State let construction contract, parker CO, bridge replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 0902-38-134_0826
- State
- Texas
- Responses due
Opportunity facts
- NIGP code
- UNSPSC codes
- 95110000 Thoroughfares
- 95111615 Road junction
- 95111609 Crossroad
- 95111501 Easement
- 95111603 Interstate highway or freeway or turnpike
- 95111610 Ring road
- 72141002 Highway and road sign or guardrail construction and repair service
- 72141004 Highway reflector installation service
- 72141509 Trenching service
- 95111614 Single carriageway
Show all 25
- 95111502 Right of way
- 95121647 Elevated roadway or highway
- 95111500 Limited traffic thoroughfares
- 95111600 Open traffic thoroughfares
- 95111503 Access roads
- 95111601 Street or avenue or road or boulevard
- 95111611 Trunk road
- 72141000 Highway and road construction services
- 72141100 Infrastructure building and surfacing and paving services
- 72141106 Gravel or dirt road construction service
- 72141001 Highway and road new construction service
- 95111504 Highway ramp or slip road
- 95111612 Secondary road
- 95111613 Dual carriageway
- 95111602 Intrastate highway or freeway or turnpike
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Texas Department of Transportation is soliciting bids on a bridge replacement project in Parker County with proposals due August 5, 2026.
The scope encompasses full bridge replacement, including demolition of the existing structure and construction of a new bridge meeting current engineering and safety standards. Specific project details, item quantities, and construction specifications are contained in the bidding documents and technical plans.
The contract will be awarded and administered under standard Texas state procurement procedures and timelines. Prevailing wage laws applicable to state construction projects in Texas apply. Awardees must provide performance bonds and insurance as required. Pricing will be submitted on a lump-sum or unit-price basis as specified in the bid documents, with payment contingent upon project milestones and completion of work to specification. The contract term extends through project completion, with specific schedules and milestone dates established in the project timeline.
Interested bidders are required to submit proposals by the due date. Site visits and pre-bid meetings are typically scheduled to allow contractors to assess existing conditions and ask clarifying questions. Bidders must comply with all applicable state procurement regulations and bonding requirements governing public works projects in Texas.
Files
| File | Type | Posted |
|---|---|---|
| 0902-38-134_0826.txt | TXT text file |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity