3-24-95_R-06-016_SIGNED_PLANS.pdf

PDF 4 MB Posted

Attached to
Sleepy Hollow Road Bridge Replacement Project
Solicitation number
FY27-RICHMOND
Issued by
Berkshire County, Massachusetts

About this file

This file consists of signed civil engineering plans for the Sleepy Hollow Road Bridge Replacement Project in Richmond, Massachusetts, prepared by a professional engineering firm located in Needham, Massachusetts. The project involves replacement of an existing undersized culvert that crosses Cone Brook, a designated Cold-Water Fishery, with a precast concrete frame structure and precast concrete wingwalls. The work is bounded by project stations 11+05 to 11+90 on Sleepy Hollow Road and must comply with the Order of Conditions issued by the Massachusetts Division of Fish & Wildlife NHESP and the Army Corps of Engineers General Permit. The plans include detailed specifications for culvert installation, streambed restoration to natural conditions, guardrail installation, temporary traffic control, erosion and sediment control measures, and roadway improvements. Two soil boring locations (B-1 and B-2) were completed on April 20, 2022, revealing primarily gravel, sand, and till soil compositions with groundwater present at shallow depths. The project maintains the existing gravel road surface without paving and incorporates rock steps and sediment control barriers to protect the stream environment.

The plans establish full-depth roadway specifications including a six-inch compacted dense graded crushed stone surface course and twelve-inch gravel borrow base, with typical sections showing fourteen-foot travel lanes on each side with two percent cross-slopes. Proposed improvements include slope restoration with compost blankets and seeding, guardrail installation with deep posts and trailing anchorage, and streambed restoration using natural streambed material. The project requires a wildlife specialist to implement turtle protection measures per Richmond's Conservation Order of Conditions. The plans were plotted on January 7, 2025, and signed on March 24, 2025, indicating final design approval. Temporary traffic control includes bridge closure signage, detour routes on surrounding roads including Swamp Road and Dublin Road, and temporary barriers with reflectorized drums or cones to secure the work zone and direct traffic flow during construction activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11 12

PI +72.61

PI +01.07

PI +17.14

PI +29.10

PI +68.69

B-2

B-1

BM#2 - TOP OF HUB,

E/GRAVEL RD,

EL 100.0

N2973020.7855

E154911.0322

X

N 1°

'1

4" E

.6

0'

N 88° 24' 46" W 278.42'

SLEEPY HOLLOW RD

APPROX ROW

APPROX ROW

FAIRFIELD

BROOK

SLEEPY HOLLOW

BROOK

PROJECT BEGIN

STA 11+05

N2973033.0573 E154923.0944

PROJECT END

STA 11+90

N2973035.4118 E154838.1266

SLEEPY HOLLOW RD BL

ROCK STEP/FOOTERS (TYP)

(SEE SHEET13 FOR DETAILS)

HIGHWAY GUARDRAIL (TYP)

(SEE SHEET 9 FOR DETAILS)

.0

0'

C O

N E

BR

O

O K

.0

0'

WF-D1

WF-D2

WF-A13

WF-A14

BVW-F5 BVW-F6 BVW-F7

BVW-F8

BVW-F9

BVW-F10

WF-C19

WF-C18

WF-C17

WF-C16

WF-A12

WF-A11

WF-A10

WF-A9

BVW-E4

BVW-E5

BVW-E6

BVW-E7

BVW-E8

BVW-E9 BVW-E10

96 97

97 98

MATCH INTO EXIST.

20+00±

+16.72

SLEEPY HOLLOW

BROOK BL

CONE BROOK BL

R-06-016 (CQB)

SLEEPY HOLLOW RD

D U

BL

IN

R D

SW

AM

P

RD

ST

AT

E R

D

LENOX RD

RICHMOND

LENOX

SUMMIT RD

E RD

RESERVOIR RD

O

SCEO

LA RD

D U

BL

IN

R D

C O

N E

BR

O

O K

ASSUMED

DATUM

BASE ELEV

85.00

10+75 11+00

0.

12+00 12+2510+75 11+00 12+00 12+25

1.17% -0.50% -1.26%

M

AT

C H

E

XI

ST

S

TA

1+

.0

EL

EV

.0

8±

G R

AD

E

BR

EA

K

ST

A

+3

9.

EL

EV

.4

G R

AD

E

BR

EA

K

ST

A

+6

1.

EL

EV

.3

M

AT

C H

E

XI

ST

S

TA

1+

.0

EL

EV

.0

0±

ASSUMED

DATUM

BASE ELEV

85.00

.0

19+65

.0

20+00

0.

.0

21+0019+65 20+00 21+00

K

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d_

H D

.d w g 7-

Ja n-

:3

PM

Pl ot te d on

N

N

INDEX

SHEET NO. DESCRIPTION

1 KEY PLAN LOCUS PROFILE & NOTES

2 GENERAL NOTES

3 BORING LOGS

4 GENERAL PLAN AND ELEVATION

5 DEMO & CONTROL OF WATER

6 BACKFILL & STREAMBED RESTORATION

7 THREE-SIDED FRAME DETAILS

8 SUBSTRUCTURE DETAILS

9 GUARDRAIL DETAILS 1 OF 2

10 GUARDRAIL DETAILS 2 OF 2

11 ROADWAY PLAN AND TYPICAL SECTION

12 EROSION AND SEDIMENT CONTROL DETAILS

13 MISC. DETAILS - STREAMBED RESTORATION

14 TEMPORARY TRAFFIC CONTROL PLAN

BardowA Text Box 3/24/2025

K

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- C ul ve rt

Pl an s.

dw g 7-

Ja n-

:4

PM

Pl ot te d on

BardowA

BORING LOG

COMPREHENSIVE ENVIROMENTAL INC

BORING CONTRACTOR:

General Borings Inc 201 Straitsville Rd Prospect, CT 06712

LOG PREPARED BY:

CONTR.____ CEI.__X__

GROUND WATER OBSERV.

TYPE

AT _1_ FT. AFTER _1_ HOUR SIZE ID

HAMMER WT.

AT ___ FT. AFTER ___ HOURS HAMMER FALL

LOCATION OF BORING:

DEPTH

BELOW

GROUND SURFACE TO ____ FT.,

W = WASHEDD = DRY

UP = UNDISTURBED, PISTON

PROPORTIONS USED:

0 to 4 Very Loose

4 to 10 Loose

10 to 30 Medium Dense

USED ____CASING:

C = CORED

TRACE = 0-10%,

Granular Soils (blows per ft.)

30 to 50 Dense Over 50 Very Dense

P = PIT

THEN ____ CASING

A = AUGER

UB = UNDISTURBED, BALL CHECK

LITTLE = 10-20%,

0 to 2 Very Soft

2 to 4 Soft

SOME = 20-40%,

V = VANE TEST

TO ____ FT. FOOTAGE IN EARTH

FOOTAGE IN ROCK

OER = OPEN END ROD NO. OF SAMPLES

AND 40-50%

Cohesive Soils (blows per ft.)

8 to 15 Stiff 15 to 30 Very Stiff

4 to 8 Medium Soft Over 30 Hard

Standard Penetration Test (SPT) = 140lb hammer falling 30"

HOLE NO. B-1 & B-1A TYPE

19'

SPT

5-7 SS 1 3 8 7

7-9 SS 2 3 2 2

9-11 SS 1

11-13 SS 27

13-15 SS 46

50+

15-17 SS 19 57 28 28

17-19 SS 105 32 100/3"

3 24" 8"

CASING

BLOWS

SURFACE PER FOOT

SAMPLE

DEPTH

FROM-TO

1-3

TYPE OF

SAMPLE

Blows Per 6" On Sampler

0-6

SS 21

6-12

12-18

18-24

One Hartford Square East Suite 227, New Britain, CT 06052 41 Main St, Bolton, MA 01740

21 Depot St, Merrimack, NH 03054

TOWN, STATE: Richmond, MA PROJECT NAME: HVA Culvert Replacement

CEI NO.: 386-1

HOLE NO:

Long:

OFFICE: MA

AUGER CASING SAMPLER CORE BAR.

SS

2 in

140 lb 30 in

SURFACE ELEVATION: 98.632 FT.

DATE START-FINISHED: 4/20/2022 - 4/20/2022

BORING FOREMAN: John Wyant INSPECTOR: Joseph Johanson

SOILS ENGR.: Sebastian Amenta

FIELD IDENTIFICATION OF SOIL & ROCK

INCL. COLOR, LOSS OF WASH WATER,

JOINTS IN ROCK, ETC.

SAMPLE

NO. PEN. REC

1 24" 18"

B-1 & B-1A

BORING TYPE: H.S.A

Lat.: 42.3882135

-73.3593058

SHEET 1 OF 1

3-5 SS 11 9 5 4 2 24" 0"

4 24" 16"

5 24" 3"

6 24" 18"

24" -

24" 9"

8 24" -

Dry, Dense, Light Grey to Light Brown Coarse GRAVEL - GP

Wet, Medium Dense, Brown to Light Grey GRAVEL and Fine to Coarse SAND - GM

Wet, Loose, Dark Brown to Grey GRAVEL some SILT some ORGANICS - GM

No Recovery

Wet, Very Dense, Light Grey to Brown Large GRAVEL some Fine to Coarse SAND - GM (Till)

Augered through 14 FT. depth. Moved Auger 3 FT to new location. Augured down to 15 FT.

Wet, Very Dense, GRAVEL and ROCK, Trace SAND - GC (Till)

Rock Fragments. End of Boring.

Wet, Very Loose, Light Brown GRAVEL

GM

BORING LOG

COMPREHENSIVE ENVIROMENTAL INC

BORING CONTRACTOR:

General Borings Inc 201 Straitsville Rd Prospect, CT 06712

LOG PREPARED BY:

CONTR.____ CEI.__X__

GROUND WATER OBSERV.

TYPE

AT _4_ FT. AFTER _0_ HOUR SIZE ID

HAMMER WT.

AT ___ FT. AFTER ___ HOURS HAMMER FALL

LOCATION OF BORING:

DEPTH

BELOW

GROUND SURFACE TO ____ FT.,

W = WASHEDD = DRY

UP = UNDISTURBED, PISTON

PROPORTIONS USED:

0 to 4 Very Loose

4 to 10 Loose

10 to 30 Medium Dense

USED ____CASING:

C = CORED

TRACE = 0-10%,

Granular Soils (blows per ft.)

30 to 50 Dense Over 50 Very Dense

P = PIT

THEN ____ CASING

A = AUGER

UB = UNDISTURBED, BALL CHECK

LITTLE = 10-20%,

0 to 2 Very Soft

2 to 4 Soft

SOME = 20-40%,

V = VANE TEST

AND 40-50%

TO ____ FT. FOOTAGE IN EARTH

FOOTAGE IN ROCK

OER = OPEN END ROD NO. OF SAMPLES

HOLE NO. B-2

Cohesive Soils (blows per ft.)

8 to 15 Stiff 15 to 30 Very Stiff

4 to 8 Medium Soft Over 30 Hard

Standard Penetration Test (SPT) = 140lb hammer falling 30"

TYPE

SPT

5-7 SS 3 4 8 11

CASING

BLOWS

SURFACE PER FOOT

SAMPLE

DEPTH

FROM-TO

1-3

TYPE OF

SAMPLE

Blows Per 6" On Sampler

0-6

SS 14

6-12

12-18

18-24

One Hartford Square East Suite 227, New Britain, CT 06052 41 Main St, Bolton, MA 01740

21 Depot St, Merrimack, NH 03054

TOWN, STATE: Richmond, MA PROJECT NAME: HVA Culvert Replacement

CEI NO.: 386-1

HOLE NO:

Long:

OFFICE: MA

AUGER CASING SAMPLER CORE BAR.

SS

2 in

140 lb 30 in

SURFACE ELEVATION: 98.225 FT.

DATE START-FINISHED: 4/20/2022 - 4/20/2022

BORING FOREMAN: John Wyant INSPECTOR: Joseph Johanson

SOILS ENGR.: Sebastian Amenta

FIELD IDENTIFICATION OF SOIL & ROCK

INCL. COLOR, LOSS OF WASH WATER,

JOINTS IN ROCK, ETC.

Dry, Dense, Light Brown to Grey SAND with GRAVEL - GP

SAMPLE

NO. PEN. REC

1 24" 18"

B-2

BORING TYPE: H.S.A

Lat.: 42.3881847

-73.3595073

SHEET 1 OF 1

3-5 SS 16 9 4 4 Damp, Medium Dense, Light Brown to Dark Grey GRAVEL trace SAND - SP

Damp, Medium Dense, Dark Grey and Brown SAND little GRAVEL - SM

7-9 SS 11 7 4 3 Wet, Medium Dense, Dark Brown SAND with GRAVEL trace SILT - SP

9-11

11-13

13-15

SS

SS

SS

No Recovery

Wet, Medium Dense, Dark Brown SAND with GRAVEL trace SILT - SM

Wet, Dense, Brown to Grey GRAVEL and SAND trace SILT - GM

15-17 SS 10 19 21 22 Wet, Dense, Brown to Grey GRAVEL and SAND some SILT - GM

17-19 SS 15 16 18 22 Wet, Dense TILL and SILT - SM

2 24" 12"

3 24" 13"

4 24" 8"

24"

24"

24"

0"

10"

5"

8 24" 2"

9 24" 13"

K

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- C ul ve rt

Pl an s.

dw g 7-

Ja n-

:4

PM

Pl ot te d on

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- C ul ve rt

Pl an s.

dw g 7-

Ja n-

:4

PM

Pl ot te d on

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- D em o

C on tro l o f W at er .d w g

7- Ja n-

:4

PM

Pl ot te d on

N N

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- D em o

C on tro l o f W at er .d w g

7- Ja n-

:4

PM

Pl ot te d on

N

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- F ra m e

D et ai ls

.d w g 7-

Ja n-

:4

PM

Pl ot te d on

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- S ub

D et ai ls

.d w g 7-

Ja n-

:4

PM

Pl ot te d on

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- G ua rd ra il D et ai ls .d w g

7- Ja n-

:4

PM

Pl ot te d on

BardowA

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- G ua rd ra il D et ai ls .d w g

7- Ja n-

:4

PM

Pl ot te d on

BardowA

14.0' TRAVEL LANE14.0' TRAVEL LANE

2.0% 2.0%

FULL DEPTH ROADWAY

3.00'

LEVEL

0.75'

LEVEL

VARIES .73' TO 5.9'±

PROP 1'' COMPOST

BLANKET & SEED (2:1

MAX) (TYP)

GUARDRAIL, DEEP

POST (SINGLE

FACED)

VARIES 1.0' TO 3.7'±

EXISTING

GROUND

ORDINARY

BORROW (TYP)

GUARDRAIL, TL-2

(SINGLE FACED)

11 12

PI +72.61

PI +01.07

PI +17.14

PI +29.10

PI +68.69

PI

.1

19+56.94

SLEEPY HOLLOW RD

FAIRFIELD

BROOK

PROJECT END

STA 11+05

N2973033.0573 E154923.0944

APPROX ROW

APPROX ROW

RESTORE STREAMBED

WITH NATURAL

STREAMBED MATERIAL

(TYP)

SLEEPY HOLLOW

BROOK

C O

N E

BR

O

O K

BM#2 - TOP OF HUB,

E/GRAVEL RD,

EL 100.0

N2973020.7855

E154911.0322

X

PROP TRAILING

ANCHORAGE (TYP)

R=155'

N 88° 24' 46" W 278.42'28 .0

0'

PROP GUARDRAIL,

DEEP POST (TYP)

2.0% 2.0%

MATCH

EXIST

MATCH

EXIST

PROP FULL DEPTH

ROADWAY

R=155'

PROP COMPOST BLANKET

& SEED (TYP)

PROP SEDIMENT CONTROL

BARRIER (TYP)

PROP SLOPE LIMIT (TYP)

PROP GRADE BREAK (TYP)

PAVEMENT MILLING

MULCH (TYP)

.0

0'

2.

0%

2.

0%

MA

TC

H

EX

IST

MA

TC

H

EX

IST

PROP FULL DEPTH ROADWAY

PROP ROCK STEPS (TYP)

+72.98

OFFSET: 14.00

+26.98

OFFSET: 14.00

SLEEPY HOLLOW RD BL

PROJECT END

STA 11+90

N2973035.4118 E154838.1271

+26.98

OFFSET: 14.00

+72.98

OFFSET: 14.00

WF-D1

WF-D2

WF-D4

WF-D3

WF-A13

WF-A14

WF-A15

BVW-F5BVW-F4 BVW-F6 BVW-F7

BVW-F8

BVW-F9

BVW-F10

WF-C21

WF-C20

WF-C19

WF-C18

WF-C17

WF-C16

WF-C15

WF-C14

WF-A12

WF-A11

WF-A10

WF-A9

BVW-E4

BVW-E5

BVW-E6

BVW-E7

BVW-E8

BVW-E9 BVW-E10

96 97

97 98

MATCH INTO EXIST.

19+84.91±

MATCH INTO EXIST.

20+90.37±

.6

.6

+04.27

+93.56

+95.75

+06.45

K

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d_

H D

.d w g 7-

Ja n-

:4

PM

Pl ot te d on

HOR. SCALE IN FEET

VER. SCALE IN FEET

4 4 8

4 4 8

PAVEMENT NOTES:

PROPOSED FULL DEPTH PAVEMENT

SURFACE COURSE: 6'' COMPACTED DENSE GRADED CRUSHED STONE (M2.01.7)

BASE: 12" GRAVEL BORROW, TYPE B

(EXISTING BASE MATERIAL MAY REMAIN IF SUITABLE AS DETERMINED BY THE

ENGINEER)

N

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d_

H D

.d w g 7-

Ja n-

:4

PM

Pl ot te d on

ENSURE FIRM CONTACT WITH

GROUND TO PREVENT FLOW

UNDERNEATH TUBES

FOR SLOPES 3:1 OR AS

NECESSARY, STAKE OR

OTHERWISE SUPPORT TUBES

(I.E., TREES, CINDER BLOCKS)

AREA OF SOIL

DISTURBANCE

BIODEGRADABLE

FABRIC

PROTECTED ZONE

FLOW

12" dia.* installed

CAPTURE SEDIMENT AND

PREVENT FLOW OFF SITE

*9 INCH MAY BE USED FOR FLATTER SURFACES

WITH APPROVAL FROM ENGINEER

REDUCE HIGH WATER

FLOW ONTO WORK ZONE

PLACE TUBE AS CLOSE TO LIMIT OF SOIL DISTURBANCE

AS POSSIBLE, ALONG CONTOURS, AND PERPENDICULAR

TO FLOW.

ADJUST LOCATION AS REQUIRED FOR OPTIMUM

EFFECTIVENESS. DO NOT INSTALL IN WATERWAYS.

CURVE ENDS

UPHILL

EXISTING

TREE

MIN. 3 FT OVERLAP

FOR CONTINUOUS

BARRIER.

HARDWOOD STAKES PLACED

OUTSIDE OF TUBES OR PER

MANUFACTURERS' INSTRUCTION

PROTECTED ZONE

FLOW

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d

- S tre am be d R es or at io n D et ai ls .d w g

7- Ja n-

:4

PM

Pl ot te d on

BRIDGE CLOSED

BRIDGE

CLOSED

BRIDGE

CLOSED

R11-2

ON TYPE III

BARRICADE

R11-2

ON TYPE III

BARRICADE

PROP TEMP BARRIER

PROP TEMP BARRIER

PROP

REFLECTORIZED

DRUM OR CONE

(TYP)

SLEEPY HOLLOW

ROAD

C O

N E

B R

O O

K

BRIDGE CLOSED

1/2 MILE AHEAD

LOCAL TRAFFIC ONLY

BRIDGE CLOSED

1500 FEET AHEAD

LOCAL TRAFFIC ONLY

DETOUR

ROAD

CLOSED

AHEAD

DETOUR

DETOUR DETOURDETOURDETOUR

DETOUR

DETOUR

DETOUR DETOUR

END

DETOUR

END

DETOUR

DETOUR

AHEAD

W20-2 36''X36''

M4-9AL

30''X24''

M4-9AL

30''X24''

M4-9AR

30''X24''

M4-9AR

30''X24'' M4-9R

30''X24''

M4-9R 30''X24''

M4-9L 30''X24'' M4-9L

30''X24''

M4-8a 24''X18''

M4-8a 24''X18''

W20-3 36''X36''

R11-3b M4-10L 60''X30''

48''X18'' (ON TYPE III

BARRICADE)

R11-3b M4-10R 60''X30''

48''X18'' (ON TYPE

III BARRICADE)

SW

AM

P

RD

M

AR

C H

H

AR

E R

D

SLEEPY HOLLOW RD

D U

BL

IN

R D

D U

BL

IN

R D

SUMMIT RD

SEE BRIDGE

CLOSURE

DETAIL

ST

AT

E R

D

CANAAN RD ROAD

CLOSED

AHEAD

W20-3 36''X36''

DETOUR

M4-9R

30''X24''DETOUR

M4-9AR

30''X24''

CO

NE

B

RO

O K

ROSSITER RD

W R

D

K

EN

D

R

IC

K S

TR

EE

T N

EE

D

H A

M , M

A

1-

5-

1-

5-

(F A

X)

R

EG

IS

TE

R

ED

P R

O

FE

SS

IO

N A

L

EN

G

IN

EE

R

D A

TE

D

AT

E D

R W

. B Y

C

AL

C . B

Y

AP

PR

V.

B Y

D

ES

C R

IP

TI

O N

R ic hm on d Sl ee py

H ol lo w

R d_

H D

.d w g 7-

Ja n-

:4

PM

Pl ot te d on

N

NOTES: LEGEND

REFLECTORIZED DRUM OR CONE

WORK ZONE

DIRECTION OF TRAFFIC

SIGN

TEMPORARY BARRIER

NOTE: CONTRACTOR SHALL SECURE THE WORK SITE

WITH TEMPORARY FENCE (W/ "DANGER AREA CLOSED TO

VEHICLE, BICYCLE, AND PEDESTRIAN TRAFFIC" SIGN)

N

Sheets and Views
1 KEY PLAN LOCUS PROFILE & NOTES
2 GENERAL NOTES
3 BORING LOGS
4 GENERAL PLAN AND ELEVATION
5 DEMO & CONTROL OF WATER
6 BACKFILL & STREAMBED RESTORATION
7 THREE-SIDED FRAME DETAILS
8 SUBSTRUCTURE DETAILS
9 GUARDRAIL DETAILS 1 OF 2
10 GUARDRAIL DETAILS 2 OF 2
11 ROADWAY PLAN AND TYPICAL SECTION
12 EROSION AND SEDIMENT CONTROL DETAILS
13 MISC. DETAILS STREAMBED RESTORATION
14 TEMPORARY TRAFFIC CONTROL PLAN

File details come from the government source that posted it. Updated .