3-24-95_R-06-016_SIGNED_PLANS.pdf
PDF 4 MB Posted
- Attached to
- Sleepy Hollow Road Bridge Replacement Project
- Solicitation number
- FY27-RICHMOND
- Issued by
- Berkshire County, Massachusetts
About this file
This file consists of signed civil engineering plans for the Sleepy Hollow Road Bridge Replacement Project in Richmond, Massachusetts, prepared by a professional engineering firm located in Needham, Massachusetts. The project involves replacement of an existing undersized culvert that crosses Cone Brook, a designated Cold-Water Fishery, with a precast concrete frame structure and precast concrete wingwalls. The work is bounded by project stations 11+05 to 11+90 on Sleepy Hollow Road and must comply with the Order of Conditions issued by the Massachusetts Division of Fish & Wildlife NHESP and the Army Corps of Engineers General Permit. The plans include detailed specifications for culvert installation, streambed restoration to natural conditions, guardrail installation, temporary traffic control, erosion and sediment control measures, and roadway improvements. Two soil boring locations (B-1 and B-2) were completed on April 20, 2022, revealing primarily gravel, sand, and till soil compositions with groundwater present at shallow depths. The project maintains the existing gravel road surface without paving and incorporates rock steps and sediment control barriers to protect the stream environment.
The plans establish full-depth roadway specifications including a six-inch compacted dense graded crushed stone surface course and twelve-inch gravel borrow base, with typical sections showing fourteen-foot travel lanes on each side with two percent cross-slopes. Proposed improvements include slope restoration with compost blankets and seeding, guardrail installation with deep posts and trailing anchorage, and streambed restoration using natural streambed material. The project requires a wildlife specialist to implement turtle protection measures per Richmond's Conservation Order of Conditions. The plans were plotted on January 7, 2025, and signed on March 24, 2025, indicating final design approval. Temporary traffic control includes bridge closure signage, detour routes on surrounding roads including Swamp Road and Dublin Road, and temporary barriers with reflectorized drums or cones to secure the work zone and direct traffic flow during construction activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11 12
PI +72.61
PI +01.07
PI +17.14
PI +29.10
PI +68.69
B-2
B-1
BM#2 - TOP OF HUB,
E/GRAVEL RD,
EL 100.0
N2973020.7855
E154911.0322
X
N 1°
'1
4" E
.6
0'
N 88° 24' 46" W 278.42'
SLEEPY HOLLOW RD
APPROX ROW
APPROX ROW
FAIRFIELD
BROOK
SLEEPY HOLLOW
BROOK
PROJECT BEGIN
STA 11+05
N2973033.0573 E154923.0944
PROJECT END
STA 11+90
N2973035.4118 E154838.1266
SLEEPY HOLLOW RD BL
ROCK STEP/FOOTERS (TYP)
(SEE SHEET13 FOR DETAILS)
HIGHWAY GUARDRAIL (TYP)
(SEE SHEET 9 FOR DETAILS)
.0
0'
C O
N E
BR
O
O K
.0
0'
WF-D1
WF-D2
WF-A13
WF-A14
BVW-F5 BVW-F6 BVW-F7
BVW-F8
BVW-F9
BVW-F10
WF-C19
WF-C18
WF-C17
WF-C16
WF-A12
WF-A11
WF-A10
WF-A9
BVW-E4
BVW-E5
BVW-E6
BVW-E7
BVW-E8
BVW-E9 BVW-E10
96 97
97 98
MATCH INTO EXIST.
20+00±
+16.72
SLEEPY HOLLOW
BROOK BL
CONE BROOK BL
R-06-016 (CQB)
SLEEPY HOLLOW RD
D U
BL
IN
R D
SW
AM
P
RD
ST
AT
E R
D
LENOX RD
RICHMOND
LENOX
SUMMIT RD
E RD
RESERVOIR RD
O
SCEO
LA RD
D U
BL
IN
R D
C O
N E
BR
O
O K
ASSUMED
DATUM
BASE ELEV
85.00
10+75 11+00
0.
12+00 12+2510+75 11+00 12+00 12+25
1.17% -0.50% -1.26%
M
AT
C H
E
XI
ST
S
TA
1+
.0
EL
EV
.0
8±
G R
AD
E
BR
EA
K
ST
A
+3
9.
EL
EV
.4
G R
AD
E
BR
EA
K
ST
A
+6
1.
EL
EV
.3
M
AT
C H
E
XI
ST
S
TA
1+
.0
EL
EV
.0
0±
ASSUMED
DATUM
BASE ELEV
85.00
.0
19+65
.0
20+00
0.
.0
21+0019+65 20+00 21+00
K
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d_
H D
.d w g 7-
Ja n-
:3
PM
Pl ot te d on
N
N
INDEX
SHEET NO. DESCRIPTION
1 KEY PLAN LOCUS PROFILE & NOTES
2 GENERAL NOTES
3 BORING LOGS
4 GENERAL PLAN AND ELEVATION
5 DEMO & CONTROL OF WATER
6 BACKFILL & STREAMBED RESTORATION
7 THREE-SIDED FRAME DETAILS
8 SUBSTRUCTURE DETAILS
9 GUARDRAIL DETAILS 1 OF 2
10 GUARDRAIL DETAILS 2 OF 2
11 ROADWAY PLAN AND TYPICAL SECTION
12 EROSION AND SEDIMENT CONTROL DETAILS
13 MISC. DETAILS - STREAMBED RESTORATION
14 TEMPORARY TRAFFIC CONTROL PLAN
BardowA Text Box 3/24/2025
K
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- C ul ve rt
Pl an s.
dw g 7-
Ja n-
:4
PM
Pl ot te d on
BardowA
BORING LOG
COMPREHENSIVE ENVIROMENTAL INC
BORING CONTRACTOR:
General Borings Inc 201 Straitsville Rd Prospect, CT 06712
LOG PREPARED BY:
CONTR.____ CEI.__X__
GROUND WATER OBSERV.
TYPE
AT _1_ FT. AFTER _1_ HOUR SIZE ID
HAMMER WT.
AT ___ FT. AFTER ___ HOURS HAMMER FALL
LOCATION OF BORING:
DEPTH
BELOW
GROUND SURFACE TO ____ FT.,
W = WASHEDD = DRY
UP = UNDISTURBED, PISTON
PROPORTIONS USED:
0 to 4 Very Loose
4 to 10 Loose
10 to 30 Medium Dense
USED ____CASING:
C = CORED
TRACE = 0-10%,
Granular Soils (blows per ft.)
30 to 50 Dense Over 50 Very Dense
P = PIT
THEN ____ CASING
A = AUGER
UB = UNDISTURBED, BALL CHECK
LITTLE = 10-20%,
0 to 2 Very Soft
2 to 4 Soft
SOME = 20-40%,
V = VANE TEST
TO ____ FT. FOOTAGE IN EARTH
FOOTAGE IN ROCK
OER = OPEN END ROD NO. OF SAMPLES
AND 40-50%
Cohesive Soils (blows per ft.)
8 to 15 Stiff 15 to 30 Very Stiff
4 to 8 Medium Soft Over 30 Hard
Standard Penetration Test (SPT) = 140lb hammer falling 30"
HOLE NO. B-1 & B-1A TYPE
19'
SPT
5-7 SS 1 3 8 7
7-9 SS 2 3 2 2
9-11 SS 1
11-13 SS 27
13-15 SS 46
50+
15-17 SS 19 57 28 28
17-19 SS 105 32 100/3"
3 24" 8"
CASING
BLOWS
SURFACE PER FOOT
SAMPLE
DEPTH
FROM-TO
1-3
TYPE OF
SAMPLE
Blows Per 6" On Sampler
0-6
SS 21
6-12
12-18
18-24
One Hartford Square East Suite 227, New Britain, CT 06052 41 Main St, Bolton, MA 01740
21 Depot St, Merrimack, NH 03054
TOWN, STATE: Richmond, MA PROJECT NAME: HVA Culvert Replacement
CEI NO.: 386-1
HOLE NO:
Long:
OFFICE: MA
AUGER CASING SAMPLER CORE BAR.
SS
2 in
140 lb 30 in
SURFACE ELEVATION: 98.632 FT.
DATE START-FINISHED: 4/20/2022 - 4/20/2022
BORING FOREMAN: John Wyant INSPECTOR: Joseph Johanson
SOILS ENGR.: Sebastian Amenta
FIELD IDENTIFICATION OF SOIL & ROCK
INCL. COLOR, LOSS OF WASH WATER,
JOINTS IN ROCK, ETC.
SAMPLE
NO. PEN. REC
1 24" 18"
B-1 & B-1A
BORING TYPE: H.S.A
Lat.: 42.3882135
-73.3593058
SHEET 1 OF 1
3-5 SS 11 9 5 4 2 24" 0"
4 24" 16"
5 24" 3"
6 24" 18"
24" -
24" 9"
8 24" -
Dry, Dense, Light Grey to Light Brown Coarse GRAVEL - GP
Wet, Medium Dense, Brown to Light Grey GRAVEL and Fine to Coarse SAND - GM
Wet, Loose, Dark Brown to Grey GRAVEL some SILT some ORGANICS - GM
No Recovery
Wet, Very Dense, Light Grey to Brown Large GRAVEL some Fine to Coarse SAND - GM (Till)
Augered through 14 FT. depth. Moved Auger 3 FT to new location. Augured down to 15 FT.
Wet, Very Dense, GRAVEL and ROCK, Trace SAND - GC (Till)
Rock Fragments. End of Boring.
Wet, Very Loose, Light Brown GRAVEL
GM
BORING LOG
COMPREHENSIVE ENVIROMENTAL INC
BORING CONTRACTOR:
General Borings Inc 201 Straitsville Rd Prospect, CT 06712
LOG PREPARED BY:
CONTR.____ CEI.__X__
GROUND WATER OBSERV.
TYPE
AT _4_ FT. AFTER _0_ HOUR SIZE ID
HAMMER WT.
AT ___ FT. AFTER ___ HOURS HAMMER FALL
LOCATION OF BORING:
DEPTH
BELOW
GROUND SURFACE TO ____ FT.,
W = WASHEDD = DRY
UP = UNDISTURBED, PISTON
PROPORTIONS USED:
0 to 4 Very Loose
4 to 10 Loose
10 to 30 Medium Dense
USED ____CASING:
C = CORED
TRACE = 0-10%,
Granular Soils (blows per ft.)
30 to 50 Dense Over 50 Very Dense
P = PIT
THEN ____ CASING
A = AUGER
UB = UNDISTURBED, BALL CHECK
LITTLE = 10-20%,
0 to 2 Very Soft
2 to 4 Soft
SOME = 20-40%,
V = VANE TEST
AND 40-50%
TO ____ FT. FOOTAGE IN EARTH
FOOTAGE IN ROCK
OER = OPEN END ROD NO. OF SAMPLES
HOLE NO. B-2
Cohesive Soils (blows per ft.)
8 to 15 Stiff 15 to 30 Very Stiff
4 to 8 Medium Soft Over 30 Hard
Standard Penetration Test (SPT) = 140lb hammer falling 30"
TYPE
SPT
5-7 SS 3 4 8 11
CASING
BLOWS
SURFACE PER FOOT
SAMPLE
DEPTH
FROM-TO
1-3
TYPE OF
SAMPLE
Blows Per 6" On Sampler
0-6
SS 14
6-12
12-18
18-24
One Hartford Square East Suite 227, New Britain, CT 06052 41 Main St, Bolton, MA 01740
21 Depot St, Merrimack, NH 03054
TOWN, STATE: Richmond, MA PROJECT NAME: HVA Culvert Replacement
CEI NO.: 386-1
HOLE NO:
Long:
OFFICE: MA
AUGER CASING SAMPLER CORE BAR.
SS
2 in
140 lb 30 in
SURFACE ELEVATION: 98.225 FT.
DATE START-FINISHED: 4/20/2022 - 4/20/2022
BORING FOREMAN: John Wyant INSPECTOR: Joseph Johanson
SOILS ENGR.: Sebastian Amenta
FIELD IDENTIFICATION OF SOIL & ROCK
INCL. COLOR, LOSS OF WASH WATER,
JOINTS IN ROCK, ETC.
Dry, Dense, Light Brown to Grey SAND with GRAVEL - GP
SAMPLE
NO. PEN. REC
1 24" 18"
B-2
BORING TYPE: H.S.A
Lat.: 42.3881847
-73.3595073
SHEET 1 OF 1
3-5 SS 16 9 4 4 Damp, Medium Dense, Light Brown to Dark Grey GRAVEL trace SAND - SP
Damp, Medium Dense, Dark Grey and Brown SAND little GRAVEL - SM
7-9 SS 11 7 4 3 Wet, Medium Dense, Dark Brown SAND with GRAVEL trace SILT - SP
9-11
11-13
13-15
SS
SS
SS
No Recovery
Wet, Medium Dense, Dark Brown SAND with GRAVEL trace SILT - SM
Wet, Dense, Brown to Grey GRAVEL and SAND trace SILT - GM
15-17 SS 10 19 21 22 Wet, Dense, Brown to Grey GRAVEL and SAND some SILT - GM
17-19 SS 15 16 18 22 Wet, Dense TILL and SILT - SM
2 24" 12"
3 24" 13"
4 24" 8"
24"
24"
24"
0"
10"
5"
8 24" 2"
9 24" 13"
K
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- C ul ve rt
Pl an s.
dw g 7-
Ja n-
:4
PM
Pl ot te d on
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- C ul ve rt
Pl an s.
dw g 7-
Ja n-
:4
PM
Pl ot te d on
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- D em o
C on tro l o f W at er .d w g
7- Ja n-
:4
PM
Pl ot te d on
N N
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- D em o
C on tro l o f W at er .d w g
7- Ja n-
:4
PM
Pl ot te d on
N
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- F ra m e
D et ai ls
.d w g 7-
Ja n-
:4
PM
Pl ot te d on
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- S ub
D et ai ls
.d w g 7-
Ja n-
:4
PM
Pl ot te d on
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- G ua rd ra il D et ai ls .d w g
7- Ja n-
:4
PM
Pl ot te d on
BardowA
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- G ua rd ra il D et ai ls .d w g
7- Ja n-
:4
PM
Pl ot te d on
BardowA
14.0' TRAVEL LANE14.0' TRAVEL LANE
2.0% 2.0%
FULL DEPTH ROADWAY
3.00'
LEVEL
0.75'
LEVEL
VARIES .73' TO 5.9'±
PROP 1'' COMPOST
BLANKET & SEED (2:1
MAX) (TYP)
GUARDRAIL, DEEP
POST (SINGLE
FACED)
VARIES 1.0' TO 3.7'±
EXISTING
GROUND
ORDINARY
BORROW (TYP)
GUARDRAIL, TL-2
(SINGLE FACED)
11 12
PI +72.61
PI +01.07
PI +17.14
PI +29.10
PI +68.69
PI
.1
19+56.94
SLEEPY HOLLOW RD
FAIRFIELD
BROOK
PROJECT END
STA 11+05
N2973033.0573 E154923.0944
APPROX ROW
APPROX ROW
RESTORE STREAMBED
WITH NATURAL
STREAMBED MATERIAL
(TYP)
SLEEPY HOLLOW
BROOK
C O
N E
BR
O
O K
BM#2 - TOP OF HUB,
E/GRAVEL RD,
EL 100.0
N2973020.7855
E154911.0322
X
PROP TRAILING
ANCHORAGE (TYP)
R=155'
N 88° 24' 46" W 278.42'28 .0
0'
PROP GUARDRAIL,
DEEP POST (TYP)
2.0% 2.0%
MATCH
EXIST
MATCH
EXIST
PROP FULL DEPTH
ROADWAY
R=155'
PROP COMPOST BLANKET
& SEED (TYP)
PROP SEDIMENT CONTROL
BARRIER (TYP)
PROP SLOPE LIMIT (TYP)
PROP GRADE BREAK (TYP)
PAVEMENT MILLING
MULCH (TYP)
.0
0'
2.
0%
2.
0%
MA
TC
H
EX
IST
MA
TC
H
EX
IST
PROP FULL DEPTH ROADWAY
PROP ROCK STEPS (TYP)
+72.98
OFFSET: 14.00
+26.98
OFFSET: 14.00
SLEEPY HOLLOW RD BL
PROJECT END
STA 11+90
N2973035.4118 E154838.1271
+26.98
OFFSET: 14.00
+72.98
OFFSET: 14.00
WF-D1
WF-D2
WF-D4
WF-D3
WF-A13
WF-A14
WF-A15
BVW-F5BVW-F4 BVW-F6 BVW-F7
BVW-F8
BVW-F9
BVW-F10
WF-C21
WF-C20
WF-C19
WF-C18
WF-C17
WF-C16
WF-C15
WF-C14
WF-A12
WF-A11
WF-A10
WF-A9
BVW-E4
BVW-E5
BVW-E6
BVW-E7
BVW-E8
BVW-E9 BVW-E10
96 97
97 98
MATCH INTO EXIST.
19+84.91±
MATCH INTO EXIST.
20+90.37±
.6
.6
+04.27
+93.56
+95.75
+06.45
K
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d_
H D
.d w g 7-
Ja n-
:4
PM
Pl ot te d on
HOR. SCALE IN FEET
VER. SCALE IN FEET
4 4 8
4 4 8
PAVEMENT NOTES:
PROPOSED FULL DEPTH PAVEMENT
SURFACE COURSE: 6'' COMPACTED DENSE GRADED CRUSHED STONE (M2.01.7)
BASE: 12" GRAVEL BORROW, TYPE B
(EXISTING BASE MATERIAL MAY REMAIN IF SUITABLE AS DETERMINED BY THE
ENGINEER)
N
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d_
H D
.d w g 7-
Ja n-
:4
PM
Pl ot te d on
ENSURE FIRM CONTACT WITH
GROUND TO PREVENT FLOW
UNDERNEATH TUBES
FOR SLOPES 3:1 OR AS
NECESSARY, STAKE OR
OTHERWISE SUPPORT TUBES
(I.E., TREES, CINDER BLOCKS)
AREA OF SOIL
DISTURBANCE
BIODEGRADABLE
FABRIC
PROTECTED ZONE
FLOW
12" dia.* installed
CAPTURE SEDIMENT AND
PREVENT FLOW OFF SITE
*9 INCH MAY BE USED FOR FLATTER SURFACES
WITH APPROVAL FROM ENGINEER
REDUCE HIGH WATER
FLOW ONTO WORK ZONE
PLACE TUBE AS CLOSE TO LIMIT OF SOIL DISTURBANCE
AS POSSIBLE, ALONG CONTOURS, AND PERPENDICULAR
TO FLOW.
ADJUST LOCATION AS REQUIRED FOR OPTIMUM
EFFECTIVENESS. DO NOT INSTALL IN WATERWAYS.
CURVE ENDS
UPHILL
EXISTING
TREE
MIN. 3 FT OVERLAP
FOR CONTINUOUS
BARRIER.
HARDWOOD STAKES PLACED
OUTSIDE OF TUBES OR PER
MANUFACTURERS' INSTRUCTION
PROTECTED ZONE
FLOW
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d
- S tre am be d R es or at io n D et ai ls .d w g
7- Ja n-
:4
PM
Pl ot te d on
BRIDGE CLOSED
BRIDGE
CLOSED
BRIDGE
CLOSED
R11-2
ON TYPE III
BARRICADE
R11-2
ON TYPE III
BARRICADE
PROP TEMP BARRIER
PROP TEMP BARRIER
PROP
REFLECTORIZED
DRUM OR CONE
(TYP)
SLEEPY HOLLOW
ROAD
C O
N E
B R
O O
K
BRIDGE CLOSED
1/2 MILE AHEAD
LOCAL TRAFFIC ONLY
BRIDGE CLOSED
1500 FEET AHEAD
LOCAL TRAFFIC ONLY
DETOUR
ROAD
CLOSED
AHEAD
DETOUR
DETOUR DETOURDETOURDETOUR
DETOUR
DETOUR
DETOUR DETOUR
END
DETOUR
END
DETOUR
DETOUR
AHEAD
W20-2 36''X36''
M4-9AL
30''X24''
M4-9AL
30''X24''
M4-9AR
30''X24''
M4-9AR
30''X24'' M4-9R
30''X24''
M4-9R 30''X24''
M4-9L 30''X24'' M4-9L
30''X24''
M4-8a 24''X18''
M4-8a 24''X18''
W20-3 36''X36''
R11-3b M4-10L 60''X30''
48''X18'' (ON TYPE III
BARRICADE)
R11-3b M4-10R 60''X30''
48''X18'' (ON TYPE
III BARRICADE)
SW
AM
P
RD
M
AR
C H
H
AR
E R
D
SLEEPY HOLLOW RD
D U
BL
IN
R D
D U
BL
IN
R D
SUMMIT RD
SEE BRIDGE
CLOSURE
DETAIL
ST
AT
E R
D
CANAAN RD ROAD
CLOSED
AHEAD
W20-3 36''X36''
DETOUR
M4-9R
30''X24''DETOUR
M4-9AR
30''X24''
CO
NE
B
RO
O K
ROSSITER RD
W R
D
K
EN
D
R
IC
K S
TR
EE
T N
EE
D
H A
M , M
A
1-
5-
1-
5-
(F A
X)
R
EG
IS
TE
R
ED
P R
O
FE
SS
IO
N A
L
EN
G
IN
EE
R
D A
TE
D
AT
E D
R W
. B Y
C
AL
C . B
Y
AP
PR
V.
B Y
D
ES
C R
IP
TI
O N
R ic hm on d Sl ee py
H ol lo w
R d_
H D
.d w g 7-
Ja n-
:4
PM
Pl ot te d on
N
NOTES: LEGEND
REFLECTORIZED DRUM OR CONE
WORK ZONE
DIRECTION OF TRAFFIC
SIGN
TEMPORARY BARRIER
NOTE: CONTRACTOR SHALL SECURE THE WORK SITE
WITH TEMPORARY FENCE (W/ "DANGER AREA CLOSED TO
VEHICLE, BICYCLE, AND PEDESTRIAN TRAFFIC" SIGN)
N
| Sheets and Views |
| 1 KEY PLAN LOCUS PROFILE & NOTES |
| 2 GENERAL NOTES |
| 3 BORING LOGS |
| 4 GENERAL PLAN AND ELEVATION |
| 5 DEMO & CONTROL OF WATER |
| 6 BACKFILL & STREAMBED RESTORATION |
| 7 THREE-SIDED FRAME DETAILS |
| 8 SUBSTRUCTURE DETAILS |
| 9 GUARDRAIL DETAILS 1 OF 2 |
| 10 GUARDRAIL DETAILS 2 OF 2 |
| 11 ROADWAY PLAN AND TYPICAL SECTION |
| 12 EROSION AND SEDIMENT CONTROL DETAILS |
| 13 MISC. DETAILS STREAMBED RESTORATION |
| 14 TEMPORARY TRAFFIC CONTROL PLAN |
File details come from the government source that posted it. Updated .