17631 Addenda 1.pdf

PDF 179 KB Posted

Attached to
Two Rivers Correctional Institution Kitchen Floor Replacement
Solicitation number
S-29100-00017631
Issued by
Union County, Oregon

About this file

This Addendum 1 modifies the Invitation to Bid (ITB S-29100-00017631) issued by the Oregon Department of Corrections Purchasing Section for the Two Rivers Correctional Institution Kitchen Floor Replacement project. The addendum establishes a material revision to the project timeline, prohibiting any on-site demolition, construction, or disruptive work from commencing prior to January 2, 2027, though staging activities are permitted before this date. Additionally, the addendum addresses a substitution request for the flooring system, specifically denying approval of the Poly-Crete MDB System as an approved equal, requiring contractors to furnish and install the originally specified flooring product in full accordance with all contract documents and project specifications.

Bidders are required to acknowledge and sign this addendum and return it by the bid closing date of November 10, 2026, at 2:00 p.m. (PST), as failure to do so may result in bid rejection. This addendum represents a material change to the ITB and becomes part of the original bid documents, with all other contract terms and conditions remaining in full force and effect.

View the file

Other files

File Type Posted
IMG_0370.HEIC HEIC file
IMG_0363.HEIC HEIC file
IMG_0318.HEIC HEIC file
IMG_0349.HEIC HEIC file
IMG_0344.HEIC HEIC file
IMG_0334.HEIC HEIC file
IMG_0336.HEIC HEIC file
IMG_0327.HEIC HEIC file
17631 ITB GTC SC.pdf PDF
IMG_0331.HEIC HEIC file
IMG_0351.HEIC HEIC file
IMG_0325.HEIC HEIC file
IMG_0367.HEIC HEIC file
IMG_0320.HEIC HEIC file
IMG_0347.HEIC HEIC file
IMG_0364.HEIC HEIC file
IMG_0372.HEIC HEIC file
IMG_0356.HEIC HEIC file
IMG_0353.HEIC HEIC file
IMG_0342.HEIC HEIC file
IMG_0365.HEIC HEIC file
IMG_0348.HEIC HEIC file
IMG_0369.HEIC HEIC file
IMG_0341.HEIC HEIC file
IMG_0321.HEIC HEIC file
IMG_0354.HEIC HEIC file
17631 Bid Tab.pdf PDF
IMG_0328.HEIC HEIC file
IMG_0322.HEIC HEIC file
IMG_0323.HEIC HEIC file
IMG_0346.HEIC HEIC file
IMG_0358.HEIC HEIC file
IMG_0319.HEIC HEIC file
IMG_0361.HEIC HEIC file
17631 Plan Holder List.pdf PDF
IMG_0357.HEIC HEIC file
17631 Specifications.pdf PDF
IMG_0329.HEIC HEIC file
IMG_0333.HEIC HEIC file
IMG_0352.HEIC HEIC file
IMG_0362.HEIC HEIC file
IMG_0338.HEIC HEIC file
IMG_0326.HEIC HEIC file
17631 Plan Set.pdf PDF
IMG_0339.HEIC HEIC file
IMG_0368.HEIC HEIC file
IMG_0324.HEIC HEIC file
IMG_0332.HEIC HEIC file
IMG_0350.HEIC HEIC file
IMG_0355.HEIC HEIC file
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon

Department of Corrections Purchasing Section

3723 Fairview Industrial Dr SE Salem, OR 97302

(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov

10/20/2026

ADDENDUM 1

For S-29100-00017631

TRCI Kitchen Floor Replacement

Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.

This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.

1. Revision: The awarded Contractor shall not begin any on-site work inside the institution prior to January 2, 2027. Staging activities may occur before this date; however, no demolition, construction, or other disruptive on-site work is permitted before January 2, 2027.

2. Clarification: Poly-Crete MDB System request for approved equal.

Answer: Not approved - substitution does not demonstrate an improvement in performance, installation efficiency, or overall product value sufficient enough to deviate from the specified product. Accordingly, the contractor shall furnish and install the originally specified flooring product in full accordance with the contract documents and project specifications

This addendum shall be added to and become part of the original Invitation to Bid.

This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.

Company Name: __________________________________________________________

Authorized Signature: ______________________________________________________

Date:_______________________________________

File details come from the government source that posted it. Updated .