0016 12445123R0034 Construction Experience Questionaire Fillable.pdf

PDF 292 KB Posted

Attached to
USDA Forest Service NORTH CAROLINA CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC
Solicitation number
12445123R0034
Issued by

About this file

This solicitation requests proposals for a trail improvement project located on the Pisgah National Forest in North Carolina. Work will be broken into phases and includes constructing boardwalks, stairs, retaining walls, turnarounds, and viewing platforms to improve user safety and reduce erosion. Phase 1C focuses on building a series of boardwalks and stairs from an existing stair tower, along with clearing, hazard tree removal, and resurfacing 5,300 linear feet of trail. Proposals are due by July 18, 2023 with award being made as a firm-fixed price contract to the best value offer. The estimated value is between $500,000 to $1,000,000. The soliciting agency is the USDA Forest Service for NAICS code 237310.

View the file

Other files

File Type Posted
12445123R0034 Questions Asked As Of 07122023.doc DOC document
12445123R0034 Questions Asked As Of 07112023.doc DOC document
12445123R0034 Site Visit Registry 6.28.2023.pdf PDF
12445123R0034 Questions Asked As Of 07062023.doc DOC document
0004 CFT Supplemental_Specification_939.01 SIGNED.pdf PDF
0003 CFT Supplemental Specification 911-912.pdf PDF
12445123R0034 Complete Package.pdf PDF
0012 CFT Survey Controls.pdf PDF
0002 CFT Standard Trail Specifications.pdf PDF
0006 CFT Plan Set SIGNED.pdf PDF
0009 Catawba Falls Trail 6.15.2023 - Geotechnical Report Slide 3.pdf PDF
12445123R0034 Sched B_Terms and Conditions.pdf PDF
0005 CFT Supplemental_Specification_939.02 SIGNED.pdf PDF
0001 CFT Statement of Work_Catawba Falls Trail Phase 1C 6.12.2023.pdf PDF
0014 Davis-Bacon Act WD NC20230086.pdf PDF
12445123R0034 SF1442.pdf PDF
0008 Catawba Falls Trail 3.20.2023 - Phase 0 Slide 3 Gabion Wall Plan.pdf PDF
0010 CFT Plans Dry Stacked Rock Retaining Wall 935.20.pdf PDF
0017 12445123R0034 CONTACTOR REFERENCES FILLABLE.pdf PDF
0013 CFT Geotechnical Report SIGNED.pdf PDF
0011 CFT Load Calculations.pdf PDF
0007 CFT Plans Page 15 of 34 Revision.pdf PDF
0015 12445123R0034 Attachment A Buy American_Hazardous Materials Fillable.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information ‐ See FAR 2.101, 3.104 and 15.101‐2 For Official Use Only

APPENDIX D: Construction Experience Questionnaire

Catawba Falls Trail Improvements Solicitation 12445123R0034

Construction Experience Questionnaire (to be completed by contractor)

Instructions: Do not alter the form, except for expanding the individual response blocks. The total length for each project data sheet shall not exceed three (3) double-sided 8.5” x 11”pages and shall be Times New Roman 11 font (minimum). Use Box 10 Remarks if extra space is needed to answer any item below.

Answer all items.

1. Contractor’s Name, Address & Telephone #. 2. Type of Business

___Company ___Co-Partner ___Corporation ___Individual ___Non-profit Organization

3. How many years’ experience do you have in this line of work? ______ years

4. How many years’ experience as a prime contractor? ______ years

And as a subcontractor? ______ years

5. List the projects/contracts your business has completed in the last five (5) years.

CONTRACT

AMOUNT

TYPE OF CONTRACT DATE

COMPLETED

Contact Name, Address and Tele. #

Solicitation No: 12445123R0034

Project Name: Catawba Falls Trail Phase 1 C

FAC 2023-04 dated June 2, 2023

6. List all of your firms’ current contract commitments

CONTRACT

NUMBER

AWARD

AMOUNT

Contact Name, Address & Tele. #

Percent Completed

Date Contract Completed

7a. Have you ever failed to complete any work awarded to you? ___yes ___no 7b. Has work ever been completed by performance bond? ___yes ___no

7c. If “yes” to either item 7a or 7b above, specify reason(s) and location(s) why.

8. Organization structure that will be available for this project:

a. Minimum No. of employees: _____ and Maximum No. of employees: _____

b. Are employees regularly on your payroll? ___yes ___no

c. Specify equipment available for this contract:

d. Estimate rate of progress (exp. 100 feet, 1/8 mile a day, etc.):

Minimum progress rate: ____________ Maximum progress rate:____________

9. List the experience of the principal individuals of your business

NAME PRESENT POSITION YRS

EXP.

TYPE OF WORK

Solicitation No: 12445123R0034

10. REMARKS

unique Sam#_______________ Tax ID#______________

CERTIFICATION: I certify that all of the statements made by me are complete and correct to be best of my knowledge and that any persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.

Signature Print or Typed Name Title Date

Solicitation No: 12445123R0034

1 Contractors Name Address Telephone:
3 How many years experience do you have in this line of work years:
undefined:
years:
years_2:
CONTRACT AMOUNTRow1:
TYPE OF CONTRACTRow1:
DATE COMPLETEDRow1:
Contact Name Address and Tele Row1:
CONTRACT AMOUNTRow2:
TYPE OF CONTRACTRow2:
DATE COMPLETEDRow2:
Contact Name Address and Tele Row2:
CONTRACT AMOUNTRow3:
TYPE OF CONTRACTRow3:
DATE COMPLETEDRow3:
Contact Name Address and Tele Row3:
CONTRACT AMOUNTRow4:
TYPE OF CONTRACTRow4:
DATE COMPLETEDRow4:
Contact Name Address and Tele Row4:
CONTRACT AMOUNTRow5:
TYPE OF CONTRACTRow5:
DATE COMPLETEDRow5:
Contact Name Address and Tele Row5:
CONTRACT AMOUNTRow6:
TYPE OF CONTRACTRow6:
DATE COMPLETEDRow6:
Contact Name Address and Tele Row6:
CONTRACT NUMBERRow1:
AWARD AMOUNTRow1:
Contact Name Address Tele Row1:
Percent CompletedRow1:
Date Contract CompletedRow1:
CONTRACT NUMBERRow2:
AWARD AMOUNTRow2:
Contact Name Address Tele Row2:
Percent CompletedRow2:
Date Contract CompletedRow2:
7c If yes to either item 7a or 7b above specify reasons and locations why 1:
7c If yes to either item 7a or 7b above specify reasons and locations why 2:
7c If yes to either item 7a or 7b above specify reasons and locations why 3:
7c If yes to either item 7a or 7b above specify reasons and locations why 4:
a Minimum No of employees:
and Maximum No of employees:
Specify equipment available for this contract 1:
Specify equipment available for this contract 2:
Minimum progress rate:
Maximum progress rate:
NAMERow1:
PRESENT POSITIONRow1:
YRS EXPRow1:
TYPE OF WORKRow1:
NAMERow2:
PRESENT POSITIONRow2:
YRS EXPRow2:
TYPE OF WORKRow2:
NAMERow3:
PRESENT POSITIONRow3:
YRS EXPRow3:
TYPE OF WORKRow3:
NAMERow4:
PRESENT POSITIONRow4:
YRS EXPRow4:
TYPE OF WORKRow4:
NAMERow5:
PRESENT POSITIONRow5:
YRS EXPRow5:
TYPE OF WORKRow5:
CERTIFICATION I certify that all of the statements made by me are complete and correct to be best of:
Tax ID:
Print or Typed Name:
Title:
Date:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Text10:

File details come from the government source that posted it. Updated .