0015 12445123R0034 Attachment A Buy American_Hazardous Materials Fillable.pdf

PDF 750 KB Posted

Attached to
USDA Forest Service NORTH CAROLINA CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC
Solicitation number
12445123R0034
Issued by

About this file

This document includes a federal contract opportunity for trail improvement work. The solicitation is for the USDA Forest Service North Carolina Catawba Falls Trail Improvements 2023-Phase 1C project. Work includes constructing boardwalks, stairs, retaining walls and viewing platforms to improve user safety and reduce erosion along sections of the Catawba Falls Trail located in the Pisgah National Forest in North Carolina. The total small business set-aside contract has an estimated value between $5-10 million and involves tasks such as trail resurfacing, turnaround construction, slope reinforcement, and bridge building. The final proposal is due by July 18th, 2023 at 1:00pm EST. A non-mandatory site visit will be held on June 28th, 2023 and the last day for questions is July 10th, 2023.

View the file

Other files

File Type Posted
12445123R0034 Questions Asked As Of 07122023.doc DOC document
12445123R0034 Questions Asked As Of 07112023.doc DOC document
12445123R0034 Site Visit Registry 6.28.2023.pdf PDF
12445123R0034 Questions Asked As Of 07062023.doc DOC document
0004 CFT Supplemental_Specification_939.01 SIGNED.pdf PDF
0003 CFT Supplemental Specification 911-912.pdf PDF
12445123R0034 Complete Package.pdf PDF
0012 CFT Survey Controls.pdf PDF
0016 12445123R0034 Construction Experience Questionaire Fillable.pdf PDF
0002 CFT Standard Trail Specifications.pdf PDF
0006 CFT Plan Set SIGNED.pdf PDF
0009 Catawba Falls Trail 6.15.2023 - Geotechnical Report Slide 3.pdf PDF
12445123R0034 Sched B_Terms and Conditions.pdf PDF
0005 CFT Supplemental_Specification_939.02 SIGNED.pdf PDF
0001 CFT Statement of Work_Catawba Falls Trail Phase 1C 6.12.2023.pdf PDF
0014 Davis-Bacon Act WD NC20230086.pdf PDF
12445123R0034 SF1442.pdf PDF
0008 Catawba Falls Trail 3.20.2023 - Phase 0 Slide 3 Gabion Wall Plan.pdf PDF
0010 CFT Plans Dry Stacked Rock Retaining Wall 935.20.pdf PDF
0017 12445123R0034 CONTACTOR REFERENCES FILLABLE.pdf PDF
0013 CFT Geotechnical Report SIGNED.pdf PDF
0011 CFT Load Calculations.pdf PDF
0007 CFT Plans Page 15 of 34 Revision.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.

NOTE TO CONTRACTOR:

The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

Material and/or Component

Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site

Foreign Construction Material

Comparable Domestic Material

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

Attachment A

HAZARDOUS MATERIALS

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.

Hazardous Material Identification Number

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and

Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged. Highway construction items covered by the Environmental Protection Agency’s

Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.

Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on highway projects:

It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.

The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.

Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.

Attachment A

Unit of MeasureForeign Construction Material:
QuantityForeign Construction Material:
Cost Delivered to Job SiteForeign Construction Material:
Foreign Construction MaterialRow1:
Unit of MeasureRow2:
QuantityRow2:
Cost Delivered to Job SiteRow2:
Unit of MeasureComparable Domestic Material:
QuantityComparable Domestic Material:
Cost Delivered to Job SiteComparable Domestic Material:
Comparable Domestic MaterialRow1:
Unit of MeasureRow4:
QuantityRow4:
Cost Delivered to Job SiteRow4:
Unit of MeasureForeign Construction Material_2:
QuantityForeign Construction Material_2:
Cost Delivered to Job SiteForeign Construction Material_2:
Foreign Construction MaterialRow1_2:
Unit of MeasureRow2_2:
QuantityRow2_2:
Cost Delivered to Job SiteRow2_2:
Unit of MeasureComparable Domestic Material_2:
QuantityComparable Domestic Material_2:
Cost Delivered to Job SiteComparable Domestic Material_2:
Comparable Domestic MaterialRow1_2:
Unit of MeasureRow4_2:
QuantityRow4_2:
Cost Delivered to Job SiteRow4_2:
Hazardous MaterialRow1:
Identification NumberRow1:
Hazardous MaterialRow2:
Identification NumberRow2:
Hazardous MaterialRow3:
Identification NumberRow3:
Hazardous MaterialRow4:
Identification NumberRow4:

File details come from the government source that posted it. Updated .