20261006_R06016_Special_Provisions_Final.pdf

PDF 8 MB Posted

Attached to
Sleepy Hollow Road Bridge Replacement Project
Solicitation number
FY27-RICHMOND
Issued by
Berkshire County, Massachusetts

About this file

This document is a Technical Specifications file for the Town of Richmond Bridge No. R-06-016 project, developed in accordance with Massachusetts Department of Transportation (MassDOT) Highway Division standards. The project involves the complete replacement of an undersized corrugated HDPE culvert with a precast concrete 3-sided frame bridge on precast spread footings and precast concrete wingwalls over Cone Brook on Sleepy Hollow Road. Work includes installation of a temporary bypass pipe or reuse of the existing culvert, demolition of the existing culvert and wingwalls, installation of the proposed bridge and wingwalls, bridge excavation, de-watering, installation of steel TL-2 W-beam guard rail, streambed restoration, and full depth gravel section with final grading. The project will utilize roadway closure with detour, supplemented by short-term lane closures during non-peak traffic times. The contractor must submit a detailed construction schedule for approval prior to commencing work. The plans consist of 14 construction drawing sheets approved by MassDOT on March 25, 2025.

Contractor prequalification by MassDOT Highway Division is required for Bridge-Culverts (small bridge/culvert) classification. The project must comply with all applicable Massachusetts Department of Transportation Highway Division Standard Specifications, supplemental specifications, construction standard details, traffic control devices, and relevant industry standards. Construction work must adhere to the Order of Conditions from the Massachusetts Division of Fish & Wildlife NHESP and Army Corps of Engineers General Permit due to the site's location over Cone Brook, a designated Cold-Water Fishery. A wildlife specialist is required as part of a turtle protection plan in compliance with Richmond's Conservation Order of Conditions. Upon completion, the gravel road will remain unpaved, and the stream channel will be restored to its natural state.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R-06-016 Technical Specifications

10/06/2026-1

TECHNICAL SPECIFICATIONS

TOWN OF RICHMOND

BRIDGE NO. R-06-016, SLEEPY HOLLOW ROAD OVER CONE BROOK

SPECIAL PROVISIONS TO THE

MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION

STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES

DIVISION II

The work on this project shall conform to the 2026 Massachusetts Department of Transportation

Highway Division Standard Specifications for Highways and Bridges, the September 30, 2025

Supplemental Specifications, the June 2025 Massachusetts Department of Transportation

Highway Division Construction Standard Details; the 1990 Standard Drawings for Signs and

Supports; the 1996 Construction and Traffic Standard Details (as relates to the Pavement Markings details only); the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts

Amendments and the Standard Municipal Traffic Code; the 1968 Standard Drawings for Traffic

Signals and Highway Lighting; the latest edition of American Standard for Nursery Stock; the

Plans and these Special Provisions. The 2025 Standard Specifications; the latest editions of the

Supplemental Specifications and the Interim Supplemental Specifications shall be referred to collectively as the Standard Specifications.

Construction Schedule: The culvert replacement is to be carried out using a roadway closure with a detour. A detailed schedule outlining the tasks and timeline to perform the culvert replacement during the closure shall be prepared by the Contractor and submitted for approval. Short term lane closures during non-peak traffic times shall be utilized to perform work prior to and following the closure.

General: The work includes the complete replacement of the undrsized existing corrugated HDPE culvert pipes with a proposed precast concrete 3-sided frame bridge, on precast spread footings and precast concrete wingwalls. The work shall include installation of a temporary bypass pipe or reuse of existing, demolition of the existing culvert and wingwalls to the limits shown on the plans, installation of the proposed bridge and wingwalls, bridge excavation, necessary de-watering, installation of steel TL-2 W-beam guard rail, streambed restoration, and full depth gravel section and final grading over the bridge and the approaches. The Plans consist of 14 construction drawing sheets that were reviewed and approved by MassDOT on March 25, 2025. Traffic management required to perform the proposed work shall be as shown on the Plans. Payment for materials or work shown on the Plans or as being part of the bridge replacement which may be incidental to its construction and are not specifically included for payment under the Contract shall be considered incidental to the work performed. Where used within the contract documents, the terms

“Department”, “Municipality”, and “Town” shall be taken to mean the Town of Richmond. The term “Engineer” shall be taken to mean the authorized representative or Project Manager for the

Town of Richmond.

10/06/2026-2

For the work specified under this Contract, the Contractor or Subcontractor(s) shall be prequalified by the Massachusetts Department of Transportation Highway Division (MassDOT) for the following classes of work:

Bridge-Culverts (small bridge/culvert<20 ft)

PLANS AND DETAIL DRAWINGS

(Supplementing Subsection 5.02)

Plans of the existing culvert have not been located. The Contractor shall perform his/her own investigation of the existing culvert to determine its condition and details necessary for construction and base his/her bid thereon.

PROTECTION OF UTILITIES AND PROPERTY

(Supplementing Subsection 7.13)

The bridge plans may indicate the location of existing known utilities in the vicinity of the work.

Bidders are cautioned to verify this information, as its accuracy and completeness are not guaranteed in any manner.

The Contractor is responsible for the protection of vehicular and pedestrian areas on and around the bridge being worked on. The Contractor at no additional compensation (unless otherwise, provided in this Contract) shall take all necessary precautions, including the use of shielding, to protect vehicles and pedestrians from debris.

NOTICE TO OWNERS OF UTILITIES

Written notice shall be given by the Contractor to all public service corporations or officials owning or having charge of publicly or privately owned utilities attached to, or in the vicinity of the bridge, of his intention to commence operations and the Contractor shall at that time file a copy of such notice with the Engineer.

Before the Contractor begins any work or operations that may cause damage to any subsurface structures, he shall carefully locate all such structures and conduct his operations so as to avoid any damage to them.

A list of public and private utilities can be found on the MassDOT website at:

https://www.mass.gov/info-details/utility-contacts-by-district-and-municipality

Select District 1 on top of the webpage, select the City/Town, and then locate the utility.

The utility contact list is for guidance only and is not guaranteed to be complete or up to date.

https://www.mass.gov/info-details/utility-contacts-by-district-and-municipality

10/06/2026-3

The Contractor shall be responsible for informing the following officials in each area that he is assigned to work in:

Town Coordinator, Town of Richmond

Police Department, Town of Richmond

Fire Department, Town of Richmond

PROTECTION OF UNDERGROUND FACILITIES

The Contractor's attention is directed to the necessity of making his own investigation in order to assure that no damage to existing structures, drainage lines, traffic signal conduits, et cetera, will occur.

The Contractor shall notify Massachusetts DIG SAFE and procure a Dig Safe Number for each location prior to disturbing existing ground in any way. The telephone number of the Dig Safe

Call Center is 811 or 1-888-344-7233

ENVIRONMENTAL REQUIREMENTS

ORDER OF CONDITIONS

This project is subject to Section 401 of the federal Clean Water Act, 33 USC 1341, and

Massachusetts Clean Water Act, M.G.L. c 21, § 26-53, and has been issued Orders of Conditions by the Richmond Conservation Commission. The combined Order of Conditions are considered to be part of this contract and a copy of the Orders of Conditions, and all plans/attachments shall be on-site while activities regulated by the Orders of Conditions are being performed. The

National Heritage & Endangered Species Program of the Massachusetts Division of Fisheries &

Wildlife requires a Turtle Monitoring Plan. See Item 755.77 and Appendix C for its implantation during construction activities.

The Contractor’s attention is directed to the fact that special conditions and other requirements are associated with the Orders of Conditions. It is the Contractor’s responsibility to be aware of and comply with these conditions and requirements and plan his/her work and schedule accordingly. The Contractor is hereby notified that he/she will be responsible and held accountable for performing any/all work necessary to satisfy and comply with the entire Orders of Conditions.

The Notice of Intent plotted October 21, 2024, and the Order of Conditions dated January 22, 2025. The Contractor is advised that no additional compensation will be allowed for work required to establish, achieve, and maintain compliance with the Order of Conditions, as payment for the work shall be included in the various bid items. This work may include, but not limited to, the following: the hiring and paying for services of a Professional Biologist, Botanist, Wetland

Scientist, Engineer, Landscape Architect, etc.; preparation and submission of as-built plans;

wetland flagging; wetland replication monitoring reports, etc. Compliance monitoring per the requirements of the Order Conditions will be performed by a Town Designee.

10/06/2026-4

UNITED STATES ARMY CORPS OF ENGINEERS GENERAL PERMIT

A Self Verification Notification Form (SVNF) for the General Permits for Massachusetts has been prepared indicating the proposed work shall meet the terms and conditions of the applicable

General Permits and is contained in Appendix B. The Contractor is advised that no additional compensation will be allowed for work required to establish, achieve, and maintain compliance with the General Permits for Massachusetts, as payment for the work shall be included in the various bid items.

If Contractor erection, demolition, storage, or other procedures not originally allowed by existing environmental permits require work to occur in or otherwise impact water or wetland resource areas, the Contractor is advised that no associated work can occur until all required environmental permits have been either amended or obtained allowing such work. The Contractor must notify the

Engineer in writing at least 60 days prior to commencement of the proposed activity. All environmental submittals, including any contact with Local, State, or Federal environmental agencies, must be coordinated through the Engineer. The Contractor is expected to fully cooperate with requests for information and provide same in a timely manner.

The Contractor is further advised that the Engineer will not entertain a delay claim due to the time required to modify or obtain the environmental permits.

If field conditions and/or Contractor-proposed erection, demolition, storage, or other procedures not originally allowed by existing environmental permits require work to occur in or otherwise impact water or wetland resource areas, the Contractor is advised that no associated work can occur until all required environmental permits have been either amended or obtained allowing such work. The Contractor must notify the Town of Richmond and Resident Engineer in writing at least

60 days prior to desired commencement of the proposed activity. All environmental submittals, including any contact with Local, State, or Federal environmental agencies, must be coordinated with the Town of Richmond and the Resident Engineer. The Contractor is expected to fully cooperate with requests for information and provide the same in a timely manner. The Contractor is further advised that the Town of Richmond will not entertain a delay claim due to the time required to modify or obtain the environmental permits.

ARCHITECTURAL ACCESS BOARD TOLERANCES

The Contractor shall be responsible for constructing all project elements in strict compliance with the current AAB/ADA rules, regulations and standards.

All construction elements in this project associated with sidewalks, walkways, wheelchair ramps and curb cuts are controlled by 521CMR - Rules and Regulations of the Architectural Access

Board (AAB).

10/06/2026-5

The AAB Rules and Regulations specify maximum slopes and minimum dimensions required for construction acceptance. There is no tolerance allowed for slopes greater than the maximum slope nor for dimensions less than the minimum dimensions.

Contractors shall establish grade elevations at all wheel chair ramp locations, and shall set transition lengths according to the appropriate table in the Construction Standards (or to the details shown on the plans).

All wheelchair ramp joints and transition sections which define grade changes shall be formed, staked and checked prior to placing cement concrete. All grade changes are to be made at joints.

PROVISIONS FOR TRAVEL AND PROSECUTION OF WORK

The Contractor shall notify the Town of Richmond in writing at least two (2) weeks in advance of any proposed commencement of the work. Before starting any work under this Contract, the

Contractor shall submit a Schedule of Operations. Work on roadways shall proceed only on such sections and widths thereof as will be approved by the Town of Richmond.

10/06/2026-6

DESIGNER & TOWN CONTACTS

DESIGNER TOWN ADMINISTRATOR

Keith T. Nelson. Daniello Fillio

Gill Engineering Associates, Inc. Town of Richmond

1234 Chestnut Street, Suite 207 1751 State Road

Newton, MA 02464 Richmond, MA 01254

o) 781-657-9044 c) 916-346-6149 413-553-7793

Email: knelson@gill-eng.com Email: townadmin@richmondma.org

TOWN HIGHWAY SUPERINTENDENT

Peter Beckwith

413-553-7794

ITEM 115.11 DEMOLITION OF SLEEPY HOLLOW ROAD

CULVERT

LUMP SUM

The work to be done under this Item shall conform to the relevant provisions of Section 112, 120, and 140 of the Standard Specifications, amended and or supplemented as follows:

The work to be done under this Item shall consist of the demolition and satisfactory removal of the two (2) existing 36” diameter corrugated HDPE culvert pipes to the limits shown on the plans.

Within 10 working days of the notice to proceed, the Contractor shall submit a plan indicating his proposed demolition procedures and methods to be used including equipment, tools, devices, crane or excavator capacity and location, schedule of operations, methods of utility protection, etc., to the Engineer for approval. The requirements for equipment and all procedures utilized shall be in conformance with the intent of Subsection 960.61 Erection of the Specifications.

The demolition procedures and any necessary calculations and drawings shall be stamped by a

Professional Engineer registered in Massachusetts certifying that all existing structural members are suitably supported throughout the demolition process. In determining the stresses to which the structure will be subjected, all loading combinations including traffic and the Contractor’s equipment shall be considered. The method of determining stresses shall conform to the latest

AASHTO Standard Specifications for Highway Bridges. Work under this Item may not commence until the Engineer has given written approval.

No debris, tools or incidental equipment of any kind will be permitted to fall into areas within the vicinity of the waterway under. Any material that accidentally falls into such areas shall be removed immediately.

Demolition of the culvert shall not commence until such time that the temporary control of water system and shielding system is in place.

Prior to the start of work, the Contractor shall locate all utilities and shall submit to the Engineer and the utility companies his proposed method of protecting them during the demolition operations

10/06/2026-7 as part of the Demolition Procedure. Procedure approval shall not serve to relieve the Contractor of his responsibility to protect all utilities from damage at all times. Any damage resulting from

Contractor Operations shall be repaired at his expense.

All materials removed under Item 115.11 shall become the property of the Contractor and shall be removed from the job site and disposed of properly.

METHOD OF MEASUREMENT AND BASIS OF PAYMENT

Unless otherwise covered under other contract items, full payment for this work shall be included under the lump sum price for Item 115.11, Demolition of Culvert, and shall include all labor, equipment and materials necessary to complete the work. Except as specified, all material and debris shall become the property of the Contractor and shall be recycled, reused, or disposed of properly off site.

ITEM 140. BRIDGE EXCAVATION CUBIC YARD

Work under this item shall conform to the relevant provisions of Sections 120, 140 and 150 of the

Specifications and the following:

Excavation shall be as required to install the proposed bridge and wingwalls to the line and grade shown on the Plans. Any materials encountered as defined in the referenced sections of the

Specifications under the classification of Earth Excavation or Bridge Excavation shall be removed.

Backfill shall be placed and compacted in accordance with the relevant provisions of Section 150 of the Specifications. Compaction shall be achieved using mechanical tampers or other approved compacting equipment.

A Temporary Control of Water system shall be installed to the limits shown on the drawings which will permit construction to be performed in the dry.

Measurement shall be made to the nearest cubic yard of Bridge Excavation complete and accepted by the Engineer. Payment will be made at the contract unit price per cubic yard and shall be considered full compensation for all labor, equipment, stockpiling, hauling, disposal, and incidentals necessary to complete the work.

ITEM 151. GRAVEL BORROW CUBIC YARD

The work under this item shall conform to the relevant provisions of Section 150 of the

Specifications and in close conformity with the lines and grades shown on the plans.

Gravel borrow conforming to material specification M1.03.0 Type b shall be used for the roadway subbase.

10/06/2026-8

ITEM 151.2 GRAVEL BORROW FOR BACKFILLING CUBIC YARD

STRUCTURES AND PIPES

The backfilling the precast concrete bridge and the precast wingwalls shall be in accordance with

Section 150 of the Specifications, the requirements of the manufacturer of the precast concrete bridge and wingwalls, and the following. Where differences exist between requirements of the manufacturer of the precast concrete bridge and wingwalls and the Specifications, the more stringent requirements shall apply.

1. The gravel borrow shall meet the requirements of M1.03.0 Type C. Excavated material may be used for backfilling if the material meets the requirements of M1.03.0 Type C. Any material that is stockpiled shall be piled within the project limits and right-of-way. Material shall not be stockpiled in wetland areas. Stockpiled material shall have at least one layer of tarp material below the pile and shall be covered with tarps. The pile shall be surrounded by compost filter tubes.

2. The fill shall be placed and compacted in layers not exceeding 8 inches in depth in accordance with the provisions of Subsection 150.62 of the Specifications and shall be compacted to at least

95% of the maximum dry density in accordance with ASTM D1557. The moisture content shall be within 2% of the optimum moisture content for compaction;

3. Backfill shall be placed as symmetrically as possible around the structure with differential depths of backfill on each side of the structure not exceeding 2 feet with respect to each other;

4. Compaction shall be achieved using mechanical tampers or approved compacting equipment for all fill within 4 feet of the structure;

5. Construction equipment will not be permitted atop the uncompleted structure;

6. Construction equipment whose weight exceeds the design capacity shall not be permitted atop the completed structure under any circumstances;

7. The use of vibratory rollers for compaction purposes will not be permitted.

Backfilling operations shall not begin until the following checks have been made:

1. The bridge to wingwall joints are sealed and the bridge frame to frame connections are complete as shown on the shop Drawings;

2. All frame joint connections and seals are properly placed in accordance with manufacturer’s specifications shown on the shop drawings.

A Project Manager from the bridge and wingwall manufacturer shall be on site during backfilling operations to ensure that the manufacturer’s requirements are met.

ITEM 156.1 CRUSHED STONE FOR BRIDGE FOUNDATIONS CUBIC YARD

The work under this item shall conform to the relevant provisions of Section 150 of the

Specifications in close conformity with the lines and grades shown on the plans and the following:

If necessary, crushed stone for bridge foundations shall be placed in accordance with the requirements specified under Item 995.01.

10/06/2026-9

MEASUREMENT AND PAYMENT

Crushed stone for bridge foundations will be measured for payment per cubic yard, complete in place and accepted by the Engineer.

Crushed stone for bridge foundations will be paid for at the Contract unit price per cubic yard, which price shall include all labor, tools, material, equipment and incidental costs required to complete the work.

ITEM 402.01 DENSE GRADED CRUSHED STONE FOR SURFACE CUBIC YARD

The work under this item shall conform to the relevant provisions of Section 402 of the

Specifications and in close conformity with the lines and grades shown on the plans.

Dense Graded Crushed Stone for Surface shall conform to material specification M2.01.7 and shall be used for the final roadway surface.

ITEM 657. TEMPORARY FENCE FOOT

The work under this item shall conform to the relevant provisions of Section 644 of the Standard

The work under this Item consists of furnishing, installing, removing and resetting, and final removal of 6-foot high temporary fence to separate construction activities from public access.

The temporary fence shall be installed at locations as shown on the plans or required by the

Engineer. The Contractor shall install and maintain temporary construction fences around the construction site, stockpile areas, and any and all exposed excavations located outside the defined roadway area, accessible to the public until such time it is no longer necessary as determined by the Engineer. Protect all areas of the site from intrusion and trespass.

Unless otherwise indicated, the type of temporary chain link fencing shall be Contractor's option.

Following types are acceptable:

1. New materials or previously used salvaged chain link fencing in good condition.

2. Posts: Galvanized steel pipe of diameter to provide rigidity. Post shall be suitable for setting in concrete footings, driving into ground, anchoring with steel base plates, or inserting in precast concrete blocks.

3. Fabric: Woven galvanized steel wire mesh. Provide in continuous lengths to be wire tied to fence posts or prefabricated into modular pipe-framed fence panels.

10/06/2026-10

Gates:

Provide personnel and vehicle gates of the quantity and size required for functional access to site.

1. Fabricate of same material as used for fencing.

2. Vehicle gates:

a. Minimum width: 10 feet to allow access for emergency vehicles.

b. Capable of manual operation by one person.

Fence fabric shall be fastened to posts by means of No. 6 gauge zinc coated wire clips. No post tops are required.

Gates shall be fabricated using welded construction or heavy pressed steel or malleable corner fitting securely riveted. Gates shall be properly braced and diagonally trussed to eliminate any possible sagging. Hinges shall be of sufficient strength and design to permit easy and trouble free operation. All single swing gates shall be equipped with two H.O. hinges and one yoke latch per gate. All double swing gates shall be equipped with a positive type latching device with padlock fitting.

Installation of temporary fencing shall not deter or hinder access to existing or proposed fire hydrants. Maintain 3 feet diameter clear space around fire hydrants. Where fire hydrant is locked by fencing, provide access gate.

Item 657. will be measured and paid for at the Contract unit price per Foot, which price shall include all labor, materials, equipment, and incidental costs required to complete the work.

No separate payment will be made for all posts including end, corner, and intermediate brace posts, all gates and gate posts, removing and resetting of temporary fence or providing privacy screening, the replacement and/or restoration of fence damaged due to construction accidents, vandalism and/or any other manner, and final removal, but all costs in connection therewith shall be included in the Contract unit price bid.

The fence shall not be removed without prior approval of the Engineer.

ITEM 698.3 GEOTEXTILE FABRIC FOR SEPARATION SQUARE YARD

The work under these items shall conform to the requirements of Section M9.50.0 of the Standard

The work under this item includes the furnishing and installation of geotextile fabric under crushed stone and riprap.

At locations of fabric installation, the streambed shall first be graded. All rocks, vegetation, and other obstructions shall be removed before placement of fabric. The fabric shall be installed and fastened in place in conformance with the manufacturer’s recommendations for each type of condition listed above.

10/06/2026-11

Geotextile fabric for separation will be measured for payment per square yard, complete in place;

any overlaps shall be measured as a single layer of cloth.

Geotextile fabric for separation will be paid for at the Contract unit price per square yard, which price shall include all labor, tools, material, equipment and incidental costs required to complete the work.

ITEM 751.7 COMPOST BLANKET SQUARE YARD

The work under this Item shall conform to the relevant provisions of Section 751 of the Standard

Specifications and the following.

Work shall consist of furnishing and pneumatically applying compost as specified below. Compost shall be applied as a thin mulch blanket over prepared loam or prepared soil and shall be used in conjunction with seeding or planting unless specified otherwise. The intent of compost topdressing is to provide temporary soil stabilization and organic matter for plant growth.

For areas where compost is proposed with seeding, seed shall be broadcast and seeding shall occur in conjunction with compost topdressing, as specified under the relevant seeding item.

SUBMITTALS

Contractor shall submit to the Engineer samples and certified test results 60 days prior to application of compost. Test will be for compost, not a soil test, as specified below. Vender certification that material delivered meets the test results shall be submitted if requested.

No materials shall be delivered until the required submittals have been approved by the Engineer.

Delivered materials shall match the approved samples. Approval of test results does not constitute final acceptance. The Engineer will reject any material that does not meet the Specifications.

MATERIALS

Compost may be a blended product of compost and fine wood chips.

Compost testing shall be by a laboratory approved by the US Compost Council using the Testing

Method for the Examination of Compost and Composting (TMECC) protocols.

- Organic matter content shall be minimum 30 percent (dry weight basis).

- Moisture content shall be 30-60 percent (wet weight basis).

- Bulk Density <1000 lb/cy

- pH shall be 5.5-7.5

10/06/2026-12

- Conductivity shall be a maximum of 4 mmhos.

- Where soil is intended for vegetation (plants or grass), compost shall be tested for stability by CO2 method and shall produce a maximum of 8mg CO2-C per gram of organic material per day.

Particle size shall not exceed ¾ inch.

No kiln-dried wood, construction debris or ground palette is allowed.

The Engineer shall approve the Contractor's equipment for application.

CONSTRUCTION METHODS

Application of compost material shall not begin until the Engineer has approved the site and soil conditions. The Contractor shall notify the Engineer when areas are ready for inspection and application of compost.

Prior to application of compost, all areas to be topdressed shall have been graded to an even surface, and all debris and stones 2 inches or larger shall be removed. Surface preparation shall be compensated under applicable item for placement of loam, sand, ordinary borrow, topsoil rehandled and spread, or other specified substrate.

Compost topdressing shall be pneumatically applied (blown on) to a depth of one half to one inch unless specified otherwise on the plans.

For areas where compost is proposed with seeding, seed shall be broadcast and shall occur in conjunction with compost topdressing, as specified under the relevant seeding item.

Item 751.7 will be measured and paid for at the Contract unit price per Square Yard which price shall include all labor, materials, equipment, and all incidental costs required to complete the work of pneumatically applying compost.

Surface preparation of substrate receiving compost topdressing shall be compensated under applicable item for placement of loam, sand, ordinary borrow, topsoil rehandled and spread, or other specified substrate.

Seeding will be compensated for under the appropriate seeding item.

ITEM 767.121 SEDIMENT CONTROL BARRIER FOOT

The work under this item shall conform to the relevant provisions of Sections 751 and 767 of the

Standard Specifications and Section 670 of the Standard Supplemental Specifications and shall

10/06/2026-13 include the furnishing and placement of a sediment control barrier. Sediment Control Barrier shall be installed prior to disturbing upslope soil.

The purpose of the sediment control barrier is to slow runoff velocity and filter suspended sediments from storm water flow. Sediment barrier may be used to contain stockpile sediments, to break slope length, and to slow or prevent upgradient water or water off road surfaces from flowing into a work zone. Contractor shall be responsible for ensuring that barriers fulfill the intent of adequately controlling siltation and runoff.

Twelve-inch diameter (after installation) compost filter tubes with biodegradable natural fabric

(i.e., cotton, jute, burlap) are intended to be the primary sedimentation control barrier.

For small areas of disturbance with minimal slope and slope length, the Engineer may approve the following sediment control methods;

• Straw tubes/wattles which shall be trenched

• Straw bales which shall be trenched

Additional barriers (adding depth or height) shall be used at specific locations of concentrated flow such as at gully points, steep slopes, or identified failure points in the sediment capture line.

When required by permits, additional sediment barrier shall be stored on-site for emergency use and replacement for the duration of the contract.

Where shown on the plans or when required by permits, silt fence shall be used in addition to compost filter tubes or straw bales and shall be incidental to the item.

MATERIALS AND CONSTRUCTION

Prior to initial placement of barriers, the Contractor and the Engineer shall review locations specified on the plans to ensure that the placement will provide maximum effectiveness. Barriers shall be staked, trenched and/or wedged as specified herein and shall be securely in contact with existing soil such that there is no flow beneath the barrier.

Compost Filter Tube

Compost material inside the filter tube shall meet M1.06.0, except for the following: no manure or bio-solids shall be used; no kiln-dried wood or construction debris shall be allowed; material shall pass through a 2-inch sieve; and the C:N ratio shall be disregarded.

Outer tube fabric shall be a knitted mesh with 1/8 - 3/8” openings and made of 100% biodegradable materials (i.e., cotton, hemp or jute).

Compost filter tubes shall be a minimum of 12 inches in diameter installed. Tubes shall be placed, filled, and staked in place as required to ensure stability against water flows. All tubes shall be tamped, but not trenched, to ensure good contact with soil.

10/06/2026-14

Where reinforcement is necessary, additional tubes shall be installed as shown on the plans.

Straw Bales

Straw bales shall be used if shown on the plans or when specified by Orders of Condition or other permitting.

Straw bales shall conform to the following:

Bales should be a minimum size of 12 x 16 x 36 inches and shall be placed in a single row, lengthwise on the contour, with ends of adjacent bales tightly abutting one another.

The bales shall be trenched and backfilled. The trench shall be excavated the width of the bale and the length of the proposed barrier to a depth of 4 inches. After the bales are staked the excavated soil shall be backfilled against the barrier. Backfill soil shall conform to the ground level on the downhill side and shall be built up to 4 inches against the uphill side of the barrier.

Straw Wattle

Straw wattle shall be a minimum of 12 inches in diameter. Straw filling shall conform to the requirements of Section M6.04.2, shall be encased in durable netting, and shall have a density of

3 lb/foot.

Straw wattle shall be trenched in 3 inches deep and staked according to the plans. The wattles shall be sufficiently secure on the upstream side to prevent water flowing underneath the wattle.

Silt Fence

Materials and Installation shall be per Section 670.40 of the Standard Specifications and the following:

Silt fence shall be used if shown on the plans or when specified by Orders of Condition or other permitting.

When used with compost filter tubes, the tube shall be placed on a minimum of 8 inches of folded fabric on the upslope side of the fence. Fabric does not need to be trenched.

When used with straw bales, an 8-inch deep and 4-inch wide trench or V-trench shall be dug on the upslope side of the fence line. One foot of fabric shall be placed in the bottom of the trench followed by backfilling with compacted earth or gravel. Stakes shall be driven 16 inches into the ground on the down slope side of the trench and shall be spaced such that the fence remains vertical and effective.

Width of fabric shall be sufficient to provide a 36-inch high barrier after fabric is folded or trenched. Sagging fabric will require additional staking or other anchoring.

Stakes

Stakes for anchoring Compost Filter Tubes, Straw Wattles, and Straw Bales shall be as shown on the plans and shall be a minimum of 1x1 inch diameter x 4 feet hardwood stakes.

10/06/2026-15

When used with Silt Fence, stakes for Compost Filter Tubes shall be driven 12 inches into the ground, Stakes for Straw Bales shall be driven 16 inches into the ground.

Stakes of other material of equivalent strength may be used if approved by the Engineer.

Maintenance

Maintenance of Sediment Control Barriers shall be per Section 670.40 of the Standard

Supplemental Specifications or per the Stormwater Pollution Prevention Plan (SWPPP).

The contractor shall inspect the sediment barrier after each rain event and as specified in relevant permits to ensure that they are working effectively and as intended. Contractor shall be responsible for ensuring that an effective barrier is in place for all phases of the contract.

Barriers that decompose naturally due to weatherization over time such that they no longer provide the function required shall be repaired or replaced as directed. If the resulting berm of compost within the fabric tube is sufficiently intact and continues to provide water and sediment control, barrier does not necessarily require replacement.

Dismantling & Removing

Barriers shall be dismantled and/or removed when construction work is complete and when site conditions are sufficiently stable to prevent surface erosion and after receiving permission to do so from the Engineer.

For all instances, all nonbiodegradable material, including photo-biodegradable fabric, plastic netting, nylon twine, and silt fence, shall be removed and disposed off-site by the Contractor regardless of site context.

For naturalized areas, biodegradable, natural fabric and material may be left in place to decompose on-site. Compost filter tubes may be left as they are with stakes removed. Straw bales shall be broken down and spread evenly. All nylon or nonbiodegradable twine shall be removed along with silt fence. Wooden stakes may be left on site, placed neatly and discretely.

In urban, residential, and other locations where aesthetics is a concern, the following shall apply:

• Filter tube fabric shall be cut and removed, and compost shall be raked to blend evenly

(similar to a soil amendment or mulch). Not more than a 2-inch depth shall be left on soil substrate.

• Straw bales shall be removed and disposed off-site by the Contractor. Areas of trenching shall be raked smooth and disturbed soils stabilized with a seed mix matching adjacent grasses (i.e., lawn or native grass mix).

• Silt fence, stakes, and other debris shall be removed and disposed off-site. Site shall look neat and clean upon completion.

10/06/2026-16

Item 767.121 will be measured and paid for at the contract unit price per foot of sediment control barrier which price shall include all labor, equipment, materials, maintenance, dismantling, removal, restoration of soil, and all incidental costs required to complete the work.

Silt fence or turtle protection barrier (if required per Item 755.77), when used in conjunction with compost filter tubes or straw bales, will be incidental to this item.

Additional barrier, such as double or triple stacking of compost filter tubes, shall be paid for per foot of tube installed.

Barriers that have been driven over or otherwise damage by construction activities shall be repaired or replaced as directed by the Engineer at the Contractors expense.

ITEM 755.77 TURTLE MONITORING PLAN HOUR

Work under this Item shall be for services of a qualified Biologist, or other professional with similar qualifications for the development of a Turtle Protection Plan as part of the List of

Conditions set forth by Mass Wildlife, Division of Fisheries & Wildlife which include all coordination efforts in implanting the plan with the noted Agency. See conditions listed in the

NHESP Permit in Appendix C.

The Biologist shall demonstrate knowledge and expertise to coordinate and oversee all work associated with the Turtle Monitoring Plan as defined herein, as shown on the Plans, and as required by permits.

If the plan requires a turtle protection barrier, it will be paid for under Item 767.121, Sediment

Control Barrier.

QUALIFICATIONS

The Biologist shall have a minimum of five (5) years of experience with construction and monitoring of wildlife. When required by permits, at least ten (10) years of experience may be required.

METHOD OF MEASUREMENT

Item 755.77 Turtle Monitor Plan shall be measured per hour for on-site service provided by the

Biologist to monitor his/her plan.

Work shall include all the plan development, agency coordination, inspections, photos, submittals, and associated tasks for construction and restoration oversight, narratives for Conditional and Final

Acceptance, Request for Certificate of Compliance (Partial or Full) if required, documentation

10/06/2026-17 required for permits, and all other work specified above. Payment shall not include travel time or time spent off-site on reports. Decimal Pay Limits will be 0.25 hours.

BASIS OF PAYMENT

Item 755.77 Turtle Monitor Plan shall be paid at the Contractor bid price for each hour, or fraction thereof, spent on-site to perform the work as described above. Reports and photo documentation are required for payment.

ITEM 983.4 STEP ROCK STRUCTURE TON

The purpose of this item is to provide an in-stream Step Rock Structure by placement of large stones or boulders across the entire cross sectional area of the proposed stream valley. The purpose is to provide grade control to both the stream channel and adjacent floodplain or bankfull bench area in one continuous structure.

The step rock structure shall consist of large stone boulders with appropriately sized dimensions as detailed in the plan to be able to resist the tractive forces of water within the cross sectional area of the restored or stabilized stream reach.

The Step Rock Structure is intended to provide immediate grade control to the flood plain/bankfull bench and stream channel areas of restored or stabilized stream reaches. The Step Rock Structure shall be effective in providing vertical grade control of the proposed or existing streambed and preventing future head cuts from migrating upstream. The Step Rock Structure shall be effective in preventing the down-valley migration or short-cutting of stream channels during higher flows events and shall maintain the planned form geometry of the stream channel.

Rock utilized shall have a minimum specific gravity of 2.5 as determined according to AASHTO

T 85, bulk saturated, but surface-dry basis. It is recommended that the boulders be properly sized to resist tractive forces utilizing empirical relationships for shear stress and velocities for the anticipated 100-year design storm. Limestone rock is not acceptable for use.

CONSTRUCTION

All erosion and sediment control devices shall be installed in accordance with the approved

Temporary Control of Water submission.

Flow from the stream shall be diverted away from the work area in accordance with the approved

Temporary Control of Water submission. It is recommended that the installation of the boulders occur during a period of dry weather and low flow conditions to ensure that streambed and floodplain materials properly settle around the boulders.

10/06/2026-18

Placement of the Step Rock Structure shall first consist of digging a trench in the streambed and bankfull bench area which will accommodate the dimensions of the rocks to be utilized. The rock shall be placed within the trench, with each rock making secure contact with each other to form one continuous chain of rocks. The tops of the rocks shall conform to the lines and grades of the streambed and floodplain/bankfull bench areas and shall not protrude above the surface. Gaps and void spaces between individual rocks shall be filled and compacted with smaller rocks or rock fragments and native gravel material. Backfill and compact all areas of the excavated trench against the placed rock. The ends of the Step Rock Structure placed near the toe of proposed cut, shall be buried a minimum of 2 feet into the proposed cut slope.

Item 983.4 will be measured and paid for at the contract unit price per Ton of Step Rock Structure constructed and accepted by the Engineer which price shall include all labor, equipment, materials, maintenance, and all incidental costs required to complete the work.

ITEM 983.6 STREAMBED RESTORATION CUBIC YARD

The purpose of this item is to provide additional material to restore the disturbed or newly created areas of the streambed, as directed by the Engineer.

The work to be done under this item shall conform to the relevant provisions of Section 983 of the Standard

This work shall consist of furnishing and placing stone fill material on the brook bed and bank as well as inside, upstream and/or downstream of, a structure to set a desired channel profile, maintain a natural bed appearance, and maintain aquatic organism passage. The ultimate product will, to the extent possible, replicate the function and appearance of the existing stream, as illustrated by photo documentation herein.

All excavation required for placement of streambed restoration that are outside of the limits of the bridge excavation as shown in the plans shall be incidental to this item.

The Contractor shall coordinate with his/her sub-contractors to ensure all required equipment is available on-site to complete the work described below. The streambed restoration is an important element to comply with the environmental permits issued for the project.

MATERIAL

The streambed restoration is to be installed as depicted on the plans including random placement of cluster of boulders.

Any native river bed material, meeting the criteria below, can be excavated from the existing streambed banks shall be stockpiled and reused for the streambed restoration, provided the

10/06/2026-19 excavated stone is characteristic of the existing stream material upstream and downstream of the work area, or meets the below criteria. The elevations and conditions of the existing streambed shall be maintained to the maximum extent practicable.

If the excavated material is not suitable or there is not enough material, the streambed restoration shall be locally sourced, rounded river stone, that matches the composition of the native brook bed.

The following gradation may be used as a guide.

Streambed Material Gradation (not including boulders)

Stone/Sieve Size % Finer

24 inches 100

6 inches(Cobbles) 30-75

No. 4 4-30

No. 200 4-6

In addition, the streambed material will include 12 to 18 inch boulders per the cluster boulder detail in the plans.. The proposed streambed restoration material shall be approved by the Resident

Engineer prior to use.

A 12” to 24” thick layer of streambed material is to be placed over the excavated streambed surfaces that will create the proposed widened channel as depicted on the plans. The initial placement of streambed material shall fill / choke the voids in the underlying material. The underlying material shall be choked with finer streambed material, and shall consist of a well-graded mix of cobbles,gravel, sand and silt that represents the local streambed. Fill voids by hand tamping with metal tamping rods, by shaking stone with the teeth of an excavator bucket, and/or by spraying water to settle fines between large stones. Plate compactors shall not be used. The purpose for filling the voids is to prevent subsurface flow where water disappears into the large voids in the stone fill below the channel bed surface.

A 12” to 24” layer of streambed material shall be installed on top of the newly created channel section to restore streambed habitat and aesthetics. The material shall be installed during dewatered conditions. Where appropriate based on existing conditions at the site, a higher proportion of larger native boulders from the natural streambed material mix shall be placed in the channel to protect the banks or structures. Larger material (12” to 18” boulders) within the streambed material shall be partially embeded within the upper layer, and extend up above the channel bed to maintain a natural level of hydraulic roughness and re-establish fish habitat.

Once all material has been placed in the stream channel and approved by the Engineer, the

Contractor shall remove the cofferdams in such a way to slowly wet the stream to minimize the initial sediment pulse. Every attempt shall be made to minimize the downstream movement of sediment.

The final streambed shall look like a natural river, shall match nearby reaches, and there shall be

10/06/2026-20 minimal to no subsurface flow upon final inspection by the Engineer.

The Contractor shall submit to the Engineer for approval prior to the start of operations, a placement plan and method of placement.

METHOD OF MEASUREMENT

The quantity of streambed restoratoin material to be measured for payment will be the number of cubic yards streambed restoration material installed in the complete and accepted work, measured within the limits shown on the Plans or as directed by the Engineer.

BASIS OF PAYMENT

Measurement and Payment for streambed restoration will be measured for payment by the cubic yard, complete in place. Streambed restoration will be paid for at the Contract unit price per cubic yard, which price shall include all labor, materials, equipment, transportation and incidental costs required to complete the work.

EXISTING CULVERT ENDS DOWNSTREAM CHANNEL

10/06/2026-21

ITEM 991.1 CONTROL OF WATER STRUCTURE NO. R-06-016 LUMP SUM

The Work under this Item shall conform to the relevant provisions of Section 140 of the Standard

This Item includes all dewatering necessary to accomplish the demolition of the HDPE pipe culverts, and the construction of the new frame footings and wingwalls.

The Contractor’s attention is directed to the section of these Special Provisions that addresses the requirements for Sedimentation and Erosion Controls for this project.

The Cone Brook diversions and dewatering of excavation shall be conducted to ensure that the culvert is removed and construction of the new abutments and wingwalls is done “in the dry.”

As part of the work under this Item, it is the responsibility of the Contractor to determine the need and extent of water diversions, sedimentation basins and dewatering techniques and sedimentation controls needed to control water and sediment at the site. During the actual process of executing the excavation operations, the Contractor shall submit the methods and materials he/she proposes to use for the Engineer’s approval.

Plans and Calculations for water retaining and dewatering measures shall be developed by the

Contractor for this Item, prepared and stamped by a Professional Engineer Registered in the

Commonwealth of Massachusetts and submitted for the review of the Engineer prior to the start of construction.

Water diversions shall be conducted in such a manner as to minimize siltation and prevent contamination of the waterway. Maximum screen sizes on the inlet side of all pumps shall not exceed ½ inch.

The Contractor shall develop the design of the system, which may consist of the following components:

• Installation of precast concrete median barriers or blocks covered with sedimentation fabric to reduce water infiltration.

• Sandbag dams or training walls installed to provide temporary control of water.

The Contractor is advised that the effectiveness of the water control method used will vary based on the field conditions and the time at which the actual excavation work is being performed. The

Engineer has the right to order the Contractor to stop all excavation operations when in his/her judgment the Contractor’s water control operations are failing to produce adequate results or are posing a threat to the environment.

10/06/2026-22

The Contractor shall provide the means of removing all sediment from water pumped from the excavation areas; this shall include the use of sedimentation basins, check dams, sedimentation fences or tanks as directed in the Special Provisions under Sedimentation and Erosion Controls.

The plans show a conceptual temporary control of water diversion system which may consist of using the existing 3-foot diameter HDPE pipes used in combination with stacked sandbag inlets and outlets. This system was determined to be adequate to convey a 2-year storm event. An alternative system may be proposed but must be adequate to convey the 2-year storm event. The sandbags shall prevent water flow into the construction area for flows up to the 2-year storm event water surface elevation shown on the Plans. The Contractor shall adjust the height of the water control dam structure if needed and use supplemental pumping in the event of an extreme rain event or unusually high flows. The Contractor shall comply with all conditions included with the

Town of Richmond Conservation Commission Order of Conditions, dated January 22, 2025, attached hereto (see Appendices). Any special requirements noted in the Special Conditions shall be included in the cost of Item 991.1 including an Ecological Restoration Plan and retaining a licensed professional wildlife consultant, approved by the Conservation Commission, to be present on-site during the dewatering of Cone Brook.

This is the start of the file's text. The full file is on GovTribe.