Southwest Water Treatment Plant – Flocculation Improvements

Closed State & local contract opportunity Posted

Solicitation number
REQ - 0002500
State
Michigan
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from glwater.bonfirehub.com. Updated .

About this opportunity

The Great Lakes Water Authority (GLWA) is seeking a consultant to provide comprehensive services for the Southwest Water Treatment Plant Flocculation Improvements project located in Allen Park, Michigan. The procurement involves replacing existing walking beam flocculators with vertical flocculators across three basins at the water treatment facility, which currently operates between 35-60 MGD with a rated capacity of 240 MGD. Required services include project management, engineering design, construction bid assistance, construction administration, resident project representation (RPR), training, and record document services. The project evaluation will utilize a Qualifications-Based Selection (QBS) process, with criteria weighted as 49% for Technical Work Plan, 48% for Experience and Qualifications, and 3% for Economic Equity. Key project milestones include a 120-day preliminary design phase, 270-day final design phase, 270-day bid and award phase, 850-day construction phase, and 90-day project closeout, with a targeted construction completion date of July 31, 2031. Mandatory pre-proposal meetings and site tours are scheduled for July 9-10, 2025, at the Southwest Water Treatment Plant, with proposal submissions due by August 11, 2025, at 12:00 PM EST and questions accepted through an online portal until July 16, 2025.

The solicitation includes a robust Business Inclusion and Diversity (B.I.D.) Program that offers economic equity credits, with potential 1% credits for having a business presence in Michigan, being located in an economically disadvantaged GLWA service territory, or being situated in any GLWA service territory. Vendors can qualify through various diversity certifications, including Disadvantaged Business Enterprise (DBE), Minority Business Enterprise (MBE), Woman Business Enterprise (WBE), and Small Business Enterprise (SBE). The project has an estimated construction cost of approximately $23 million for the construction phase occurring between 2028 and 2031, with a provisional allowance of $400,000 established and controlled by GLWA. The consultant will be required to maintain various insurance types, including professional liability insurance of $3 million, and provide comprehensive documentation while ensuring compliance with GLWA's standards and specifications. The project involves significant infrastructure upgrades, including replacing flocculator drives, motors, control panels, bearings, instrumentation, and related components, with the goal of improving the overall functionality and maintenance of the water treatment facility's flocculation system.

Opportunity text

GLWA is seeking a consultant to provide comprehensive project management, project coordination, engineering, design, construction bid assistance, construction administration, resident project representation (RPR), training, and record document services related to the replacement of the existing walking beam flocculators with vertical flocculators

Files

File Type Posted
10-Attachment No. 12 REQ-0002500 Solicitation Subcontractor List.pdf PDF
12-Attachment 11 REQ-0002500 QBS Chart - Task Cost Matrix.xlsx XLSX spreadsheet
5-Attachment 5 REQ-0002500 - Arc Flash.pdf PDF
13-Attachment No. 1 REQ-0002500 GLWA Engineering Design Services Contract.pdf PDF
14-REQ-0002500 Solicitation Cover - Instructions to Vendors.pdf PDF
15-07.10.2025 Sign In Sheet REQ-0002500 SW WT Flocculation Project.pdf PDF
19-REQ-0002500 Addendum No. 1.pdf PDF
4-Attachment 3 REQ-0002500 - Record Drawings (5).zip ZIP file
7-Attachment 8 REQ-0002500 - SWWTP Distribution of Hourly Flow Data (1).pdf PDF
9-Attachment 10 REQ-0002500 B.I.D. Requirements (2).pdf PDF
17-REQ-0002500 Southe West Water Treatment Plant Flocculation Improvement Project - Project Overview 7.17.2025.pdf PDF
18-Attachment No. 14 REQ-0002500 SWWTP Walking Beam Flocculator OM.pdf PDF
2-Attachment 6 REQ-0002500 - Design Deliverables Minimum Checklists (1).zip ZIP file
20-REQ-0002500 Southwest Water Treatment Flocculation Improvements Addendum No. 2 080425.pdf PDF
1-Attachment 7 REQ-0002500 - Master Specifications 2024 revised.zip ZIP file
11-Attachment No. 13 REQ-0002500 -GLWA Security Integrity Access Card Request Form w Instructions (Required for Site Tour) (1).pdf PDF
16-07.09.2025 Sign-In Sheet REQ-0002500 SW Water Treatment Flocculation Project Pre.Proposal Meeting.pdf PDF
3-Attachment 4 REQ-0002500 - Ovation Standards CS-12 and CS-13.zip ZIP file
6-Attachment 2 REQ-0002500 - Photos (1).pdf PDF
8-Attachment 9 REQ-0002500 Vendor Certifications Solicitation.pdf PDF
Show all 20

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity