Terminal MEP/HVAC Renovations

Closed State & local contract opportunity Posted

Solicitation number
ITB 2026-0330
State
Florida
Responses due

Opportunity facts

Point of contact

Updated .

About this opportunity

The Melbourne Airport Authority is procuring a lump sum contract for Terminal MEP/HVAC Renovations at Melbourne Orlando International Airport in Brevard County, Florida, with a posted date of March 31, 2026, and a sealed bid due date of May 5, 2026, at 2:00 PM EDT. The procurement encompasses the replacement of the main terminal building's mechanical, electrical, and plumbing (MEP) systems, which range in age from 1988 to present, with this first phase focusing on purchasing and installing HVAC and electrical equipment for the central energy plant, including two 500-ton water-cooled chillers, two 500-ton cooling towers, chilled and condenser water pumping systems, new 4000-ampere electrical service with automatic transfer switch and standby generator capability, distribution panels, lighting systems, fire protection modifications, and building automation and controls integration. The successful bidder is responsible for comprehensive scope elements including value engineering, scheduling, permitting, subcontractor bidding and management, full-time construction supervision, document control, RFIs and ASI coordination, inspections, commissioning, staff training, and project closeout, all while maintaining airport operations and coordinating with other contractors to minimize disruption. Key requirements include maintaining traffic management during construction, providing temporary cooling capacity during demolition, conducting full system testing and balancing, delivering as-built drawings and operation/maintenance manuals, and complying with the 2023 Florida Building Code, NFPA standards, and local codes. A non-mandatory pre-bid conference was held on April 9, 2026, at 11:00 AM EDT, with mandatory site visits available between April 14-23, 2026, on Tuesdays through Thursdays in the secure airport area; written questions were accepted only through April 28, 2026. The anticipated construction timeline is 20 calendar weeks for permitting and construction completion, with liquidated damages of $1,000 per day assessed for schedule non-compliance, and bids cannot be withdrawn for 60 calendar days following bid opening. The contractor must demonstrate financial responsibility, relevant experience, and satisfactory completion of similar previous projects.

This is a federally funded procurement through grants from the Federal Aviation Administration (FAA) and the Florida Department of Transportation (FDOT), requiring Davis-Bacon prevailing wage rates and compliance with Buy American requirements and comprehensive FAA provisions for airport projects; no specific set-aside designations for disadvantaged enterprises are mentioned in the available documentation. A bid bond or certified check equal to 5% of the total bid must accompany each proposal, and a public construction bond equal to 100% of the contract amount is required prior to contract execution. The budgeted fund allocation for the project is $3,000,000. The contract will incorporate AIA Document A101-2017 (Standard Form of Agreement) and AIA Document A201-2017 (General Conditions), and the successful bidder must coordinate activities and schedules with Airport Operations, existing tenants, and other contractors working in the vicinity while maintaining fire protection system operation during construction and providing 36-hour advance notice of activities affecting airport operations.

Opportunity text

The Melbourne Airport Authority (MAA) is seeking to replace the main terminal building's mechanical, electrical and plumbing systems. The existing MEP systems range in age to 1988. This will be a multi-year, multi-phase project contingent upon grant funding. This first phase will be for the purchase of the HVAC and electrical equipment for the central energy plant. This is a Lump Sum Contract. The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone. The Scope of Services for the Bidder as part of this Request includes all elements related to value engineering, scheduling, permitting, subcontractor bidding and contracting, supervision of the work, document control of all submittals, RFI`s, ASI`s, etc., coordination of inspections, commissioning, training and project close-out. It will be the responsibility of the awarded Bidder to coordinate their activities and schedules with Airport Operations, tenants, and any other contractors that may be working in the vicinity to minimize conflicts and delays. Special coordination and a high level of expectation by the Owner will be held on the selected Bidder to provide maximum coordination, support, and professionalism to this project. It should be understood by all participating Bidders that the Melbourne Airport Authority reserves the right to supplement, expand, and modify the information and requirements prior to distribution of the final Addendum.

Files

File Type Posted
260330_Bid_Set.pdf PDF
260330_Specifications_1.pdf PDF