Western Way Interim Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-15994
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- Point of contact
-
- Karina Rodrigues krodrigues@oversightdistrict.org (689) 254-3170
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The Central Florida Tourism Oversight District is requesting bids on the Western Way Interim Improvements project in Orange County, Florida, with bids due June 18, 2026 and a mandatory pre-bid meeting via Microsoft Teams on May 26, 2026 at 10:00 a.m.
The scope includes milling existing asphalt pavement to 1.5 inches and placing new FC-12.5 asphalt on Buena Vista Drive and Western Way, with localized striping modifications on the northbound approach of Hartzog Road. Work also encompasses temporary traffic control and lane closures; removal of existing concrete traffic separators; hydro blasting of bridge decks; final pavement marking and striping; regulatory sign installation and relocation; removal and replacement of themed wayfinding signs; relocation and installation of signal heads; installation of new median turn lane signal pedestals, bases, conduit, and pull boxes; traffic control cabinet tie-in; erosion control; and site restoration. Construction activities are phased to maintain existing traffic circulation and ensure public safety.
The District offers bid preferences for local vendors, veteran small businesses, and opportunity zone businesses on most solicitations. The specific weighting or threshold of these preferences is not disclosed in the bid flyer.
Bid documents and submission occur exclusively through the PlanetBids electronic platform. Vendors must register on the platform to submit questions and bids, though documents may be viewed without registration. Attendance at the pre-bid meeting is required and must be confirmed through RSVP on PlanetBids. Karina Rodrigues is the Procurement Manager.
Opportunity text
The scope of work for the Western Way Interim Improvements includes but is not limited to:
• maintenance of traffic
• temporary traffic control
• lane closures
• milling and resurfacing of existing asphalt pavement
• removal of existing concrete traffic separator
• hydro blasting (bridge deck)
• final pavement marking and striping
• regulatory sign installation and relocation
• removal and replacement of themed wayfinding signs
• relocation of existing signal heads
• installation of new signal heads
• installation of new median turn lane signal pedestals and bases and associated conduit
• pull boxes
• traffic control cabinet tie-in work;
• erosion control; and
• site restoration
Location is at Buena Vista Drive and Western Way, with additional work along the northbound approach of Hartzog Road.
The project consists of milling existing asphalt pavement to a depth of 1.5 inches and placing new 1.5-inch FC-12.5 including hydro blasting (bridge deck), and final striping on Buena Vista Drive and Western Way, along with localized striping modifications on Hartzog Road.
Construction activities are phased to maintain existing traffic circulation and ensure public safety through temporary lane closures and MOT operations.
Files
| File | Type | Posted |
|---|---|---|
| C007089- MFMP Bid Flyer.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity