State let construction contract, potter CO, bridge maintenance
Closed State & local contract opportunity Posted
- Solicitation number
- 0168-10-081_1025
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
Show all 25
- 95111611 Trunk road
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Texas Department of Transportation (TxDOT) has issued a state-level construction contract (Control Number 0168-10-081) for comprehensive bridge maintenance projects in Potter County, Texas. The procurement encompasses multiple bridge maintenance locations along US 60 and IH 40, with a total project length of approximately 0.843 miles. Specific maintenance sites include bridges at Fillmore Street, Bolton Street, Eastern Street, Nelson Street, Grand Street, and various IH 40 locations. The project, designated as BR 2025(516), requires 825 working days for completion and demands detailed bridge repair and maintenance services. Interested bidders must submit proposals by October 8, 2025, at 1:00 PM to the Texas Department of Transportation in Austin. Contractors seeking additional information can contact Joe Chappell at (806) 378-0071 or (512) 416-2498. The Electronic State Business Daily (ESBD) and Electronic Bidding System serve as the official sources for advertisement and bidding information.
The contract includes a Disadvantaged Business Enterprise (DBE) goal of 8.5%, indicating a commitment to supporting minority and small business participation. A mandatory $100,000 guaranty is required for bidders, which helps ensure contractor reliability and project commitment. The estimated project cost is $16,734,929.85, representing a significant infrastructure investment in Potter County's transportation infrastructure. Potential bidders must demonstrate technical capabilities in bridge maintenance, structural repair, and transportation infrastructure projects. While no specific incumbent vendors are mentioned, the contract appears open to qualified construction and infrastructure maintenance firms with appropriate licensing and experience in bridge rehabilitation and maintenance. The procurement process emphasizes competitive bidding and seeks to maximize both technical competence and cost-effectiveness in addressing critical transportation infrastructure needs.
Files
| File | Type | Posted |
|---|---|---|
| 0168-10-081_1025.txt | TXT text file |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity