11-Attachment No. 13 REQ-0002500 -GLWA Security Integrity Access Card Request Form w Instructions (Required for Site Tour) (1).pdf

PDF 1 MB Posted

Attached to
Southwest Water Treatment Plant – Flocculation Improvements
Solicitation number
REQ - 0002500
Issued by
Wayne County, Michigan

About this file

The document is a Security & Integrity Access Card Request Form from the Great Lakes Water Authority (GLWA), designed to initiate the process for provisioning access badge card requests for employees and contractors. The form is comprehensive, requiring detailed information across five sections, including team member information, emergency contact details, leadership team or project manager information, access request specifics, and approval signatures. The form is specifically structured to ensure that each individual requesting access provides complete personal and professional details, with mandatory fields covering legal name, work location, contact information, vehicle details, and specific access requirements.

The access card request process includes several key provisions: contractor badges automatically expire annually and require renewal, a copy of a valid driver's license must be attached to the request, and access can be tailored to specific locations (such as LHP, NEP, SPP, SWP, WBB, WRRF, WWP) and times. The form must be signed by a Leadership Team Member (for employees) or Project Manager (for contractors) and then submitted to Security & Integrity at badge-requests@glwater.org for final processing. Optional elements include specifying access start and end dates, requesting badge renewal, and indicating additional access needs. The form is designed to maintain strict security protocols while providing a standardized method for obtaining facility access.

View the file

Other files

File Type Posted
10-Attachment No. 12 REQ-0002500 Solicitation Subcontractor List.pdf PDF
5-Attachment 5 REQ-0002500 - Arc Flash.pdf PDF
14-REQ-0002500 Solicitation Cover - Instructions to Vendors.pdf PDF
9-Attachment 10 REQ-0002500 B.I.D. Requirements (2).pdf PDF
17-REQ-0002500 Southe West Water Treatment Plant Flocculation Improvement Project - Project Overview 7.17.2025.pdf PDF
2-Attachment 6 REQ-0002500 - Design Deliverables Minimum Checklists (1).zip ZIP file
19-REQ-0002500 Addendum No. 1.pdf PDF
4-Attachment 3 REQ-0002500 - Record Drawings (5).zip ZIP file
13-Attachment No. 1 REQ-0002500 GLWA Engineering Design Services Contract.pdf PDF
12-Attachment 11 REQ-0002500 QBS Chart - Task Cost Matrix.xlsx XLSX spreadsheet
20-REQ-0002500 Southwest Water Treatment Flocculation Improvements Addendum No. 2 080425.pdf PDF
7-Attachment 8 REQ-0002500 - SWWTP Distribution of Hourly Flow Data (1).pdf PDF
18-Attachment No. 14 REQ-0002500 SWWTP Walking Beam Flocculator OM.pdf PDF
15-07.10.2025 Sign In Sheet REQ-0002500 SW WT Flocculation Project.pdf PDF
16-07.09.2025 Sign-In Sheet REQ-0002500 SW Water Treatment Flocculation Project Pre.Proposal Meeting.pdf PDF
1-Attachment 7 REQ-0002500 - Master Specifications 2024 revised.zip ZIP file
8-Attachment 9 REQ-0002500 Vendor Certifications Solicitation.pdf PDF
6-Attachment 2 REQ-0002500 - Photos (1).pdf PDF
3-Attachment 4 REQ-0002500 - Ovation Standards CS-12 and CS-13.zip ZIP file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

• Legal Name: Enter name as shown on your Driver's License

• Employee/Contractor: Select a value from the drop-down list

• GLWA Group: Select a value from the drop-down list with the primary Group

• Assign Primary Work Location: Select a value from the drop-down list

• Email Address: Enter your GLWA/Contractor email address

• Home Address: Enter your own home address as shown on your Driver's License

• Ceridian Employee No.: Enter your Ceridian ID if you are an Employee

• Vehicle Info: Enter Year, Make, Model & Plate of your primary vehicle

• Company Name/ Contract No. & Name: Enter your company name, contract number and name if you are a Contractor.

Instructions for the Security & Integrity Access Card Request Form

The Security & Integrity Access Card Request Form initiates the process for Security & Integrity to set up and provision access badge card requests. This form is to be used for either Employee or Contractor and only one person at a time. All fields are mandatory unless indicated as Optional or do not apply as an Employee or Contractor.

Section 5: Approvals Signatures are required. Ensure the LTM or Project Manager have signed the form (electronically or manually). Security & Integrity will sign the form once you email them the completed form at badge-requests@glwater.org and they have completed the access request.

• Access Start and End Date (Optional): Use the calendar to indicate the start and end date to access the facility. End date is Optional for Employees but should be used for a Contract End Date for Contractors. Access will expire for Contractors after 1 year.

• Attached Copy of Driver's License: Check the box indicating you are attaching a copy of your Driver's License to the request. This is required for every request; no access will be provisioned without a copy of a valid Driver's License.

• Badge Renewal (Optional): Check the box to indicate access renewal is needed.

Contractor badges automatically expire annually (if not requested prior) from date of issue and require renewal using this form.

• Additional Access Request (Optional): Check the box indicating that this request is one for additinoal access than

• Driver's License No. Enter your current valid Driver's License no.

• State/Province: Enter your state/province as it appears on the Driver's License

• Access Locations Needed (Optional - see Copy Access from Team Member): Check one or more of the boxes. Fill out the Other text box if the facilities are not included as a checkbox.

• Gates/Doors (Optional - see Copy Access from Team Member): Enter All the Gates/ Doors you need to access (or enter in "All Gates/Doors" if applicable)

• Access Times (Optional - see Copy Access from Team Member): Enter the expected times needed of facility access (ex. M-F 6am-6pm)

• Copy Access from Team Member (Optional - see Access Locations Needed, Gates/ Doors, and Access Times): Enter a team member's name in this box to copy access in lieu of providing the details of Access Locations Needed, Gates/Doors and Access Times fields.

Section 2: Team Member Emergency Contact Info Provide the name of your preferred primary emergency contact name and phone numbers.

Section 3: Leadership Team Member (LTM)/ Project Manager (PM) Info Provide the LTM (if Employee) or PM (if Contractor) name, email address & phone no.

Section 4: Team Member Access Request

Section 1: Team Member Info mailto:badge-requests@glwater.org

SECURITY & INTEGRITY

ACCESS CARD REQUEST FORM

Revised: 1/14/2021

This form initiates the process for Security & Integrity to set up and provision access badge requests. Please submit completed form to badges-request@glwater.org.

Legal Name (as shown on Driver's License) Employee/Contractor*

Assigned Primary Work Location

GLWA Group

GLWA/Contractor Email Address

Section 1: TEAM MEMBER INFO:

Section 2: TEAM MEMBER EMERGENCY CONTACT INFO:

Primary Phone No.

Ceridian Employee No. (if Employee)

Vehicle Info (Year, Make, Model, Plate)

Home Address (Street Address, City, State, Zip Code)

Company Name / Contract No. & Name (if Contractor) Leadership Team Member/Project Manager

LTM / PM Date

Date

Section 3: LEADERSHIP TEAM MEMBER (LTM) / PROJECT MANAGER (PM) INFO:

*Contractor badges automatically expire annually (if not requested prior) from date of issue and require renewal using this form.

Access End Date*

LTM / PM Email

LTM / PM Phone No.

Emergency Contact Name Primary Phone No. Secondary Phone No.

Section 5: APPROVALS:

Section 4:: TEAM MEMBER ACCESS REQUEST:

OR: Copy Access from Team Member

Security & Integrity

Badge Renewal*? Additional Access Request?

Access Start Date

Attached Copy of Driver's License?

Driver's License No.

State/Province

Gates/Doors (separate items using commas)

Access Times (e.g. M-F 6am-6pm ; 24/7)

LHP NEP SPP SWP WBB

WRRF WWP

Access Location(s) Needed:

Other(s)

GLWA Security & Integrity Access Card Request Form--
New Access Request Form_DRAFT (1)
Access Card Request form
Contractor/Consultant Name:
Assigned Location: [Please select]
Leadership Team Member/ Project Manager:
Driver's License Copy: Off
Security & Integrity Signature Date:
Team Member Signature Date:
State:
Driver's License Number:
LTM / PM Email Address:
Access Start Date:
Access End Date:
TM Email Address:
Employee/Contractor: [Please select]
Group: [Please select]
Badge Renewal: Off
Additional Access Request: Off
LTM / PM Phone Number:
Ceridian Employee ID:
Vehicle Info:
Street Address, City, State, Zip Code:
Company/Contractor Address:
TM Phone Number:
Emergency Contact Name:
Emergency Contact Primary Phone:
Emergency Contact Secondary Phone:
Doors/Gates:
Access Days/Times:
Copy Access from Team Member:
LHP: Off
NEP: Off
SPP: Off
SWP: Off
WBB: Off
WWP: Off
WRRF: Off
Other Location:

File details come from the government source that posted it. Updated .