Bid Tabulation and Intended Award Summary

This is a bid tabulation and intended award document for the Melbourne Airport Authority's Terminal MEP/HVAC Renovations project located at Melbourne Orlando International Airport in Brevard County, Florida. The project encompasses the replacement of mechanical, electrical, and plumbing systems in the main terminal building, with this first phase focused on purchasing and installing HVAC and electrical equipment for the central energy plant, including two 500-ton water-cooled chillers, two 500-ton cooling towers, chilled and condenser water pumping systems, new 4000-ampere electrical service with automatic transfer switch and standby generator capability, distribution panels, lighting systems, fire protection modifications, and building automation and controls integration. The sealed bid submission deadline was May 5, 2026, at 2:00 PM EDT, with a non-mandatory pre-bid conference held on April 9, 2026, at 11:00 AM EDT and mandatory site visits available between April 14-23, 2026, on Tuesdays through Thursdays. The anticipated construction timeline is 20 calendar weeks for permitting and construction completion, with the contract incorporating AIA Document A101-2017 and AIA Document A201-2017. Written questions were accepted only through April 28, 2026, and bids could not be withdrawn for 60 calendar days following bid opening.

This is a lump sum contract with a budgeted fund allocation of $3,000,000, federally funded through grants from the Federal Aviation Administration and the Florida Department of Transportation, requiring Davis-Bacon prevailing wage rates and compliance with Buy American requirements. A bid bond or certified check equal to 5% of the total bid must accompany each proposal, and a public construction bond equal to 100% of the contract amount is required prior to contract execution. Liquidated damages of $1,000 per day are assessed for schedule non-compliance. The successful bidder must demonstrate financial responsibility and relevant experience with similar projects, coordinate activities with Airport Operations, existing tenants, and other contractors, maintain traffic management during construction, provide temporary cooling capacity during demolition, and comply with the 2023 Florida Building Code and NFPA standards. No specific set-asides for disadvantaged enterprises are mentioned in the documentation.

View the file

Other files

File Type Posted
Addendum_2_-_RFB260330-01_MEP_Reno1.pdf PDF
Addendum_1_-_RFB260330-01_MEP_Reno_Phs_1.pdf PDF
260330_Specifications_1.pdf PDF
260330_Bid_Set.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .