Dwgs_IFP_TCLF_MSW_Unit_4_Cell_5_Landfill_Liner.pdf

PDF 14 MB Posted

Attached to
UNIT 4 CELL 5 LINER CONSTRUCTION TWIN CHIMNEYS LANDFILL
Solicitation number
RFP #27008
Issued by
Greenville County, South Carolina

About this file

This is a set of contract drawings issued by HDR Engineering, Inc. for Greenville County, South Carolina for the Twin Chimneys Landfill Unit 4 Cell 5 Liner civil construction project. The project encompasses the design and construction of an 8.6-acre municipal solid waste (MSW) landfill cell liner system, including subgrade preparation, a 2-foot soil liner component, geosynthetic clay liner (GCL), 60-mil HDPE geomembrane, geocomposite drainage media, protective cover, and leachate collection piping infrastructure. The drawings include nine sheets detailing existing conditions, subgrade specifications, liner installation requirements, operational cover specifications, and liner construction details with cross-sections. The project is located at the Twin Chimneys Landfill on Augusta Road in Greenville County and references an existing 2025 drone survey and 2021 aerial survey for baseline topography. The drawings are issued for proposals as of July 15, 2026, with Project Number 10174879.

The contractor is responsible for construction quality control (CQC) and surveying work, while the County will separately procure Construction Quality Assurance (CQA) services. The project requires substantial completion within 180 calendar days from Notice to Proceed and final completion within 210 calendar days from Notice to Proceed, with liquidated damages assessed at $1,000 per day for failure to achieve substantial completion and $500 per day for failure to achieve final completion. Key construction requirements include proof rolling of the subgrade, clay liner thickness verification and permeability testing, HDPE geomembrane panel layout approval, leachate pipe video inspection and cleaning, and final as-built surveying. Primary site access is via the existing Augusta Road (Highway 25) construction entrance, with restrictions on Bridge Road access requiring coordination with ongoing landfill operations. All excavated materials not used in construction must be stockpiled in designated areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Twin Chimneys Landfill

Cell 5 Liner Civil

Project No.

11075 Augusta Road

C o n t r a c t D r a w i n g s F o r

10174879

July 2026

I N D E X O F D R A W I N G S

GENERAL

15G-00 COVER SHEET

15G-01 OVERALL SITE PLAN

CIVIL

15C-01 EXISTING CONDITIONS

15C-02 UNIT 4 CELL 5 SUBGRADE

15C-03 UNIT 4 CELL 5 SUBGRADE CONTROL PLAN

15C-04 UNIT 4 CELL 5 TOP OF LINER

15C-05 UNIT 4 CELL 5 TOP OF LINER CONTROL PLAN

15C-06 UNIT 4 CELL 5 OPERATIONAL COVER

15C-07 UNIT 4 CELL 5 OPERATIONAL COVER CONTROL PLAN

15C-08 LINER DETAILS

15C-09 CROSS SECTIONS

Issued for Proposals

MSW Unit 5

Greenville County, South Carolina

HDR Engineering, Inc.

of the Carolinas 440 S. Church St., Suite 1200 Charlotte, NC 28202-2075 704.338.6700

7/15/26

0 82

750 740

0 78

740 745 75

740 73 5 73

0 72 5 72

0 71

660 660

5 76

715 720 725

735 730

725 720

800 805

5 79

0 77

C&D A

CCES

S

ROAD

AC

CE

SS

R

OA

D

73074

75076

760770780790

73073074074074 0750760770

710710710

770 78

0740 750 760 77

0 780

70071

074075

C L

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/L

DITC

H

C/L

DI

TCH

DITCH

C/L DI

TCH

DITCH

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITCH

DIT

CH

C/L DITCH

C/L DI

TCH

C/L D

ITCH

C/L DI

TCH

C/L DI

TCH

DITCH

D I T C H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DITCH

DITCH

DITCH

DITCH

DIT

CH

DITC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITC

H

DITC

H

C/ L

DI

TC

H

705710715720725

730 73

74575075575575 575575

5 760760 765765 770770

70571 071572072573073574074575075

81081

780 82

73573573574

077578078

725725725 7307357407

5 77

770775780 785790795

800805810815820

695700705710715

680680

685690

685690

0 86

0 76

0740750

760770780790800810

UNIT 2

C&D

CELL 1

CELL 2

FUTURE

UNIT 7

FUTURE

UNIT 5

CELL 3

CELL 4 CELL 5

ACTIVE

UNIT 4 MSW

CLAY

STOCKPILE

SEDIMENT

BASIN B

SEDIMENT

BASIN C

E-WASTE

METALS

PAD

YARD

WASTE

PAD

SEDIMENT

BASIN A

ROCK

STOCKPILE

17.0 ACRES

8.6 ACRES

COMPOST AREA

8.5 ACRES

10.3 ACRES

SOIL STOCKPILE

8.6 ACRES

UNIT 1 MSW

VA

UL

T

G W -3

1-

LC

-0

1-

LC

-0

1-

LC

-0

1-

LC

-0

1-

LC

-0

1-

LC

-0

1-

LC

-0

1-

LC

-1

1-

LC

-1

1-

LC

-1 2 1-

LC

-1

1-

LC

-1

1-

LC

-1 5 1-

LC

-1

1-

LC

-1

1-

LC

-1

1-

LC

-1

1-

LC

-2

1-

LC

-2

1-

LC

-2

1-

LC

-2

1-

LC

-2

1-

LC

-2

1-

LC

-2

G W -3

G W -3

G W -3 1G W -3

G W -2

G W -1

C S -1

C S -2

VA

UL

T

UGE

UGE

EB

UGE

UGEUGE

UGE

MB

OHW

O

HW

O

HW

LEACHATE

VAULT #1

LP

LP

LP

LP

LP

LP

36"RCP

INV:725.45

"x

"C

M P

INV:728.84

INV:730.90INV:733.21

INV:734.45

GR

GR

x 724.39 TP x 724.90 TP x 7

.0 8 T

P x 7

.4 9 T

P

TP 724.29 x

TP 722.02 x

TP 719.23 x

TP 717.04 x

EB

OUTPARCEL

OUTPARCEL

OUTPARCEL

MM-1

MM-2

MM-3

MM-4

MM-5 MM-6

MM-7

MM-28MM-29

MM-30

MM-31

MM-32

MM-33

MW-4

MW-5

OW-115

MW-72

MW-48

MW-71

MW-47

MW-46

MW-45

MW-70

MW-30

MW-31

MW-32

MW-33

MW-37

MW-38

MW-39

OW-107

OW-108

MW-29

MW-28

MW-27

MW-26

MW-25

MW-66

MW-67

OW-113

OW-114

MW-61

MW-62

MW-24

MW-63

MW-64

MW-65

OW-103

MW-105

MW-13

MW-14

OW-104-R1

M W

-1

7 MW-18

M W

-1

OW-104

OW-105

MW-1

MW-2

MW-3

OW-102

OW-110

OW-109 MW-52

MW-6

MW-7

MW-51

MW-41

MW-12

MW-8

MW-50

MW-11

MW-10

MW-9

OW-101

MW-20

PZ-13s PZ-13d

PZ-44

PZ-7s

PZ-50

PZ-2d PZ-2s

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56PZ-6s

PZ-5da PZ-5d

PZ-77

PZ-14

PZ-43

PZ-19

PZ-52sPZ-52d

PZ-7s

PZ-4

PZ-39s PZ-39d

PZ-26d PZ-26s

PZ-23d PZ-23s

PZ-75

PZ-51

PZ-10ra

PZ-41

PZ-57s

PZ-57d

PZ-78

PZ-73

PZ-30

PZ-25 PZ-25d

PZ-20

PZ-64

PZ-29

PZ-79

PZ-55

PZ-67

PZ-66s PZ-66d

PZ-12

PZ-74

PZ-65

PZ-9s

PZ-35d

PZ-35

PZ-62s PZ-62d

PZ-28

PZ-40

PZ-48

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-42

MW-43

MW-44

MW-49

MW-25

OVERALL SITE PLAN

15G-01.dwg

1" = 300' 15G-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 1,2 AND 4 AREA BY RP &ASSOCIATES DATED JULY

09, 2025.

2. CONTRACTOR'S PRIMARY ACCESS TO THE SITE SHALL BE VIA THE

EXISTING AUGUSTA ROAD (HIGHWAY 25) CONSTRUCTION ENTRANCE

THAT LEADS DIRECTLY INTO UNIT 4. MAINTAIN BOTH IN GOOD

CONDITION AT ALL TIMES AND IMPROVE AS NECESSARY TO

COMPLETE THE WORK.

4. CONTRACTOR MAY ELECT TO INSTALL A NEW CONSTRUCTION

ENTRANCE IN THE LOCATION SHOWN ALONG HIGHWAY 25.

CONTRACTOR WILL NEED TO PROVIDE A GATE TO SECURE THE

ACCESS.

5. ACCESS TO THE BRIDGE ROAD IS RESTRICTED DUE TO LANDFILL

OPERATIONS. COORDINATE WITH OWNER A SCHEDULE FOR

TRAVERSING THE BRIDGE. SUPPLY FLAGGERS DURING LANDFILL

OPERATING HOURS TO COORDINATE CONTRACTORS TRAFFIC AND

LANDFILL TRAFFIC ON BRIDGE ROAD. GARBAGE TRUCKS AND

OTHER COUNTY VEHICLES SHALL ALWAYS HAVE PRIORITY.

6. CONTRACTOR RESPONSIBLE FOR SECURITY OF ALL TOOLS,

MATERIALS AND EQUIPMENT LEFT ON SITE. CONTRACTOR TO

SECURE ACCESS POINTS TO THE WORK SITE AS NECESSARY.

7. THE CONTRACTOR SHALL PROTECT ALL EXISTING WELLS,

STRUCTURES AND UTILITIES. ANY WELLS, STRUCTURES OR

UTILITIES THAT ARE DAMAGED SHALL BE REPLACED OR REPAIRED

(AS DIRECTED BY OWNER).

8. EROSION AND STORMWATER CONTROL MEASURES ARE INSTALLED

AND OPERATIONAL FOR THE DESIGNATED WORK AREAS.

CONTRACTOR TO MAINTAIN AND PROTECT THE STRUCTURES FROM

DAMAGE.

9. SITE BENCHMARK CONTROL IS LOCATED NEAR THE CELLULAR

TOWER.

CONSTRUCTION AREA

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2025 MAJOR CONTOURS

EXISTING 2021 & 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

PZ-# PZ-#

B-#B-#

MM-#

MW-A

SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

LEACHATE

TANKS

SCALE

HOUSE

ADMINISTRATION

BUILDING

EDUCATION

BUILDING

CELLULAR

TOWER

SEDIMENT

TRAP A

SEDIMENT

BASIN #T4

EXISTING CONSTRUCTION ENTRANCE

AUGUSTA RD

AUGUSTA RD

BRIDGE ROAD

SEDIMENT BASIN #11

100 YEAR FLOODPLAIN

LEACHATE

EVAPORATOR

CONCRETE

MONUMENT

N 987685.471 E 1604817.497

EL. 809.25

STOCKPILE ACCESS ROAD

TEMPORARY

SEDIMENT BASIN A

LIMITS OF SURVEY

LIMITS OF SURVEY

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PWESTMOR

Snapshot

PWESTMOR

Text Box

0 82

0 78

740 745 75

740 73 5 730 72

5 72 0 71

5 76

715 720 725

735 730

725 720

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DE

NS

E

BR

US

H

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

B R U S H

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

D I R T

D R I V E

DIRT DRIV

E

DIR

T D

RIV

E

DIRT

DRI

VE

DIRT DRIVE

DIR

T D

RIV

E

DI

RT

D

RI

VE

DI

RT

D

RI

VE

DIRT

DRIVE

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

C/L

DITC

H

DITCH

C/L DI

TCH

DITCH

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DIT

CH

DITCH

DIT

CH

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

C/ L

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DI

TC

H

DITCH

DITCH

DI

TC

H

DIT

CH

D E N S E

B R U S H

D E N S E

B R U S H

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

D E N S E

T R E E S

B U I L D I N G

B U R N

S T A T I O N

B U R N

S T A T I O N

DIR

T D

RIV

E

DIRT DR

IVE

C/ L

DI

TC

H

C/ L

DI

TC

H

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

RA

P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

R I P

R A P

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

L I M I T S

O F

S U R V E Y

0740750

760770 780790800810

73074

75076

770780

73073074074074 0750760770

710710710

0740 750 760

0 780

70071

074075

PZ-15

SB-108

SB-109

SB-111

SB-112

SB-104

OW-108

MW-28

MW-27

MW-26

MW-25

MW-66

MW-67

OW-113

OW-114

MW-61

MW-62

MW-24

MW-63

MW-64

MW-65

OW-103

MW-105

MW-13

MW-14

OW-104-R1

M W

-1

MW-18

M W

-1

OW-104

OW-105

MW-12

MW-8

MW-11

MW-10

MW-9

MW-20

PZ-44

PZ-50

PZ-2d PZ-2s

PZ-4a

PZ-76

PZ-6d

PZ-53

PZ-54

PZ-56

PZ-6s

PZ-5da PZ-5d

PZ-77

PZ-52s PZ-52d

PZ-4

PZ-23d PZ-23s

PZ-78

PZ-25 PZ-25d

PZ-20

PZ-64

PZ-55

PZ-67

PZ-66s PZ-66d

PZ-74

PZ-65

PZ-68

OW-105-R1

MW-10R

MW-21

MW-23

MW-22

MW-25

VA

UL

T

C S -1

C S -2

VA

UL

T

UGE

UGE

EB

UGE

UGEUGE

O

HW

O

HW

LEACHATE

VAULT #1

LP

LP

LP

LP

LP

LP

36"RCP

INV:725.45

INV:728.84

GR

GR

x 724.39 TP x 724.90 TP x 7

.0 8 T

P x 7

.4 9 T

P

TP 724.29 x

TP 722.02 x

TP 719.23 x

TP 717.04 x

EB

OUTPARCEL

OUTPARCEL

CELL 1

CELL 2

FUTURE

UNIT 7

ACTIVE

UNIT 4 MSW

CELL 3

CELL 4

CELL 5

COMPOST AREA

EXISTING CONDITIONS

15C-01.dwg

1" = 200' 15C-01

GENERAL NOTES:

1. EXISTING TOPOGRAPHY FROM TWO SEPARATE SURVEYS,FREELAND

& ASSOCIATES AERIAL SURVEY DATED JULY 15, 2021 AND DRONE

SURVEY IN UNIT 1,2 & 4 AREA BY RP &ASSOCIATES DATED JULY 09,

2025.

2. STOCKPILE ALL EXCAVATED SOIL MATERIALS, NOT USED IN THE

WORK, IN THE DESIGNATED AREA INDICATED ON THE PLAN.

BORINGS (SB & B)

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PL

LEGEND

EXISTING 2021 & 2025 MAJOR CONTOURS

EXISTING 2021 & 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

EXISTING TREELINE

CONSTRUCTION AREA

CONSTRUCTION SEQUENCE:

1. ESTABLISH LIMITS OF CONSTRUCTION.

2. REVIEW FIELD CONDITIONS AND THE AS-BUILT SURVEY FROM THE

PREVIOUS CONSTRUCTION PROJECT WITH ENGINEER PRIOR TO

INITIATING CONSTRUCTION.

3. PERFORM EXCAVATION AND FINE GRADING TO ACHIEVE SUBGRADE.

MAINTAIN POSITIVE DRAINAGE IN SEDIMENT BASIN A. A PUMP AND

SILT BAG MAY BE NECESSARY.

4. BEGIN CLAY LINER INSTALLATION. PROVIDE TEST DATA AND

PERIODIC CLAY THICKNESS SURVEY TO ENGINEER FOR REVIEW.

5. UPON RECEIPT OF PASSING CLAY TEST RESULTS AND SURVEY,

THICKNESS VERIFICATION, BEGIN GEOSYNTHETICS INSTALLATION.

6. UPON RECEIPT OF PASSING GEOSYNTHETICS TEST RESULTS, BEGIN

OPERATIONAL COVER AND LEACHATE PIPE INSTALLATION.

7. SUBMIT SURVEY OF OPERATIONAL COVER THICKNESS

VERIFICATION TO ENGINEER FOR REVIEW.

8. SEED DISTURBED AREAS AND STOCKPILES.

9. PERFORM LEACHATE PIPE VIDEO INSPECTION AND CLEANING.

10. SUBMIT OVERALL SURVEY OF DISTURBED AREAS.

OVERALL PROJECT SCOPE:

THE COUNTY IS CURRENTLY EXCAVATING THE CELL 5 AREA TO THE

SUBGRADE SHOWN ON SHEET 15C-02. THIS PROJECT MAY REQUIRE

ADDITIONAL EXCAVATION TO ACHIEVE THE SUBGRADE, FOLLOWING

SUBGRADE EXCAVATION, CONTRACTOR TO INSTALL THE LINER SECTION

SHOWN ON SHEET 15C-08 DETAIL 1.

MW-A

MM-#

B-# B-#

PZ-#PZ-#

EXISTING SEDIMENT

BASIN #T2

SEDIMENT

BASIN #T5

SEDIMENT

BASIN #T3

SEDIMENT BASIN #9

WETLANDS

SEDIMENT BASIN #10

DI #9

SEDIMENT

BASIN #T4

EXISTING

CONSTRUCTION

ENTRANCE

AUGUSTA RD

TEMPORARY SEDIMENT BASIN A

SEDIMENT BASIN #11

CURRENT MSW

PERMIT BOUNDARY

PROPOSED MSW

PERMIT BOUNDARY

SOIL STOCKPILE

CLAY STOCKPILE

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

BRIDGE ROAD

PWESTMOR

Snapshot

PWESTMOR

740740740

730730

ACTIVE CELL 4

ACTIVE CELL 3

8.5 ACRES

10.3 ACRES

8.6 ACRES

8.5 ACRES

ACTIVE CELL 2

PROPOSED CELL 5

MW-24

PZ-6d

PZ-54

PZ-56

PZ-6s

PZ-77

MW-23

MW-22

MW-25

710720730740

0720720

760760

3:1

3:1

3:

3:

3:1

3:1

4.0%

5.0%

5.0%

1.5%

0.9%

33.1%

UNIT 4 CELL 5 SUBGRADE

15C-02.dwg

1"=60' 15C-02

PL

LEGEND

EXISTING 2025 MAJOR CONTOURS

GENERAL NOTES:

1. CONTRACTOR SHALL PROVIDE AN AS-BUILT SURVEY OF THE SUBGRADE SIGNED

AND SEALED BY A LAND SURVEYOR, FOR ENGINEERS ACCEPTANCE PRIOR TO

INITIATING CLAY LINER INSTALLATION.

2. CONTRACTOR MAY UTILIZE THE SKIMMER DURING CLAY INSTALLATION. THE

CONTRACTOR MAY ABANDON THE SKIMMER PER THE DETAIL AND USE A PUMP

AND SILT BAG.

3. EXISTING CONDITIONS WITHIN THE CELL 5 DO NOT REPRESENT THE JULY 09, 2025

SURVEY DUE TO CURRENT EXCAVATION. CONTRACTOR TO VERIFY CONDITIONS

PRIOR TO INITIATING CONSTRUCTION.

4. PROPOSED CONTOURS WITHIN CONSTRUCTION BASELINE REPRESENT

SUBGRADE OF CELL 5.

5. AN ACCEPTABLE PROOF ROLL (AS DEFINED BY THE CQA CONSULTANT) MUST BE

OBSERVED TO DEMONSTRATE A STABLE SUBGRADE PRIOR TO CONSTRUCTION

OF THE LINER SYSTEM. THE SUBGRADE MAY BE ACCEPTED IN STAGES TO

FACILITATE CONSTRUCTION. REFER TO TECHNICAL SPEC SECTION 31 38 10.

6. REFER TO SPECIFICATIONS AND CQA PLAN FOR SURVEYING REQUIREMENTS TO

PRODUCE AS-BUILT DRAWINGS AND TO PROVIDE BASIS FOR VERIFYING

EXCAVATION QUANTITIES.

7. REMOVE ALL WET AND SOFT SOILS PRIOR TO BEGINNING STRUCTURAL FILL

PLACEMENT. COMPACT PER SPECIFICATIONS. "BRIDGE LIFTS" REQUIRE

APPROVAL OF ENGINEER AND CQA CONSULTANT.

8. PROTECT EXISTING WELLS, DROP INLETS AND OTHER STRUCTURES DURING THE

WORK.

9. IF CONTRACTOR ENCOUNTERS GROUNDWATER DURING EXCAVATION,

IMMEDIATELY STOP WORKING IN THAT AREA AND NOTIFY ENGINEER. EXISTENCE

OF WATER MAY REQUIRE REVISION TO GRADING. THE CONTRACTOR SHALL

IMPLEMENT ALL CHANGES BASED ON EXISTENCE OF GROUNDWATER IN THE

EXCAVATION.

EXISTING 2025 MINOR CONTOURS

WETLANDS

UNIT AND CELL BASELINES

PROPERTY LINE

GRADING LIMITS

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

EXISTING TREELINE

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

MW-A

MM-#

PZ-#PZ-#

PROPOSED

CONSTRUCTION

BASELINE

TEMPORARY

SEDIMENT BASIN A

SF

SILT FENCE

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

KEY MAP

RAINCOVER

NTS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PROPOSED

CONSTRUCTION

BASELINE

15C-09

PWESTMOR

Snapshot

PWESTMOR

POINT TABLE

POINT NO.

NORTHING

983645.29

983663.17

983659.04

983657.57

983503.02

983496.46

983468.88

983492.70

983540.40

983364.12

983289.52

983205.49

983095.06

983305.92

983332.60

983344.21

983379.36

983393.08

983656.85

983666.68

983593.61

983416.08

983608.63

983459.60

983407.63

983286.96

983283.49

983236.07

983209.88

983361.19

983428.75

983586.77

EASTING

1605184.98

1605198.95

1605284.56

1605314.79

1605568.82

1605614.40

1605806.30

1605865.29

1605983.38

1606121.88

1606067.06

1606021.22

1605842.28

1605002.72

1604919.21

1604893.50

1604887.94

1604887.23

1605077.59

1605115.86

1605142.57

1605034.54

1605245.16

1605331.76

1605029.49

1605432.09

1605447.96

1605664.73

1605771.18

1606016.72

1606071.10

1605431.14

ELEVATION

730.00

730.00

728.00

754.00

754.00

710.00

701.59

700.00

754.00

718.11

720.30

723.03

729.97

754.63

758.00

759.12

751.00

750.00

754.07

750.00

728.00

720.00

728.00

720.00

719.59

710.73

710.00

700.00

696.00

693.47

691.89

720.00

DESCRIPTION

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

SG

111 112 113

720730740750

3:1

3:1

3:

3:

3:

3:1

4.0%

4.0%

5.0%

5.0%

5.

0%

UNIT 4 CELL 5 SUBGRADE CONTROL

15C-03.dwg

1"=60' 15C-03

LEGEND

CONTROL LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

PROPOSED CELL 5

8.6ACRES

NOTES

1. CONSTRUCT THE CELL FLOOR AND DITCHES TO THE GRADES SHOWN ON

THIS DRAWING. UTILIZE GPS EQUIPMENT FOR FINE GRADING SUBGRADE AND

THE CLAY LINER.

2. CONTOURS INSIDE THE CONSTRUCTION BASELINE REPRESENT PROPOSED

SUBGRADE AS SHOWN ON SHEET 15C-02.

3. EACH PANEL (PLANE) DEPICTS AN AREA OF CONSTANT GRADE. REFER TO

THE DETAILS FOR BASEGRADE GEOMETRY AROUND THE PIPING.

4. THE CONTROL POINTS DEFINE THE LOCATION OF THE CONSTRUCTION

BASELINE AND THE PANELS THAT MAKEUP THE CELL.

5. IF THERE ARE ANY CONFLICTS BETWEEN INFORMATION ON THIS SHEET AND

OTHER REPRESENTATIONS OF THE WORK, NOTIFY THE ENGINEER. THE

ENGINEER WILL DETERMINE PRECEDENCE OF CONFLICTS.

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

ACTIVE CELL 4

10.3 ACRES

ACTIVE CELL3

8.5 ACRES

ACTIVE CELL 2

PWESTMOR

Snapshot

PWESTMOR

LF@1.1%

LF@2.5%

LF@2.5%

LF@2.0%

LF@2.5%

LF@2.0%

740740740

730730

ACTIVE

CELL 2

8.6 ACRES

ACTIVE

CELL 4

10.3 ACRES

PROPOSED

CELL 5

8.6 ACRES

5.0

5.0%

2.9%

4.4

5.0%

5.0% 4.0%

4.0%

3:1

3:1

3:1

3:1

MW-62

MW-24

MW-63

PZ-54

PZ-56

PZ-77

PZ-25

PZ-25d

MW-21

MW-23

MW-22

CELL 3

8.5 ACRES

UNIT 4 CELL 5 TOP OF LINER

15C-04.dwg

1"=60' 15C-04

2' OPERATIONAL COVER

SUBGRADE

2' SOIL LINER

KEY MAP

NTS

GEOSYNTHETIC CLAY LINER

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

LEGEND

UNIT AND CELL BASELINES

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. CLAY FOR THE SOIL LINER SHALL BE OBTAINED

FROM THE CLAY STOCKPILE .

2. BACKFILL THE ANCHOR TRENCH WITH THE SAME

MATERIAL AS USED FOR SOIL LINER

COMPONENT.

3. THE CONSTRUCTION BASELINE GENERALLY

REPRESENTS THE HORIZONTAL EXTENT OF THE

LINER SYSTEM. SEE LINER DETAILS.

4. THESE CONTOURS REPRESENT THE TOP OF

SOIL LINER GRADES.

5. REFER TO SPECIFICATIONS AND CQA PLAN FOR

SURVEYING REQUIREMENTS TO PRODUCE

AS-BUILT DRAWINGS AND TO PROVIDE BASIS

FOR VERIFYING EXCAVATION QUANTITIES AND

REQUIRED LINER THICKNESS.

6. RECORD ALL PERMEABILITY TEST LOCATIONS BY

GPS, OR CONVENTIONAL SURVEY. DOCUMENT

LOCATION OF ALL OTHER TESTS BY METHOD

APPROVED BY CQA CONSULTANT.

7. CERTIFY IN WRITING TO THE CQA ENGINEER

THAT THE CLAY LINER MEETS SPECIFICATIONS

INCLUDING THICKNESS VERIFICATION PRIOR TO

INSTALLING HDPE LINER.

8. SUBMIT A HDPE LINER PANEL LAYOUT TO THE

ENGINEER FOR APPROVAL PRIOR TO

INSTALLATION. THE PANELS SHALL BE SEAMED

PARALLEL TO LINE OF MAXIMUM SLOPE. FLOOR

PANELS SHALL GENERALLY BE LAPPED ON THE

DOWNHILL SIDE. REFER TO SPECIFICATIONS AND

CQA PLAN.

9. USE TEXTURED 60 MIL HDPE GEOMEMBRANE

FOR ALL AREAS.

10. ALL LEACHATE PIPES TO BE PERFORATED. ALL

CONNECTIONS TO BE FUSED.

11. JOIN INTERSECTING PIPES WITH

APPROPRIATELY SIZED FITTINGS AND BUTT

FUSION WELDS.

12. PIPES SHOULD BE LAID STRAIGHT BETWEEN

CONTROL POINTS. ALL CLEANOUTS SHALL RUN

PERPENDICULAR TO SLOPE.

13. TEMPORARY STORM WATER PIPE MUST BE

SOLID AND SMOOTH WALLED. CONNECT

PROPOSED PIPE TO EXISTING CELL 2 PIPE USING

FUSION WELD.

NOTES

SEDIMENT BASIN #12

PROPOSED

CONSTRUCTION

BASELINE

A15C-09

C

C -0

CELL 2, 3 & 4 TIE-IN

WITH CELL 5 W/O PIPE

15C-08

LEACHATE PIPE3

15C-08

LEACHATE COLLECTION PIPE

(SIZE VARIES)

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

PIPE PERFORATION

(TYP)

15C-08

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

B 15C-09

CELL 2, 3 & 4 TIE-IN

WITH CELL 5 W/ PIPE

15C-08

LEACHATE

CLEANOUT

(TYP.)

15C-08

CONNECT TO EXISTING 15"

HDPE STORMWATER PIPE

(NOTE 13)

TEMPORARY

STORMWATER PIPE

15C-08

PIPE CROSS

CONNECTIONS

(TYP.)

15C-08

CELL 5 FUTURE

TIE-IN W/O PIPE

15C-08

CELL 5 FUTURE

TIE-IN W/PIPE

15C-08

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

PZ-# PZ-#

MM-#

MW-A

(WITHIN CBL)

LOCATION THIS SHEET

PWESTMOR

Snapshot

PWESTMOR

45 46

726728

LF@1.1%

LF@2.5%

LF@2.5%

LF@2.0%

LF@2.5%

LF@2.0%

SITE LAYOUT COORDINATE POINTS TABLE

POINT NO.

NORTHING

984025.77

983925.79

983656.08

983554.40

983393.08

983312.42

983337.97

983305.92

983094.93

983224.67

983364.12

983663.17

983663.83

983629.88

983380.33

983308.54

983431.34

983429.27

983330.14

983468.49

983656.78

984025.04

983841.87

983657.76

983659.03

983608.58

983476.89

983325.60

983503.03

983468.88

983492.74

983540.40

983595.81

983405.51

983404.27

983407.63

983370.21

983288.11

983666.68

983643.53

983236.40

983210.87

983245.70

983348.27

983102.68

983209.88

983271.93

983573.62

983657.57

983547.29

983473.32

983303.63

983209.03

983406.96

983403.20

EASTING

1605071.45

1605072.29

1605080.10

1605005.45

1604887.23

1604828.12

1604882.30

1605002.72

1605841.31

1606031.70

1606121.88

1605199.01

1605185.30

1605056.72

1604877.36

1605001.10

1606069.06

1606070.68

1604838.14

1604938.45

1605077.80

1605062.44

1605070.70

1605310.97

1605284.62

1605245.19

1605321.72

1605409.63

1605568.76

1605806.30

1605865.38

1605983.38

1605157.95

1605036.29

1605041.40

1605029.49

1605153.11

1605431.42

1605115.86

1605172.95

1605665.05

1605768.54

1605950.40

1606008.16

1605744.31

1605351.33

1605126.18

1605144.45

1605314.79

1605496.02

1605775.38

1605376.88

1605773.08

1605039.52

1605038.88

ELEVATION

757.00

756.00

753.25

752.00

750.00

749.00

757.99

754.63

730.00

723.33

718.11

732.00

732.22

0.00

749.98

754.01

694.07

694.00

750.00

752.00

754.00

760.00

756.00

728.98

730.00

730.00

722.93

714.81

714.00

703.59

702.00

699.45

730.00

719.44

721.37

719.59

718.87

714.45

750.00

730.00

703.65

699.76

698.38

1.65

0.00

0.00

0.00

730.65

728.95

718.23

704.95

713.96

699.85

721.52

1443.51

DESCRIPTION

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT AREA

MAINT AREA

MAINT-AREA

MAINT-AREA

CLEANOUT

MAINT-AREA

MAINT-AREA

22" LLEACH

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

8" LEACH

MAINT-AREA

MAINT. AREA

10" LEACH

10" LEACH

MAINT-AREA

MAINT=-AREA

MAINT=-AREA

MAINT=-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

MAINT-AREA

CLEANOUT

CLEANOUT

MAINT-AREA

MAINT-AREA

MAINT=-AREA

MAINT-AREA

MAINT AREA

CLEANOUT

CLEANOUT

CLEANOUT

CLEANOUT

8" LEACH

MAINT-AREA

10" LEACH

10" LEACH

CLEANOUT

CLEANOUT

16" LEACH

MAINT-AREA

UNIT 4 CELL 5 TOP OF LINER CONTROL

15C-05.dwg

1"= 60' 15C-05

LEGEND

CONTROL LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PROPOSED CELL 5

8.6 ACRES

ACTIVE CELL 4

10.3 ACRES

ACTIVE CELL3

8.5 ACRES

ACTIVE CELL 2

LEACHATE PIPE

LEGEND

CONTROL LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

TEMPORARY

STORMWATER PIPE

PWESTMOR

Snapshot

PWESTMOR

740740740

730730

MW-24

PZ-6d

PZ-54

PZ-56

PZ-6s

PZ-77

MW-23

MW-22

ACTIVE

CELL 2

ACTIVE

CELL 4

10.3 ACRES

ACTIVE

CELL 3

8.5 ACRES

LF@1.1%

LF@2.5%

LF@2.5%

LF@2.0%

LF@2.5%

LF@2.0%

5.0%

5.0%

4.0%

3.

7%

PROPOSED

CELL 5

8.6 ACRES

UNIT 4 CELL 5 OPERATIONAL COVER

15C-06.dwg

1"=60 15C-06

KEY MAP

2' SOIL LINER

SUBGRADE

2' OPERATIONAL COVER

GEOSYNTHETIC CLAY LINER

(WITHIN CBL)

LOCATION THIS SHEET

60 MIL HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

RAINCOVER

PL

LEGEND

UNIT AND CELL BASELINES

PROPERTY LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

1. THE GRADES WITHIN CELL 5 GENERALLY REPRESENT THE

TOP OF OPERATIONAL COVER.

2. CERTIFY IN WRITING TO THE CQA ENGINEER THAT THE

OPERATIONAL COVER MEETS SPECIFICATIONS INCLUDING

THICKNESS VERIFICATION.

3. TEMPORARY STORM WATER PIPE MUST BE SOLID AND

SMOOTH WALLED. CONNECT PROPOSED PIPE TO EXISTING

CELL 2 PIPE USING FUSION WELD.

NOTES

PROPOSED

CONSTRUCTION

BASELINE

CELL 2,3 & 4 TIE-IN

WITH CELL 5 W/O PIPE

15C-08

METHANE MONITORING (MM)

PIEZOMETER (PZ)

MONITORING AND OBSERVATION

WELL (MW,OW)

PROPOSED EXISTING ABANDONED

MW-P

MM-P

MW-A

MM-#

PZ-#PZ-#

LEACHATE

COLUMN

15C-08

EXISTING MAJOR CONTOURS780

EXISTING MINOR CONTOURS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

CELL 2,3 & 4 TIE-IN

WITH CELL 5 W PIPE

15C-08

TEMPORARY

STORMWATER PIPE

LEACHATE CLEANOUT

TOE OF SLOPE8

15C-08

A15C-09

C

C -0

B 15C-09

12" THICK CLASS "A" RIP

RAP WITH UNDERLYING

NON-WOVEN GEOTEXTILE

TERMINATION BERM

PWESTMOR

Snapshot

PWESTMOR

5.

0%

5.

0%

5.0%

4.0%

3.

7%

3:1

3:1

3:1

3:1

3:1

3:1

3:1

204 205

210 211

232233

247248

OPERATIONAL COVER CONTROL TABLE

POINT NO.

NORTHING

983085.85

983100.46

983293.52

983296.75

983211.13

983332.60

983350.90

983337.97

983319.08

983321.53

983324.74

983308.87

983659.03

983368.43

983645.63

983462.67

983403.35

983313.93

983236.82

983492.74

983293.87

983215.27

983405.74

983397.97

983398.68

983306.12

983638.63

983597.57

983405.68

983476.93

983325.78

EASTING

1605777.94

1605748.34

1605047.71

1605002.13

1605768.90

1604919.21

1604892.38

1604882.30

1604872.92

1604865.67

1604849.15

1604832.96

1605284.62

1604815.11

1605185.30

1605076.93

1605041.61

1605005.27

1605665.61

1605865.38

1605981.61

1605913.20

1605035.55

1605044.59

1605042.68

1605003.11

1605193.83

1605169.01

1605037.66

1605321.69

1605409.53

ELEVATION

732.00

736.00

756.00

754.56

700.10

758.00

758.00

758.00

758.00

757.00

752.00

751.00

732.00

750.00

732.00

724.00

722.00

756.00

703.99

704.00

699.54

701.02

719.46

725.35

725.30

714.46

733.64

732.01

721.37

724.93

716.82

DESCRIPTION

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER CONTROL TABLE

POINT NO.

NORTHING

983547.29

983473.32

983608.58

984014.87

984025.04

984025.82

983975.31

983654.21

983647.98

983661.06

983666.68

983649.09

983648.69

983643.53

983644.61

983287.72

983663.83

983657.57

983503.02

983468.88

983540.40

983423.02

983431.91

983357.66

983335.60

983296.10

983266.30

983206.39

983159.90

983123.16

983101.74

983100.66

983092.96

EASTING

1605496.02

1605775.38

1605245.19

1605068.22

1605062.44

1605077.45

1605078.83

1605086.17

1605101.25

1605111.48

1605115.86

1605163.01

1605170.31

1605172.95

1605180.30

1605431.65

1605185.30

1605314.79

1605568.82

1605806.30

1605983.38

1606075.59

1606068.61

1606128.10

1606097.19

1606081.19

1606054.84

1606021.37

1605995.02

1605930.07

1605904.96

1605871.98

1605810.17

ELEVATION

720.23

706.95

732.00

758.00

760.00

759.00

758.00

755.25

750.00

750.00

750.00

734.00

732.00

730.00

730.00

714.46

732.22

730.77

716.00

705.59

701.45

698.19

696.10

718.11

722.00

720.00

724.00

726.00

724.66

730.00

728.00

732.00

734.00

DESCRIPTION

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

OPERATIONAL COVER

UNIT 4 CELL 5 OPERATIONAL COVER CONTROL

15C-07.dwg

1"=60' 15C-07

LEGEND

CONTROL LINE

PROPOSED MAJOR CONTOURS

PROPOSED MINOR CONTOURS

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PROPOSED CELL 5

8.6 ACRES

ACTIVE CELL 4

10.3 ACRES

ACTIVE CELL3

8.5 ACRES

PWESTMOR

Snapshot

PWESTMOR

GEOCOMPOSITE DRAINAGE MEDIA

HDPE GEOMEMBRANE

GEOSYNTHETIC CLAY LINER

2'

1'

1" = 1'

ANCHOR TRENCH2

24" INITIAL SOIL BARRIER

GEOSYNTHETIC CLAY LINER (GCL)

HDPE GEOMEMBRANE

GEOCOMPOSITE DRAINAGE MEDIA

24" OPERATIONAL LAYER

SUBGRADE

NOTES:

1. GCL AND GEOCOMPOSITE DRAINAGE NET ARE PRESENT

IN ALL LOCATIONS WHERE HDPE IS DETAILED.

2. THE REQUIRED THICKNESS OF LAYERS IS MEASURED

PERPENDICULAR TO THE SURFACE. THE HORIZONTAL

LOCATION OF THE SLOPE TOES WILL VARY BASED ON

INTERSECTING SLOPES.

3. GEOSYNTHETIC MATERIAL THICKNESS ARE

EXAGGERATED FOR ILLUSTRATION PURPOSES WHERE

SHOWN AND OMITTED FOR DETAIL CLARITY WHERE NOT

SHOWN.

SLOPESLOPE

B

SEPARATOR

GEOTEXTILE

2' M

IN

PERFORATED PIPE

RAINCOVER (TO BE REMOVED)

CONSTRUCTION

BASELINE

WELDED CAP TO BE

REMOVED AND NEW PIPE

WELDED TO EXISTING PIPE

6'

LINER AND RAINCOVER

ANCHOR TRENCH

LEACHATE

PIPE

2.00'

LEACHATE

PIPE

EXISTING

CELL 2/3/4

RAINCOVER

(TO BE REMOVED)

CONSTRUCTION

BASELINE

6.0'

LINER AND RAINCOVER

ANCHOR TRENCH

2.0'

2.0'

2.

0'

EXISTING

CELL 2/3/4

CELL 5

SEPARATOR GEOTEXTILE

(EXPOSED GEOTEXTILE TO BE

REMOVED BY THE OWNER

PRIOR TO WASTE PLACEMENT)

1" = 5'

LINER SECTION1

1" = 5'

LEACHATE COLUMN3

15C-05

1" = 5'

CELL 6 FUTURE TIE-IN

W/O PIPE4

15C-04 1" = 5'

CELL 2, 3 & 4 TIE-IN

WITH CELL 5 W/O PIPE5

15C-02

1" = 5'

CELL 6 FUTURE TIE IN W/PIPE6

15C-04

1" = 5'

CELL 2,3 & 4 TIE-IN

WITH CELL 5 W/PIPE7

15C-04

LINER

SECTION

1" = 5'

TEMPORARY STOMWATER PIPE10

15C-04

3.

6'

1.

3'

3.0'

0.

7' 3.5'

10'

A B C QTY

8 12 10 5

1" = 5'

LEACHATE COLLECTION CLEANOUT9

15C-04

NOTE: ALL LEACHATE COLLECTION

HARDWARE TO BE STAINLESS STEEL

CAST IN PLACE

CONCRETE

FRONT VIEW

SOLID HDPE PIPE "A"Ø

FUTURE

WASTE

SOLID HDPE CLEANOUT

PIPE "A"Ø

HDPE PROTECTIVE CASING "C"ØANCHOR BLOCK

"B"Ø PIPE

CONSTRUCTION BASELINE

PERFORATED HDPE PIPE "A"Ø

BLIND FLANGE

15" SMOOTH WALL

HDPE STORM DRAIN

PIPE @ 0.5% SLOPE

LINER SECTION

36.0'

18"

GEOTEXTILE

OVERLAP

7.5'

NOTE:

1. OVERLAP GEOTEXTILES 18" AT ALL SEAMS.

LINER SECTION

2.0'

2.

0'

M

IN

3.0'

EXPOSED GEOTEXTILE REMOVED

BY OWNER PRIOR TO WASTE

PLACEMENT

PERFORATED HDPE LEACHATE

COLLECTION HEADER PIPE

1" = 5'

TOE OF SLOPE8

15C-06

NOTE:

1. CONTRACTOR MUST PROVIDE FABRICATION DRAWING FOR

ALL PIPE CROSS CONNECTIONS FOR ENGINEER APPROVAL.

NOT TO SCALE

PIPE CROSS CONNECTION12

15C-04

PIPE DIA. (INCHES) B (FT)

8 TO 12 2

16 TO 22 3

CELL 5

CONSTRUCTION

BASELINE

1.0'

LINER ANCHOR

TRENCH

2.0'

2.0'

2.

0'

12'

RAIN COVER

ANCHOR TRENCH

RAIN COVER

RAIN COVER

BALLAST

17'

CONSTRUCTION

BASELINE

WELDED CAP

1.00'

LINER ANCHOR TRENCH

LEACHATE

PIPE

2.00'

12'

RAIN COVER

RAIN COVER

ANCHOR TRENCH

RAIN COVER

BALLAST

17'

NOTES:

1. CONCRETE TO BE READY MIXED CONCRETE CONFORMING TO ASTM C94/C94M.

2. CONCRETE MUST HAVE MIN. 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI.

SPACING

4" CENTER

HOLE/PATTERN: 6/STAGGERED

3/8"Ø STAGGERED

PERFORATIONS

6" TO 14"

6" CENTER SPACING

1/2"Ø STAGGERED

PERFORATIONS

HOLE/PATTERN: 16/STAGGERED

16"- 36"

NOT TO SCALE

PIPE PERFORATION11

LINER DETAILS

15C-08.dwg

1"=60 15C-08

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

PWESTMOR

Snapshot

PWESTMOR

-0+50 0+00 0+50 1+00 1+50 2+00

-0+50 0+00 0+50 1+00 1+50 2+00

-0+50 0+00 0+50 1+00 1+50 2+00

TRASH GUARD

RISER

SKIMMER

NOTES:

1. CONTRACTOR TO CAREFULLY REMOVE THE SKIMMER, RISER, AND TRASH GUARD

AND PROVIDE TO THE OWNER.

2. EXCAVATE INTO THE BERM TO THE REMOVE A PORTION OF THE BARREL AS SHOWN.

3. GROUT THE REMAINING BARREL.

4. PLACE COMPACTED FILL OVER THE EXCAVATED AREA.

36" CPP 150 - FT LONG4'

BARREL

REMOVE THIS

PORTION OF THE

BARREL

CROSS SECTIONS

15C-09.dwg

AS SHOWN 15C-09

A

B

C

2 3 4 5 6 7 8

D

ISSUE DESCRIPTION

PROJECT MANAGER

PROJECT NUMBER

0 1" 2" FILENAME

SCALE

SHEET

DATE

UNIT 4 CELL 5 LINER

Greenville County South Carolina10174879

P. WESTMORELAND, P.E.

0 07/2026 ISSUED FOR PROPOSALS

HDR Engineering Inc.

440 S. Church St. Suite 1200 Charlotte, NC 28202-2075 704.338.6700 of the Carolinas

PROJECT ENGINEER

DRAWN BY

H: 1" = 30' V: 1" = 30'

CROSS SECTIONSA

15C-04

H: 1" = 30' V: 1" = 30'

CROSS SECTIONSB

15C-04

H: 1" = 30' V: 1" = 30'

CROSS SECTIONSC

15C-04

EXISTING 2025 SURVEY

CELL 5 OPERATIONAL COVER

CELL 5 TOP OF LINER

EXISTING 2025 SURVEY

CELL 5 OPERATIONAL

COVER

CELL 5 TOP OF LINER

EXISTING 2025 SURVEY CELL 5 OPERATIONAL

COVER

CELL 5 TOP OF LINER

TEMPORARY SEDIMENT BASIN A

NTS

15C-02

PWESTMOR

Snapshot

PWESTMOR

File details come from the government source that posted it. Updated .