This is Addendum 2 to a Request for Bids issued by the Melbourne Airport Authority for Terminal MEP/HVAC Renovations at Melbourne Orlando International Airport in Brevard County, Florida. The addendum addresses clarifications and corrections to the original bidding documents regarding mechanical, electrical, and plumbing equipment specifications for the central energy plant renovation project. The bid date remains Tuesday, May 5, 2026, at 2:00 PM EDT. The addendum resolves seven critical questions from bidders concerning equipment nomenclature, ampacity ratings, section configurations, and cable routing for the main switchboard (SWBD2), confirming the switchgear designation as SWBD2 with 4000-ampere service rating and updated elevation drawings showing 60-inch depth to accommodate breaker configurations. The addendum confirms the Phase 1 procurement equipment list includes two chillers (CH-1 and CH-2), two cooling towers (CT-1 and CT-2), six pumps (CWP-1/CWP-2/CWP-3 and CHP-1/CHP-2/CHP-3), main distribution panel switchboard SWBD2, and a 1600-kilowatt diesel generator set rated at 2000 kilovoltamperes with 2500-ampere main circuit breaker at 480/277 volts, three-phase output.

The addendum clarifies that all bids must include sales tax, though the Owner may elect to use direct purchasing for tax savings. Bidders must complete pages 1 and 2 of the Buy American Certificate (Form 00 62 33) as required; no separate form for the List of Subcontractors is provided. The project is federally funded through grants from the Federal Aviation Administration and the Florida Department of Transportation, requiring Davis-Bacon prevailing wage compliance and Buy American provisions. The original bid package requires acknowledgment of this addendum by addendum number and date, with failure to do so subject to disqualification. All bidders must sign and return the first sheet of the addendum to Sandra Acevedo at sacevedo@mlbair.com or (321) 723-1194 fax to verify receipt.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 2/PAGE 1 OF 4

ADDENDUM 2 - FINAL

FOR

REQUEST FOR BIDS

For

TERMINAL MEP/HVAC RENOVATIONS

At

MELBOURNE ORLANDO INTERNATIONAL AIRPORT

RFB 260330-01

April 29, 2026

This addendum is issued as part of the Bidding Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original documents. The Bidder shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Bidder shall acknowledge receipt of this addendum in their Bid Package by addendum number and date. Failure to do so may subject Bidder to disqualification.

SENT VIA EMAIL – 4 PAGES TOTAL (including attachments)

________________________________________(NAME OF YOUR COMPANY)

NOTE:

PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIA

E-MAIL OR FAX to SANDRA ACEVEDO, sacevedo@mlbair.com or (321) 723-1194 Fax

THIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.

GENERAL

1. THE BID DATE REMAINS TUESDAY, May 5, 2026, at 2:00 PM (EDT).

SPECIFICATIONS

1. N/A.

DRAWINGS

1. N/A.

QUESTIONS AND RESPONSES:

1. CIF-015: The contract documents refer to this lineup as both SWBD2 and MSB across the one-line, schedule, and elevation views. Please confirm whether SWB2 and MSB are the same equipment and identify the correct designation to use for bidding, submittals, and fabrication.

RESPONSE: Designation for switchgear is SWBD2

2. CIF-016: The scope of work indicates a 4000A service, while the schedule on page E-8 identifies the lineup as 5000A. Please confirm the required service rating for this lineup: 4000A or 5000A mailto:sacevedo@mlbair.com

REQUEST FOR BID for TERMINAL MEP/HVAC RENOVATION PROJECT at the MELBOURNE ORLANDO INTERNATIONAL AIRPORT

RFB260330-01

ADDENDUM 2/PAGE 2 OF 4

RESPONSE: 4000A

3. CIF-017: The drawings show conflicting lineup configurations: plan views indicate SWBD2 with 6 sections, page E-8 shows a 6-section lineup labeled MSB 4000A, and page E-9 one-line shows MSB 4000A with 3 sections. Please confirm the required number of sections for bidding and fabrication

RESPONSE: Switchboard designation is SWBD2. See below for updated elevation showing required sections.

4. CIF-018: If the elevation drawing is followed and two 1200A breakers are stacked in a group-mounted arrangement, the upper breaker would require top cable exit and the lower breaker would require bottom cable exit. Please confirm whether this arrangement is acceptable. If not, provide the required breaker mounting and cable routing configuration

RESPONSE: See attached updated elevation. Equipment shall be 60” deep to allow upper breakers room for bottom feed.

RFB260330-01

ADDENDUM 2/PAGE 3 OF 4

5. CIF-019: Because the scope of work, schedule, one-line, and elevations drawings show conflicting information regarding naming, ampacity, and section count, please confirm which document is intended to govern for bidding and fabrication.

RESPONSE: Switchgear shall be named SWBD2, Ampacity is 4000A, section count has been updated, see elevation below.

RFB260330-01

ADDENDUM 2/PAGE 4 OF 4

6. CIF-020: Please confirm that the items listed below represent the complete Phase 1 procurement equipment list 1.Chillers

a. CH-1

b. CH-2

2.Cooling Towers

a. CT-1

b. CT-2

3.Pumps

a. CWP-1/CWP-2/CWP-3

b. CHP-1/ CHP-2/ CHP-3

4.Main Distribution Panel

a. Switchboard SWBD2

5.Generator

a. DIESEL GENERATOR SET 1600KW/2000KVA 2500A MCB, 480/277V, 3Ø

RESPONSE: Confirmed.

7. CIF-021: Please confirm whether the equipment purchased for this project is eligible for tax-exempt status.

RESPONSE: The Owner, at its option, may elect to use the Owner Direct Purchasing for sales tax savings, however, all bids must include sales tax.

8. CIF-022: Under the required attachments, it lists the Buy American Certificate (00 62 33) and List of Subcontractors. I don't see those forms included in the bid pacakge. Will those forms be posted on the website for us to include in our bid package?

RESPONSE: There is no specific form for the List of Subcontractors. Complete pages 00 62 33 – 1 and 00 62 33 – 2 for the Buy American Certificate.

END OF ADDENDUM #2