Unit 4 cell 5 liner construction twin chimneys landfill
Closed State & local contract opportunity
- Solicitation number
- RFP #27008
- State
- South Carolina
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 66544 Landfill Liners And Covers
- 90638 General Construction - Architectural
- 911 Construction And Utilities, Higher Education
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91359 Construction And Upgrades, Wastewater Treatment Plant
- UNSPSC codes
- 72141511 Digging services
- 95121642 Sewage pumping station
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72140000 Heavy construction services
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 95121643 Sewage outfall
- Point of contact
-
- Jackie Brown jaqbrown@greenvillecounty.org (864) 467-7204
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Greenville County, South Carolina is requesting proposals for Unit 4 Cell 5 Liner Construction at Twin Chimneys Landfill, an 8.6-acre municipal solid waste cell liner system, with proposals due August 21, 2026 at 3:00 p.m. and a non-mandatory pre-proposal meeting on August 5, 2026.
The scope encompasses construction of a base liner system with 24 inches of on-site compacted clay (1x10-5 cm/sec permeability), geosynthetic clay liner, 60-mil HDPE geomembrane, geocomposite drainage material, leachate collection piping (5-inch to 22-inch diameters), 24 inches of off-site protective cover soil, and site seeding on 10 acres. Greenville County will procure the GCL, 60-mil HDPE, and geocomposite separately; the contractor furnishes all remaining materials and is responsible for construction quality control and surveying. The contractor must obtain on-site clay material and source off-site protective cover soil and stone from borrow pits, maintaining accessibility throughout the schedule. Quantities include approximately 28,000 cubic yards of compacted soil liner, 1,910 cubic yards of leachate column stone, 6,000 square yards of separator geotextile, and 28,000 cubic yards of operational cover. The contractor must be licensed to perform construction work in South Carolina and comply with the South Carolina Illegal Immigration Reform Act and Prison Rape Elimination Act.
The County requires Substantial Completion within 180 calendar days from Notice to Proceed and Final Completion within 210 calendar days, with liquidated damages of $1,000 per day for Substantial Completion delays and $500 per day for Final Completion delays. A fuel price adjustment clause applies to subgrade preparation, compacted soil liner, leachate column stone, and operational cover, calculated using SCDOT monthly fuel price indices with triggers at 1.10 (upward) and 0.90 (downward) ratios.
A 5 percent bid bond and performance and payment bond equal to the total bid price (due within fifteen working days of award) are required. Insurance requirements include $1,000,000 per occurrence general liability, $1,000,000 per occurrence automobile liability, and statutory workers' compensation. The County retains 10 percent from all monthly invoices, released upon satisfactory completion.
Evaluation criteria—each weighted equally at 16.7 percent—cover responsiveness, experience with similar projects within five years, current workload and available resources, references, proposed schedule, and cost competitiveness. Questions are due August 10, 2026 at 5:00 p.m. Award is anticipated September 4, 2026, with contract negotiations September 4–18 and Notice to Proceed expected September 18, 2026.
Opportunity text
The County of Greenville is seeking proposals for UNIT 4 CELL 5 LINER CONSTRUCTION AT TWIN CHIMNEYS LANDFILL. A 8.6 acre base liner construction (1x10-5 cm/sec clay, GCL, 60-mil HDPE, geocomposite, protective cover, leachate collection pipes). Contractor will be responsible for construction quality control (CQC) and surveying. Greenville County will provide Construction Quality Assurance (CQA) in a separate RFP.
The County desires the project to be achieve Substantial Completion within 180 calendar days from Notice to Proceed and Final Completion within 210 calendar days from Notice to Proceed. The Project is subject to liquidated damages of $1,000/day for Substantial Completion and $500/day for Final Completion.