12-Attachment 11 REQ-0002500 QBS Chart - Task Cost Matrix.xlsx
XLSX spreadsheet 47 KB Posted
- Solicitation number
- REQ - 0002500
- Issued by
- Wayne County, Michigan
About this file
The document is a Qualifications-Based Selection (QBS) Task Cost Matrix spreadsheet for the Great Lakes Water Authority (GLWA) related to the Southwest Water Treatment Plant Flocculation Improvements project in Michigan. The contract (0002500) outlines eight primary tasks including project kickoff meeting, project management, preliminary (30%) design, final design, bid and award, construction administration, resident project representation, and system operations & maintenance with training. The project involves replacing existing walking beam flocculators with vertical flocculators and requires comprehensive consulting services for project management, engineering, design, construction support, and training.
The cost matrix includes a provisional allowance of $400,000.00 established and controlled by GLWA, with detailed cost breakdown sections for each task that allow for tracking direct labor hours, indirect costs, overhead, other direct costs, subconsultant expenses, and contract markups. The spreadsheet provides a template for consultants to estimate and document project costs across various project phases, with specific columns for tracking labor hours, costs, and additional expenses. A notable supplemental requirement is the calculation of a composite rate for Resident Project Representation (RPR) that can be used for future billing purposes.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task 1
| Qualificaions Base Selection Task Order Cost Matrix (FSA_PRO_TPL_0005) | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 1- Project Kickoff Meeting | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 2
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 2- Project Management | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 3
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 3- Preliminary (30%) Design | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 4
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 4- Final Design | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 5
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 5- Bid and Award | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 6
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 6- Construction Administration | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Task 7
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 7- Resident Project Representation | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost | ||
| Supplemental Information | ||
| Provide a composite rate for the RPR that can be used for billing purposes later. If the project has one RPR, this should be by taking the total cost of Task 7 and dividing by the total hours used to establish the Task 7 cost above. |
Resident Project Representation Compsite Rate $
Task 8
| Qualificaions Base Selection Task Order Cost Matrix | ||
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | ||
| Task 8- System O&M, SOPs and Training | ||
| Direct Labor | Estimated Hours | Cost |
| 1 | ||
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| Indirect Cost - Overhead | % | |
| Other Direct Cost | ||
| Equipment | ||
| Travel | ||
| Other (list as needed) | ||
| Subtotal | ||
| Subconsultant/Subcontractors | Estimated Hours | |
| 1 | ||
| 2 | ||
| Subtotal | ||
| Contract Mark-up for Services | ||
| Direct Labor | % | |
| Indirect Labor | % | |
| Subconsultant/Subcontractors | % | |
| Subtotal Contract Mark-up for Services | ||
| Total Cost |
Provisional Allowance
| Qualificaions Base Selection Task Order Cost Matrix | |
| Contract: 0002500 Title: Southwest Water Treatment Plant-Flocculation Improvements | |
| Provisional Allowance (Established and Controlled by GLWA) | |
| Total Cost | $400,000.00 |
File details come from the government source that posted it. Updated .