IMG_0328.HEIC
HEIC file 2 MB Posted
- Solicitation number
- S-29100-00017631
- Issued by
- Union County, Oregon
About this file
This file is an image (IMG_0328.HEIC) related to the State of Oregon Department of Corrections' kitchen floor replacement project at Two Rivers Correctional Institution in Umatilla. The project scope includes selective demolition of existing flooring systems, concrete substrate preparation, installation of 3/8-inch cementitious self-leveling underlayment, application of 3/8-inch red water-based polyurethane cement hybrid flooring with slip-resistant texture, metal fabrications, temporary non-structural metal framing partitions, and high-performance wall coatings. Bids are due November 10, 2026 at 2:00 p.m. (PST), with mandatory pre-bid conference attendance required on October 13, 2026 at 9:00 a.m. (PST); bidders who fail to register for and attend the entire conference will not have their bids evaluated. The project timeline allows 10 calendar days from Notice to Proceed to start, 250 calendar days to substantial completion, and 280 calendar days to final completion. Award will be made to the lowest responsive and responsible bidder, with bids submitted electronically through the OregonBuys system.
The estimated project cost ranges between $400,000 and $600,000. Bid security of 10 percent of the bid amount and performance and payment bonds equal to 100 percent of the contract amount are required. Contractors must comply with Oregon prevailing wage requirements under ORS 279C.800-279C.870 and apprenticeship requirements mandating that 12 percent of work hours performed by employees in apprenticeable occupations be performed by registered apprentices. Additional compliance requirements include ORS 279C.533 workforce diversity reporting, maintenance of a drug testing program, demonstration of Oregon tax compliance, and submission of first-tier subcontractor disclosure within two working hours after bid closing for any subcontractor with a contract value of $350,000 or more or 5 percent of the project bid with a minimum of $15,000. Liquidated damages are assessed at $405.00 per calendar day for delays beyond substantial and final completion dates.
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .