Lake Ferns Road Improvements
Solicitation number
ITB 25-PW-001
Issued by
Lake County, Florida

About this file

This is a Schedule of Unit Prices document for the City of Umatilla, Florida's Lake Ferns Road Industrial Park infrastructure improvement project (ITB-25-PW-001). The project encompasses comprehensive infrastructure development across approximately 19.835 acres, including construction of water lines, sewer lines, roadways, site grading, and stormwater management systems. The schedule details 67 line items organized into six categories: General (mobilization, permits, surveys, testing, traffic maintenance, and site protection); Site Work (clearing, earthwork, grading, and seeding); Roadway (asphalt, curbing, and signage); Storm (storm infrastructure including manholes, inlets, pipes, and concrete structures); Water (10-inch water mains, valves, hydrants, and appurtenances); and Sewer (4-inch force mains and related fittings). The mandatory pre-bid conference was held on January 16, 2025, at 2:00 p.m. in the City of Umatilla Council Chambers. Sealed bids were due by 2:00 p.m. on February 13, 2025, with City Council contract award anticipated on March 4, 2025, final approval on March 18, 2025, and Notice to Proceed prior to March 31, 2025.

Bidders must submit unit prices for each line item, with the understanding that unit prices represent the exact net amount per unit with no additional adjustments permitted for overhead, profit, insurance, or other direct or indirect expenses. The contract includes a 110% payment and performance bond requirement. The project is funded through $4.8 million in grant funding, with original project estimates at approximately $2.7 million. Bidders must provide a bid bond, corporate resolution, non-collusion affidavit, trench safety affidavit, proof of adequate insurance, and current licensing. Liquidated damages are assessed at $500 per calendar day for failure to meet project completion deadlines. The site presents environmental considerations including a 0.205-acre wetland area with a proposed 25-foot buffer zone and requires navigation of multiple soil types including Sparr, Immokalee, Pompano, and Wauchula.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item # Description Quantity Unit Unit Price Amount

GENERAL

1 Mobilization LS 2 NPDES Permit & Compliance LS 3 Construction Layout Survey LS 4 As-built Survey LS 5 Testing LS 6 Maintenance of Traffic LS 7 Silt Fence LF 8 Remove Chain Link Fence LF 9 Temporary Security Fence LF 10 6' Chain Link w/ Barb Wire LF 11 28' Double Swing Gate EA 12 Demo LS 13 Floating Turbidity Barrier LF

SUB-TOTAL

SITE WORK

14 Clear & Grubb ROW AC 15 Clear Ditch AC 16 Clear Site AC 17 Earthwork Cut CY 18 Earthwork Fill CY 19 Final Grading SY 20 Seed & Mulch SY 21 Sod SY

SUB-TOTAL

3. The Unit Prices shall represent the exact net amount per unit to be paid by the Contractor (in the case of additions or increases) or to be refunded by the Owner (in the case of decrease). No additional adjustments will be allowed for overhead, profit, insurance, or to other direct or indirect expenses of the Contractor or Subcontractors, and no additional adjustments will be allowed.

City of Umatilla Lake Ferns Road Industrial Park

Schedule of Unit Prices

1. It shall be the responsibility of the BIDDER to perform whatever tests and/or calculations as are necessary to determine quantities required for the performance of the work described herein.

2. Should certain additional work be required, or should the quantities submitted by the Contractor of certain classes of work be increased or decreased from those required by the Contract Documents, by authorization of the Owner, the unit prices contained in the following Schedule of Unit Prices shall, at the option of the Owner, be the basis of payment to the Contractor credit to the Owner, for such increase or decrease in the work.

ROADWAY

22 2" SP 9.5 Asphalt SY 23 8" Limerock SY 24 12" Stabilized Subgrade SY 25 12" Ribbon Curb LF 26 Type "F" Curb LF 27 Drop Curb LF 28 Street Signs EA 29 Pavement Marking LS

SUB-TOTAL

STORM

30 Storm Manhole EA 31 Type "F" Inlet w/ Skimmer EA 32 Type "F" Inlet EA 33 Type "F" Inlet w/ J Bottom EA 34 18" MES w/ Splash Pad EA 35 30" MES w/ Splash Pad EA

36 36" MES EA

37 18" RCP LF

38 24" RCP LF

39 30" RCP LF

40 36" RCP LF

41 24" CCP LF

42 Concrete Flume w/ Splash Pad EA 43 Concrete Weir LS 44 Enkamat 7020 SY 45 Concrete Jacket Index 425-001 EA

SUB-TOTAL

WATER

46 10" PVC Watermain LF

47 10" DIP LF

48 10" Gate Valve EA 49 10" Plug EA 50 10" 22.5° Bend EA 51 10" 45° Bend EA 52 10" 90° Bend EA 53 Fire Hydrant Assembly EA 54 Thrust Restraint EA 55 Pressure Test LS 56 Bactees LS

SUB-TOTAL

SEWER

57 4" PVC Force Main LF

58 4" DIP LF

59 4" x 12" Wet Tap w/ Tapping Sleeve &

Valve EA 60 4" 45° Bend EA 61 4" 90° Bend EA 62 4" Plug Valve EA 63 4" Wye EA 64 4" Cap EA 65 4" x 4" Tee EA 66 Pressure Test LS 67 Air Release Valve EA

Subtotal 110% Payment & Performance Bond Total Price

TOTAL BASE BID PRICE for the contract sum (Sum of items 1-66 and Bond)

(In Words) (In Figures)

Lake Ferns & N-S Road & Storm

File details come from the government source that posted it. Updated .