The Berkshire Regional Planning Commission is soliciting bids on behalf of the Town of Richmond, Massachusetts, for the Sleepy Hollow Road Bridge Replacement Project under IFB #FY27-RICHMOND. A mandatory pre-bid conference and site visit is set for December 3, 2026 at 11:00 a.m., and bids are due December 17, 2026 at 1:00 p.m. through the OpenGov platform. Contractors must hold MassDOT Highway Division prequalification in the Bridge-Culverts (small bridge/culvert) classification.

The work replaces an undersized corrugated HDPE culvert carrying Sleepy Hollow Road over Cone Brook, a designated Cold-Water Fishery, with a precast concrete three-sided frame bridge on precast spread footings and wingwalls. Scope includes demolition, dewatering, a temporary bypass pipe or reuse of the existing culvert, TL-2 W-beam guardrail, a full-depth gravel section, and streambed restoration. A wildlife specialist must lead a turtle protection plan, and the bid includes 40 hours of turtle monitoring. Construction must comply with the Massachusetts Division of Fish & Wildlife NHESP Order of Conditions, the Army Corps of Engineers General Permit, and Richmond's Conservation Order of Conditions. The gravel road will remain unpaved. Traffic will use a roadway closure with detour, supplemented by short-term lane closures during non-peak times. The site is 0.4 miles east of the intersection of State Route 41 and Sleepy Hollow Road in Richmond.

The bid carries 32 unit-price line items plus four fixed-cost items totaling $9,000. Bid security is 5% of the total bid amount, delivered as a certified check, bid bond, or cashier's check. Performance and payment bonds are each 50% of the total contract price. Liability insurance must be at least $2.0 million combined single limit, naming the Town as additional insured. Prevailing wage rates under Massachusetts General Laws Chapter 149 apply, and contractors must submit certified payrolls with each pay application. Liquidated damages are $1,000 per day for missing substantial completion, and retainage is 5%. The contract will be awarded to the lowest responsible and eligible bidder. Bids remain valid for 30 days after opening, and the successful bidder must execute the contract and bonds within 10 days of written acceptance. Required submissions include proof of tax compliance, a non-collusion certification, debarment status, OSHA training compliance, and references for at least three similar projects.

Opportunity text

The Sleepy Hollow Road Bridge Replacement Project is located on a rural road in the Town of Richmond located approximately .4 miles east from the intersection of ST 41 and Sleepy Hollow Road. See Location Map below. The bridge crosses Cone Brook, a designated Cold-Water Fishery to the south of the crossing; therefore, construction must protect the stream and restore it to its natural state. Work shall be done, according to the Order of Conditions, Ma Division of Fish & Wildlife NHESP and the Army Corp of Engineers General Permit. The project will require wildlife specialist as part of the turtle protection plan and requirements with the Richmond's Conservation Order of Conditions. The existing culvert is considered too small to convey high stream flows which has caused significant road overtopping and erosion. The proposed replacement project will replace the culvert with a precast concrete frame structure with precast concrete wingwalls and restore the stream channel to its natural state. The Town will keep the gravel road and not pave it.