrugated metal pipe.
Center Avenue is experiencing localized flooding between Anclote Road and Fulton Street due to depressional areas at Station 12+79 and a lack of drainage inlets and pipes.
Figure 11 – Drainage Flows and Outfalls
b. Phase Area 2
From north of the Anclote Road and Wesley Avenue intersection at Station 47+69, the drainage flows south via roadside swales, inlets, and storm pipes to Outfall 3 at Station 71+58.
From west of the Anclote Road and L&R Industrial Boulevard intersection at Station 92+12, the drainage flows west via roadside swales, inlets, and storm pipes to Outfall 3.
Outfall 3 is a 60-inch reinforced concrete pipe draining south to the Anclote River.
Savannah Avenue is experiencing localized flooding between Anclote Road and Brady Road due to the lack of drainage inlets and pipes. The flow is from Brady Road to Anclote Road and discharges to Outfall 3.
c. Phase Area 3
This Phase Area has an inadequate drainage system and narrow right-of-way. The drainage from the Anclote Road and Anclote Boulevard intersection at Station 11+13 drains southeast along the roadway edge to a depressional area at the Wacassassa Street intersection at Station 17+30. The roadway from approximately Station 27+72 also drains northwest along the roadway edge and shallow swales to the Wacassassa Street intersection.
The drainage from the 90-degree bend just north of Wesley Avenue at Station 47+69 drains west via shallow swales to Outfall 4.
Outfall 4 consists of triple 24-inch reinforced concrete cross drains (Station 30+75) and a single
24-inch reinforced concrete cross drain (Station 30+90) discharging south to the Anclote River.
Existing cross drains within the project limits are listed in Table 4.
Table 4 – Existing Cross Drains
Phase Area Approximate Station Culvert Type Culvert Size
1 404+75 CMP 1 - 42-inch
1 210+10 RCP 1 – 24-inch
3 30+90 RCP 1 – 24-inch
3 30+75 RCP 3 – 24-inch
Figures 12 to 21 depict the condition of the existing drainage system following Tropical Storm Cristobal, which occurred from June 4 to 8 and delivered an accumulated rainfall of approximately 7 inches.
Figure 12 – Existing Drainage Photo Locations and Numbers
Figure 13 – Phase Area 1 - Just West of Alternate US 19 on the South Side
(Looking West)
Figure 14 – Phase Area 1 - Approaching Outfall 1 Around the Curve
(Looking East)
Figure 15 – Phase Area 1 – Center Avenue Depressional Area
(Looking South)
Figure 16 – Phase Area 2 – Roadside Ponding
Figure 17 – Phase Area 2 – Anclote Road Approaching Curve
Figure 18 – Phase Area 2 – Savannah Avenue
Figure 19 – Phase Area 3 – Outfall 4 Hazard
Figure 20– Phase Area 3 – Wacassassa Street
(Looking North)
Figure 21 – Phase Area 3 – Standing Water
(Looking North)
2.1.21 Existing Floodplains
The Anclote Road corridor is within a designated Federal Emergency Management Administration (FEMA)
100-year flood zone. Figure 22 illustrates that a significant portion of the study corridor falls under the
Special Flood Hazard Area (SFHA) classification, specifically identified as "AE." SFHAs represent areas prone to flooding, with a 1-percent chance of being equaled or exceeded in any given year. The FEMA
100-Year Base Flood Elevation (BFE) varies within the corridor, ranging from approximately 10 ft at Anclote
Boulevard to 8 ft at Alternate US 19.
Figure 22 – FEMA 100-Year Flood Plain
2.1.22 Impaired Water Body
The project area has numerous adjacent sites of environmental concern and discharges to Anclote River.
The project area water body is identified as WBID 1440 by the Florida Department of Environmental
Protection (FDEP). This waterbody is not impaired for nutrients because the annual geometric means did not exceed the nutrient threshold more than once in a three-year period. However, it will remain in category 4e (Ongoing Restoration) because it has not attained the magnitude of the criterion for the three most recent consecutive years. It is assessed in category 4e because there are ongoing restoration activities to address the nutrient impairment. The Anclote River Watershed 4e Plan includes pollutant control measures to address the nutrient impairment in the Anclote River Estuary. This parameter will remain on the 303(d) List.
2.1.23 Contamination
A contamination Level 1 evaluation was performed in accordance with Part 2, Chapter 20 of the Florida
Department of Transportation's Project Development and Environment Manual (July 1, 2020). Along
Anclote Road, one site had a high ranking (Stauffer Chemical Co), and two had a medium ranking (Former
Gasoline Station/Tarpon Trading Company and Port Tarpon Marina Associates). Refer to Figure 23 and
Appendix H.
Figure 23 – High and Medium Ranking Contamination Sites
During the final design phase, additional review is recommended in consideration of dewatering operations that may be necessary under the National Pollutant Discharge Elimination System Generic
Permit for Stormwater Discharges from Large and Small Construction Activities. Verification testing may be warranted for contamination issues within 500 feet of the dewatering area.
During construction, if abnormal conditions are encountered or exposed indicating the presence of contaminated materials, these contamination areas should be managed in accordance with FDOT
Specification 120-1.2 Unidentified Areas of Contamination or similar guidelines the County may have in place.
3. DESIGN CONTROLS AND CRITERIA
3.1 Design Criteria
Design criteria were developed for the proposed multimodal transportation improvements based on the
Manual of Uniform Minimum Standards for Design, Construction and Maintenance of Streets and
Highways (Commonly known as the Florida Greenbook). The Anclote Road project corridor is functionally classified as a collector, with a posted and design speed of 35 mph. Table 5 summarizes the design criteria for the shoulder/sidewalk and shared-use path improvements, respectively.
References:
• Florida Greenbook = Manual of Uniform Minimum Standards for Design, Construction and
Maintenance for Streets and Highways (2023 Draft Edition)
• MUTCD for Streets and Highways, FHWA (2009)
• A Policy on Geometric Design of Highways and Streets, AASHTO (2018)
• FDOT Design Standards (2023)
• Pinellas County Standard Technical Specifications for Roadway and Related Construction, Pinellas
County (2022)
• Pinellas County Stormwater Manual (2021)
• Pinellas County Transportation Design Manual (2021)
Table 5 - Design Criteria Table
DESIGN CRITERIA SUMMARY TABLE
Functional Classification Minor Arterial Context Classification C4 - Urban General Posted Speed 35 MPH Design Speed 35 MPH
DESIGN ELEMENT FLORIDA GREENBOOK 2023 DRAFT REFERENCE - FLORIDA
GREENBOOK 2023 DRAFT
PROPOSED
DESIGN
Travel Lane Width 11' (10' in constrained conditions) Ch 3 Table 3-20 – (p. 3-44) 11'
Keyhole Lanes 5' min. Ch 9 Figure 9-13 (p. 9-16) 5' min.
Bike Lanes 4' min. without curb and gutter Ch 9 Figure 9-1 (p. 9-3) 4'
Roadway Shoulder Width 8' min. Ch 3 Table 3-21 (p. 3-47) 8' Roadway Shoulder Cross Slope 2%-6% (paved)
4%-6% (Gravel/crushed rock) 6%-8% (Turf)
Ch 3 Table 3-22 (p. 3-48) 6%
Sidewalk Width 5' min. Ch 8 Section B.1 (p. 8-2) 5' min.
Roadway Clear Zone Width 14' (1V:6H or flatter)
16’ (1V:5H to 1V:4H or flatter) Ch 4 Table 4-1 (p. 4-6) 16'
Cross Slope (sidewalk) 2% Ch 8 Section B.1 (p. 8-3) 2% max.
Sidewalk Grade 5% max. Ch 8 Section B.1 (p. 8-3) 5% max.
Sidewalk Clear Graded Area 1' min. (1:6 max.) Ch 8 Section B.1 (p. 8-2) 2' (1:6 max.)
Roadway Clear Zone Slopes 1:4 or flatter (Recoverable slope) Steeper than 1:4 but flatter than 1:3 (non-recoverable slope) Steeper than 1:3 (Critical slope) A slope of 1:4 or flatter should be used, desirably 1:6 or flatter
Ch 4 Section B.1.a (p. 4-4)
1:4
Roadway Ditch Front Slopes Not Steeper than 1:3 Ch 4 Figure 4-4 & 4-5 (p. 4-10 and 4- 11)
1:4
Roadway Ditch Back Slopes Not Steeper than 1:3 Ch 4 Figure 4-4 & 4-5 (p. 4-10 and 4- 11)
1:3
Shared-use Path Width 10' min. (8' is allowed in rare circumstances) Ch.9 Section C.1 (p. 9-36) 10'
Horizontal Clearance (Shared-use Path)
A wider separation should be considered when the path is adjacent to canals, ditches, or slopes steeper than 1:3. A minimum 5-foot separation from the edge of the path pavement to the top of the slope is desirable.
Ch.9 Section C.1 (p. 9-36 and 9-37) 3' min.
Horizontal Clearance (Shared-use Path)
A minimum 2-foot wide graded, clear area with a maximum 1:6 slope shall be maintained adjacent to both sides of the path; however, 3 feet or more is desirable to provide clearance from trees, poles, walls, fences, guardrails, or other lateral obstructions.
Ch.9 Section C.1 (p. 9-36) 3' min.
Shared-use Path Vertical Clearance
8' min (10' desirable) Ch.9 Section C.1 (p. 9-36 and 9-37) 8' min.
Cross Slope (Shared-use Path) 2% max. Ch.9 Section C.1 (p. 9-39) 2% max.
Shared-use Path Grade 5% max. Ch.9 Section C.1 (p. 9-39) 5% max.
Shared-use Path Clear Graded Area
2' (1:6 max.) Ch 9 Section C.1 (p. 9-36) 2' (1:6 max.)
Shared-use Path Design Speed
18 MPH Ch 9 Section C.3 (p. 9-38) 18 MPH
The minimum distance between a guardrail and a drop-off
2' min. Ch 8 Figure 8-4 (p. 8-13) 2' min.
*Page number is the manual page number of FLORIDA GREENBOOK 2023 DRAFT
4. ALTERNATIVE ANALYSIS
Two main alternatives were evaluated for the improvement of the Anclote Road corridor. These alternatives are as follows:
• No Build: This alternative involves keeping the two-lane rural roadway section along the project limits and non-continuous sidewalks at various locations.
• Alternative 1 (Phase Areas 1 and 2 and Portion of Phase Area 3): This alternative entails constructing two 11-foot lanes, a 10-foot-wide shared-use path, and a 5-foot sidewalk where feasible.
• Alternative 2 (Phase Areas 1 and 2 and Portion of Phase Area 3): This alternative entails constructing two 11-foot lanes, a 4-foot paved shoulder as an on-street bike lane, and 5-foot sidewalks.
• Alternative 1 (Phase 3): This alternative entails constructing two 11-foot lanes, Type F curb, and a 6 to 8-foot sidewalk from Anclote Boulevard to approximately 290 feet south of Wacassassa
Street.
• Alternative 2 (Phase 3): This alternative entails constructing two 10-foot lanes, Type F curb, 4-foot bike lanes, and a 6-foot sidewalk from Anclote Boulevard to approximately 290 feet south of
Wacassassa Street.
The following section will discuss each alternative's advantages, disadvantages, impacts, and costs.
Additionally, a comparison will be made among the different alternatives to determine the most suitable option. Refer to Appendices A through D.
4.1 No Build Alternative
The existing typical section for the Anclote Road corridor within the project limits consists of two 10-foot travel lanes accompanied by roadside swales and 5-foot non-continuous sidewalks along the roadway alignment.
The No Build Conditions alternative includes the following features:
• No new construction costs.
• Rural roadway.
• Existing two 10-foot lanes.
• 5-foot wide sidewalk only at certain locations.
• Roadside swales.
• Limited drainage.
The typical section for the No Build alternative is shown in Figure 24.
Figure 24 – No Build Typical Section
The advantages of the No Build Alternative include:
• No new construction costs.
• No impacts on the existing utilities.
• No disruption to the existing land uses during construction.
• No disruption to traffic due to construction activities.
• No potential right-of-way acquisitions or relocations due to the need for additional stormwater management or floodplain compensation facilities.
• No environmental degradation or disruption of natural resources.
The disadvantages of the No Build Alternative include, but are not limited to, the following:
• It is inconsistent with the Pinellas County Long Range Transportation Plan (LRTP).
• Does not enhance safety in the corridor.
• Does not enhance pedestrian and bicycle accommodations.
• Does not address localized drainage flooding.
4.2 Build Alternative 1 (Phase Areas 1 and 2 and Portion of Phase Area 3)
The Build Alternative 1 entails constructing two 11-foot lanes, a 10-foot-wide shared-use path, and a 5-foot sidewalk where feasible. This alternative aims to connect pedestrians and bicyclists continuously within Phase Areas 1 and 2 and a portion of 3. The typical section for the alternative is shown in Figure
25.
Figure 25 – Build Alternative 1 Typical Section (Phase Areas 1 and 2 and Portion of 3)
Certain advantages are associated with this alternative, including:
• Provides a consistent connection along the project corridor.
• Provides a connection to the work release center and adjacent trails.
• Enhances multimodal levels of service on the existing roadway network.
• Improves safety for non-motorized traffic.
• Consistent with the Pinellas County Long Range Transportation Plan (LRTP).
• Rehabilitates the roadway pavement and base.
• Improves drainage.
The disadvantages of the Build Alternative include, but are not limited to, the following:
• High construction costs.
• Impacts on the existing utilities.
• Disruption to the existing land uses during construction.
• Disruption to traffic due to construction activities.
• Removal of trees.
• Potential land acquisition for offsite facilities to meet flood compensation, flood control, and water quality requirements.
4.3 Build Alternative 2 (Phase Areas 1 and 2 and Portion of Phase Area 3)
The Build Alternative 2 entails constructing two 11-foot lanes, a 4-foot paved shoulder as an on-street bike lane, and 5-foot sidewalks. This alternative aims to connect pedestrians and bicyclists continuously within Phase Areas 1 and 2 and a portion of 3. The typical section for the alternative is shown in Figure
26.
Figure 26 – Build Alternative 2 Typical Section (Phase Areas 1 and 2 and Portion of 3)
• Provides a connection to the work release center and adjacent trails.
• Enhances multimodal levels of service on the existing roadway network.
• Improves safety for non-motorized traffic.
• Consistent with the Pinellas County Long Range Transportation Plan (LRTP).
• Rehabilitates the roadway pavement and base.
• Improves drainage.
The disadvantages of the Build Alternative include, but are not limited to, the following:
• High construction costs.
• Impacts on the existing utilities.
• Disruption to the existing land uses during construction.
• Disruption to traffic due to construction activities.
• Removal of trees.
• More roadway impervious area than Alternative 1.
• Potential land acquisition for offsite facilities to meet flood compensation, flood control, and water quality requirements.
4.4 Build Alternative 1 (Phase Area 3)
The Build Alternative 1 for Phase Area 3 entails constructing two 11-foot lanes, Type F curb, and a 6- to
8-foot sidewalk from Anclote Boulevard to approximately 290 feet south of Wacassassa Street and then transitions to Phase Area 2 typical section. This alternative aims to connect pedestrians and bicyclists continuously within Phase Area 3. The typical section for the alternative is shown in Figure 27.
Figure 27 – Build Alternative 1 Typical Section (Phase Area 3)
Anclote Boulevard to approximately 290 feet south of Wacassassa Street
• Enhances multimodal levels of service on the existing roadway network.
• Improves safety for non-motorized traffic.
• Consistent with the Pinellas County Long Range Transportation Plan (LRTP).
• Rehabilitates the roadway pavement and base.
• Improves drainage.
The disadvantages of the Build Alternative include, but are not limited to, the following:
• High construction costs.
• Impacts on the existing utilities.
• Disruption to the existing land uses during construction.
• Disruption to traffic due to construction activities.
• Removal of trees.
• Potential land acquisition for offsite facilities to meet flood compensation, flood control, and water quality requirements.
• Potential negative impact on the proposed Anclote Village Local Historic District.
4.5 Build Alternative 2 (Phase Area 3)
The Build Alternative 2 for Phase Area 3 entails constructing two 10-foot lanes, Type F curb, 4-foot bike lanes, and a 6-foot sidewalk from Anclote Boulevard to approximately 290 feet south of Wacassassa Street and then transitions to Phase Area 2 typical section. This alternative aims to connect pedestrians and bicyclists continuously within Phase Area 3. The typical section for the alternative is shown in Figure 28.
Figure 28 – Build Alternative 1 Typical Section (Phase Area 3)
Anclote Boulevard to approximately 290 feet south of Wacassassa Street
• Enhances multimodal levels of service on the existing roadway network.
• Improves safety for non-motorized traffic.
• Consistent with the Pinellas County Long Range Transportation Plan (LRTP).
• Rehabilitates the roadway pavement and base.
• Improves drainage.
The disadvantages of the Build Alternative include, but are not limited to, the following:
• High construction costs.
• Impacts on the existing utilities.
• Disruption to the existing land uses during construction.
• Disruption to traffic due to construction activities.
• Removal of trees.
• More roadway impervious area than Alternative 1.
• Potential land acquisition for offsite facilities to meet flood compensation, flood control, and water quality requirements.
• Potential negative impact on the proposed Anclote Village Local Historic District.
4.6 Roundabout (Phase Area 3)
A roundabout was evaluated at the Anclote Road and Anclote Boulevard intersection (Refer to Appendix
E). The advantages include improved traffic flow, reduced delay, reduced severity of collisions, fewer conflict points and pedestrian safety. The disadvantages include construction costs, right-of-way requirements, driver confusion, higher speed entry, emergency vehicle access, increased complexity, and more challenging navigation for pedestrians and cyclists. The roundabout will extend into Pasco County, requiring several full property takes to construct it. The discharge goes south to the Anclote River.
4.7 Alternatives Evaluation
A comparison matrix has been developed for the alternatives. Nine criteria were used to evaluate each alternative: pedestrian accommodations, bicycle accommodations, level of service, safety improvements, utility impacts, drainage impacts, right-of-way impacts, permitting, and project cost (See Table 6).
The following rankings were used to evaluate the impacts by alternative: no change, low, medium, and high.
For the level of service, the rankings used were no change, decrease, increase, and more study. The following ratings were assigned for pedestrian and bicycle accommodations: no change and improved.
Table 6 - Alternative Evaluation Table
Evaluation Factors
No Build Alternative 1
(Phase Areas 1&2) Alternative 2
(Phase Areas 1&2) Alternative 1
(Phase Area 3) Alternative 2
(Phase Area 3)
Be ne fit s
Pedestrian Accommodations No Change Improved Improved Improved Improved
Bicycle Accommodations No Change Improved Improved Improved Improved
Level of Service/Operation No Change No Change No Change No Change No Change
Safety Improvements No Change Medium Medium Medium Medium
Pr op er ty
Im pa ct s
Utility Impacts No Change Medium Medium Medium Medium
Drainage Impacts No Change Medium High Medium High
Right-of-Way Impacts No Change Medium Medium Low/Medium Low/Medium
Pe rm itt in g
Stormwater/Environmental Permitting No Change Medium High Medium High
Co st
Probable Construction Cost No Change High
(16.82M) High
(16.87M) High
(6.51M) High
(6.24M)
Note: The probable construction cost estimate for the roundabout is $1.32M, in addition to the above costs in Phase Area 3. The probable construction cost estimate for Center Avenue, Savannah Avenue and Brady Road is $1.36M in addition to the above costs.
5. PRELIMINARY DESIGN ANALYSIS
5.1 Typical Sections
Refer to Section 4 for a discussion and graphical representation of the No Build and Build typical sections.
Two main alternatives were evaluated for the improvement of the Anclote Road corridor. These alternatives are as follows and shown in Appendices A through D.
• No Build: This alternative involves keeping the two-lane rural roadway section along the project limits and non-continuous sidewalks at various locations.
• Alternative 1 (Phase Areas 1 and 2 and Portion of Phase Area 3): This alternative entails constructing two 11-foot lanes, a 10-foot-wide shared-use path, and a 5-foot sidewalk where feasible.
• Alternative 2 (Phase Areas 1 and 2 and Portion of Phase Area 3): This alternative entails constructing two 11-foot lanes, a 4-foot paved shoulder as an on-street bike lane, and 5-foot sidewalks.
• Alternative 1 (Phase 3): This alternative entails constructing two 11-foot lanes, Type F curb, and a 6 to 8-foot sidewalk from Anclote Boulevard to approximately 290 feet south of Wacassassa
Street.
• Alternative 2 (Phase 3): This alternative entails constructing two 10-foot lanes, Type F curb, 4-foot bike lanes, and a 6-foot sidewalk from Anclote Boulevard to approximately 290 feet south of
Wacassassa Street.
5.2 Bicycle and Pedestrian Accommodations
All alternatives except Alternative 1 (Phase 3) offer cyclists a seamless route on the shared-use path, allowing them to bike from Alternate US 19 to Anclote Boulevard without interruption. Due to the constrained 40-foot wide right-of-way in Phase Area 3, only a wider sidewalk is possible for Alternative 1
(Phase 3). In this segment, the bicyclist can use the sidewalk or share the roadway due to no dedicated bike lanes. A sidewalk is proposed along Savannah Avenue and Brady Road to the work release center.
Pedestrians can use the shared-use path or sidewalk, providing continuous connectivity from Alternate
US 19 to Anclote Boulevard.
5.3 Right-of-Way Requirements
The proposed improvements will have potential right-of-way land acquisition for offsite facilities to meet roadway standards, floodplain compensation and water quality requirements. The existing right-of-way within the project limits varies from a width of 40 feet to 73 feet. Refer to Figure 29 and Appendix N for additional right-of-way and offsite pond requirements and probable costs. Table 7 summarizes the potential right-of-way land acquisition requirements and probable costs for the project improvements.
Figure 29 – Right-of-way – Existing
Table 7 - Potential Right-of-way Land Acquisition Requirements
Description Residential (Square Feet)
Commercial, Industrial, Other (Square Feet)
Estimated Cost
Alternative 1 11,715 47,230 $1,167,555
Alternative 2 14,240 26,440 $768,840
Savannah Avenue 0 3,900 $81,900
Brady Road 0 4,100 $86,100
Roundabout 15,633 1,170 $259,065
Note: Includes estimated property cost only.
5.4 Drainage Analysis for Treatment and Attenuation
Rule 62-330.051(4)(c) of the Southwest Florida Water Management District (SWFWMD) regulations exempts the proposed shared-use path, sidewalk addition, and milling/resurfacing. These improvements are expected to meet the criteria outlined in Rule 62-330.451, eliminating the need for formal peak rate attenuation or formal water quality treatment.
The Pinellas County Stormwater Manual 2021, specifically Section 1.5.1 Exemptions, lists the following activities exempt from the manual's performance standards:
• Minor roadway safety construction, alteration, or maintenance, including road widening and shoulder paving that does not…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .