Two Rivers Correctional Institution Kitchen Floor Replacement

Closed State & local contract opportunity Posted

Solicitation number
S-29100-00017631
State
Oregon
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC codes
Show all 34
Points of contact

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The State of Oregon Department of Corrections is requesting bids on a kitchen floor replacement project at Two Rivers Correctional Institution in Umatilla under ITB 17631, with bids due November 10, 2026 at 2:00 p.m. (PST) and mandatory attendance at a pre-bid conference on October 13, 2026 at 9:00 a.m. (PST) — bidders who do not register for and attend the entire conference will not have their bids evaluated. Award will be made to the lowest responsive and responsible bidder.

The scope encompasses selective demolition of existing flooring systems, concrete substrate preparation, installation of 3/8-inch cementitious self-leveling underlayment (Sika Ucrete UD 200SR or approved equal), application of 3/8-inch red water-based polyurethane cement hybrid flooring with slip-resistant texture, metal fabrications, temporary non-structural metal framing partitions, and high-performance wall coatings. All work is subject to Oregon prevailing wage requirements under ORS 279C.800-279C.870 and apprenticeship requirements mandating that 12 percent of work hours performed by employees in apprenticeable occupations be performed by registered apprentices. Contractors must comply with ORS 279C.533 workforce diversity reporting, maintain a drug testing program, demonstrate Oregon tax compliance, and submit first-tier subcontractor disclosure within two working hours after bid closing for any subcontractor with a contract value of $350,000 or more or 5 percent of the project bid with a minimum of $15,000.

The estimated project cost is between $400,000 and $600,000. The project timeline runs 10 calendar days from Notice to Proceed to start, 250 calendar days to substantial completion, and 280 calendar days to final completion. Liquidated damages are $405.00 per calendar day for delays beyond substantial and final completion dates. Bid security of 10 percent of the bid amount and performance and payment bonds equal to 100 percent of the contract amount are required. Bids must be submitted electronically through the OregonBuys system.

Files

File Type Posted
17631 Plan Set.pdf PDF
IMG_0345.HEIC HEIC file
17631 Specifications.pdf PDF
17631 ITB GTC SC.pdf PDF
IMG_0349.HEIC HEIC file
IMG_0322.HEIC HEIC file
IMG_0339.HEIC HEIC file
IMG_0355.HEIC HEIC file
IMG_0353.HEIC HEIC file
IMG_0329.HEIC HEIC file
IMG_0330.HEIC HEIC file
IMG_0372.HEIC HEIC file
IMG_0362.HEIC HEIC file
IMG_0350.HEIC HEIC file
IMG_0326.HEIC HEIC file
IMG_0367.HEIC HEIC file
IMG_0337.HEIC HEIC file
IMG_0365.HEIC HEIC file
IMG_0352.HEIC HEIC file
IMG_0332.HEIC HEIC file
IMG_0356.HEIC HEIC file
IMG_0336.HEIC HEIC file
IMG_0331.HEIC HEIC file
IMG_0325.HEIC HEIC file
IMG_0357.HEIC HEIC file
IMG_0343.HEIC HEIC file
IMG_0328.HEIC HEIC file
IMG_0364.HEIC HEIC file
IMG_0371.HEIC HEIC file
IMG_0351.HEIC HEIC file
IMG_0333.HEIC HEIC file
IMG_0359.HEIC HEIC file
IMG_0342.HEIC HEIC file
IMG_0347.HEIC HEIC file
IMG_0368.HEIC HEIC file
IMG_0338.HEIC HEIC file
IMG_0327.HEIC HEIC file
IMG_0363.HEIC HEIC file
IMG_0344.HEIC HEIC file
17631 Addenda 1.pdf PDF
IMG_0334.HEIC HEIC file
IMG_0366.HEIC HEIC file
17631 Plan Holder List.pdf PDF
IMG_0323.HEIC HEIC file
IMG_0335.HEIC HEIC file
IMG_0320.HEIC HEIC file
IMG_0324.HEIC HEIC file
IMG_0346.HEIC HEIC file
IMG_0340.HEIC HEIC file
IMG_0358.HEIC HEIC file
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors