WageSchedule_20261021131936_Sleepy_Hollow.pdf
PDF 106 KB Posted
- Attached to
- Sleepy Hollow Road Bridge Replacement Project
- Solicitation number
- FY27-RICHMOND
- Issued by
- Berkshire County, Massachusetts
About this file
Prevailing Wage Schedule Summary
This document is a Prevailing Wage Schedule issued by the Massachusetts Department of Labor Standards for the Sleepy Hollow Road Bridge Replacement Project in the Town of Richmond. The schedule establishes minimum wage rates applicable to all employees performing construction work on this public works project, which involves replacing an existing culvert with a precast concrete frame structure and restoring Cone Brook to its natural state. The project is located approximately 0.4 miles east of the intersection of State Highway 41 and Sleepy Hollow Road. The schedule was issued on October 22, 2026, under Wage Request Number 20261021131936 and applies to Contract Number 26-27D. All contractors and subcontractors must incorporate this prevailing wage schedule into their contracts, post it at the worksite, and maintain weekly certified payroll records for three years. The awarding authority must request an updated schedule no later than two weeks before any multi-year project anniversary date or within 90 days if bids have not been opened.
The prevailing wage schedule contains comprehensive classification listings with effective dates ranging from mid-2024 through 2029, specifying base wages, health insurance, pension, annuity, and supplemental unemployment benefits for over 100 construction classifications. Wages vary by trade, union local, and geographic zone, with total rates ranging from approximately $27.74 for field engineering positions to $151.53 for specialized pile driving work. The schedule includes apprentice rates as percentages of journeyworker wages with specified apprentice-to-journeyworker ratios, requiring apprentices to be registered with the Massachusetts Division of Apprentice Standards and carry valid apprentice ID cards. Contractors must pay employees at least the listed wage rate; failure to comply subjects them to civil fines, criminal charges, or private lawsuits. Employees underpaid according to the schedule may file complaints with the Attorney General's Fair Labor Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sleepy_Hollow_Road_Bridge_Replacement_Project.pdf | ||
| Richmond_Prequal_Approval_12.17.26.pdf | ||
| Conservation_Commission_Memo.pdf | ||
| 20261006_R06016_Special_Provisions_Final.pdf | ||
| 3-24-95_R-06-016_SIGNED_PLANS.pdf | ||
| SECTION_00500_–_OWNER-CONTRACTOR_AGREEMENT_FOR_PUBLIC_WORKS_CONSTRUCTION.docx | DOCX document | |
| SECTION_00620_-_PAYMENT_BOND.docx | DOCX document | |
| SECTION_00610_-_PERFORMANCE_BOND.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Richmond City/Town: RICHMOND
Wage Request No: 20261021131936 Job Location: State HWY 41 and Sleepy Hollow Road
Description of Work: The proposed replacement project will replace the bridge and a culvert with a precast concrete frame structure with precast concrete wingwalls and restore the stream channel to its natural state
Contract Number:
§§ 26-27D Construction Project
This Prevailing Wage Schedule establishes the minimum wage rates that employees on this public works construction project must be paid. The project’s Wage Request Number is listed above and on all pages of this Schedule. This schedule applies only to this specific project.
Awarding Authority Responsibilities Contractor Responsibilities
You must include this Prevailing Wage Schedule (PWS) or an appropriate reference to it in all advertisements and calls for bids.
The PWS must be incorporated in its entirety into all contracts for this project (G.L. c. 149, § 27).
The wage rates on this PWS will remain in effect for the duration of the project. Exception: You must request an updated schedule for any multi-year construction project no later than 2 weeks before the project’s yearly anniversary date.
For CM AT RISK projects, the anniversary date is the earlier of the signing date of: (a) the GMP Amendment; or (b) the first amendment to permit procurement of construction services.
For all other construction projects, the anniversary date is the date the contract was signed by the Awarding Authority and the General
Contractor.
You must also request an updated PWS if you have not opened bids or selected a contractor within 90 days of the date of issuance on this PWS.
For CM AT RISK projects, the earlier of (a) the signing date of the
GMP Amendment; or (b) the bid for the first construction scope of work must be within 90 days of the date of issuance on this Schedule.
You must provide any updated PWS to all contractors working on the project, including general and sub-contractors.
You must keep the contractors’ weekly certified payroll records and
Statements of Compliance on file for 3 years.
Awarding authorities have other prevailing wage responsibilities not listed above. Learn more at: [Prevailing wage: for awarding authorities |
Mass.gov] and G.L. c. 149, §§ 26-27D.
You must pay all employees who perform construction work on this project at least the wage rate listed on this PWS. Warning! If you do not follow this requirement, you can face civil fines, criminal charges, or private lawsuits.
You must post this PWS at the worksite where it can be easily seen. (G.L.
c. 149, § 27)
You must file weekly payroll reports and a Statement of Compliance with the awarding authority (not DLS). You can file payroll reports by mail or email and must keep them on file for 3 years. Each weekly payroll report must include each employees’ name, address, occupational classification(s), hours worked, and wages paid. Find a sample report at:
mass.gov/dols/pw.
You cannot pay any employees at the apprentice rates listed on this PWS unless they are registered with the Massachusetts Division of Apprentice
Standards (DAS). Qualifying apprentices must be paid at the applicable step rate and must carry their apprentice ID card during all work hours on the project. Apprentices not registered with DAS must be paid at the listed journeyworker’s rate, even if they are registered with a different federal/state public agency or private entity. For every week in which apprentice rates are paid, a copy of each apprentice's apprentice ID card issued by DAS shall be attached to the certified payroll records.
If you don’t know what classification or rate applies to the work being performed, you must ask DLS; paying the wrong rate subjects you to enforcement.
Please contact DLS if you have any questions about the Prevailing Wage
Schedule: (617) 626-6953 or DLS.Feedback@mass.gov
Employees who are not paid the wage listed on the Prevailing Wage Schedule (PWS) may file a complaint with the Attorney General’s Fair Labor
Page 1 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026 https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities mailto:DLS.Feedback@mass.gov
Division: www.mass.gov/ago/fld; (617) 727-3465.
Page 2 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026 https://www.mass.gov/ago/fld
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2026 $36.97 $10.90 $9.75 $6.60 $0.00 $64.22
12/1/2026 $39.39 $10.90 $9.75 $6.60 $0.00 $66.64
6/1/2027 $40.79 $10.90 $9.75 $6.60 $0.00 $68.04
12/1/2027 $42.19 $10.90 $9.75 $6.60 $0.00 $69.44
6/1/2028 $43.69 $10.90 $9.75 $6.60 $0.00 $70.94
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $45.19 $10.90 $9.75 $6.60 $0.00 $72.44
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.75 $10.90 $9.75 $6.60 $0.00 $65.00AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $39.04 $10.90 $9.75 $6.60 $0.00 $66.29
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
ASBESTOS WORKER (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (SPRINGFIELD)
12/1/2025 $40.32 $14.50 $4.30 $6.25 $0.00 $65.37
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
ASPHALT RAKER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.25 $10.90 $9.75 $6.60 $0.00 $64.50ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.54 $10.90 $9.75 $6.60 $0.00 $65.79
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
Page 3 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.97 $10.90 $9.75 $6.60 $0.00 $64.22
12/1/2026 $39.39 $10.90 $9.75 $6.60 $0.00 $66.64
6/1/2027 $40.79 $10.90 $9.75 $6.60 $0.00 $68.04
12/1/2027 $42.19 $10.90 $9.75 $6.60 $0.00 $69.44
6/1/2028 $43.69 $10.90 $9.75 $6.60 $0.00 $70.94
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $45.19 $10.90 $9.75 $6.60 $0.00 $72.44
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.75 $10.90 $9.75 $6.60 $0.00 $65.00BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $39.04 $10.90 $9.75 $6.60 $0.00 $66.29
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
8/1/2026 $58.56 $12.84 $15.57 $5.89 $0.00 $92.86BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (SPRINGFIELD/PITTSFIELD)
2/1/2027 $59.96 $12.84 $15.57 $5.89 $0.00 $94.26
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.28 $12.84 $15.57 $5.89 $0.00 $63.58
2 60.00 $35.14 $12.84 $15.57 $5.89 $0.00 $69.44
3 70.00 $40.99 $12.84 $15.57 $5.89 $0.00 $75.29
4 80.00 $46.85 $12.84 $15.57 $5.89 $0.00 $81.15
Page 4 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $50.40 $10.90 $9.75 $9.80 $0.00 $80.85CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.90 $10.90 $9.75 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.25 $10.90 $9.75 $9.80 $0.00 $79.70CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $50.75 $10.90 $9.75 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.58 $10.90 $9.75 $9.80 $0.00 $80.03CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.08 $10.90 $9.75 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
9/1/2026 $44.76 $9.19 $11.25 $6.90 $0.00 $72.10CARPENTER
CARPENTERS
CARPENTERS LOCAL 336 - BERKSHIRE COUNTY
3/1/2027 $45.66 $9.19 $11.25 $6.90 $0.00 $73.00
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
5 90.00 $52.70 $12.84 $15.57 $5.89 $0.00 $87.00
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.98 $12.84 $15.57 $5.89 $0.00 $64.28
2 60.00 $35.98 $12.84 $15.57 $5.89 $0.00 $70.28
3 70.00 $41.97 $12.84 $15.57 $5.89 $0.00 $76.27
4 80.00 $47.97 $12.84 $15.57 $5.89 $0.00 $82.27
5 90.00 $53.96 $12.84 $15.57 $0.00 $0.00 $82.37
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
Page 5 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame)
10/1/2026 $28.14 $7.66 $4.47 $1.00 $0.00 $41.27
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $20.14 $9.19 $0.00 $1.40 $0.00 $30.73
2 45.00 $20.14 $9.19 $0.00 $1.40 $0.00 $30.73
3 55.00 $24.62 $9.19 $0.00 $2.76 $0.00 $36.57
4 55.00 $24.62 $9.19 $0.00 $2.76 $0.00 $36.57
5 70.00 $31.33 $9.19 $11.21 $4.14 $0.00 $55.87
6 70.00 $31.33 $9.19 $11.21 $4.14 $0.00 $55.87
7 80.00 $35.81 $9.19 $11.23 $5.52 $0.00 $61.75
8 80.00 $35.81 $9.19 $11.23 $5.52 $0.00 $61.75
Apprentice: CARPENTER
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $20.55 $9.19 $0.00 $1.40 $0.00 $31.14
2 45.00 $20.55 $9.19 $0.00 $1.40 $0.00 $31.14
3 55.00 $25.11 $9.19 $0.00 $2.76 $0.00 $37.06
4 55.00 $25.11 $9.19 $0.00 $2.76 $0.00 $37.06
5 70.00 $31.96 $9.19 $11.21 $4.14 $0.00 $56.50
6 70.00 $31.96 $9.19 $11.21 $4.14 $0.00 $56.50
7 80.00 $36.53 $9.19 $11.23 $5.52 $0.00 $62.47
8 80.00 $36.53 $9.19 $11.23 $5.52 $0.00 $62.47
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.88 $7.66 $0.00 $0.00 $0.00 $24.54
2 60.00 $16.88 $7.66 $0.00 $0.00 $0.00 $24.54
3 65.00 $18.29 $7.66 $0.00 $0.00 $0.00 $25.95
4 70.00 $19.70 $7.66 $0.00 $0.00 $0.00 $27.36
5 75.00 $21.11 $7.66 $4.47 $0.00 $0.00 $33.24
6 80.00 $22.51 $7.66 $4.47 $0.00 $0.00 $34.64
7 85.00 $23.92 $7.66 $4.47 $0.00 $0.00 $36.05
8 90.00 $25.33 $7.66 $4.47 $0.00 $0.00 $37.46
Apprentice to Journeyworker Ratio: 1:5
Page 6 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
7/1/2026 $49.32 $13.20 $16.30 $2.93 $1.69 $83.44
1/1/2027 $50.51 $13.20 $16.30 $2.93 $1.69 $84.63
7/1/2027 $51.70 $13.20 $16.30 $2.93 $1.69 $85.82
CEMENT MASONRY/PLASTERING
PLASTERERS AND CEMENT MASONS LOCAL 534
Plasterers and Cement Masons - Zone 2
1/1/2028 $52.89 $13.20 $16.30 $2.93 $1.69 $87.01
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 3
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.66 $13.20 $16.30 $0.00 $0.00 $54.16
2 60.00 $29.59 $13.20 $16.30 $2.93 $1.69 $63.71
3 65.00 $32.06 $13.20 $16.30 $2.93 $1.69 $66.18
4 70.00 $34.52 $13.20 $16.30 $2.93 $1.69 $68.64
5 75.00 $36.99 $13.20 $16.30 $2.93 $1.69 $71.11
6 80.00 $39.46 $13.20 $16.30 $2.93 $1.69 $73.58
7 90.00 $44.39 $13.20 $16.30 $2.93 $0.00 $76.82
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $25.26 $16.30 $16.30 $0.00 $0.00 $57.86
2 60.00 $30.31 $16.30 $16.30 $2.93 $1.69 $67.53
3 65.00 $32.83 $16.30 $16.30 $2.93 $1.69 $70.05
4 70.00 $35.36 $16.30 $16.30 $2.93 $1.69 $72.58
5 75.00 $37.88 $16.30 $16.30 $2.93 $1.69 $75.10
6 80.00 $40.41 $16.30 $16.30 $2.93 $1.69 $77.63
7 90.00 $45.46 $16.30 $16.30 $2.93 $0.00 $80.99
Apprentice to Journeyworker Ratio: 1:5
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total
Page 7 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
DEMO: JACKHAMMER OPERATOR
LABORERS
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 8 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $78.11 $10.08 $11.62 $12.67 $0.00 $112.48 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $49.19 $10.08 $11.62 $12.67 $0.00 $83.56 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87ELECTRICIAN (Including Core Drilling)
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
Apprentice: ELECTRICIAN (Including Core Drilling)
Effective Date: 6/28/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $21.76 $7.80 $0.63 $0.00 $0.00 $30.19
2 45.00 $24.48 $7.80 $0.70 $0.00 $0.00 $32.98
3 50.00 $27.21 $14.00 $7.53 $0.00 $0.00 $48.74
4 55.00 $29.93 $14.00 $7.61 $0.00 $0.00 $51.54
5 65.00 $35.37 $14.00 $9.84 $0.00 $0.00 $59.21
Page 9 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
1/1/2026 $69.23 $16.38 $11.06 $10.70 $0.00 $107.37ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $72.23 $16.48 $11.16 $11.00 $0.00 $110.87
1/1/2026 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60ELEVATOR CONSTRUCTOR HELPER
Apprentice: ELECTRICIAN (Including Core Drilling)
Effective Date: 6/28/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
6 70.00 $38.09 $14.00 $11.30 $0.00 $0.00 $63.39
Apprentice: ELECTRICIAN (Including Core Drilling)
Effective Date: 1/3/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $22.22 $7.95 $0.63 $0.00 $0.00 $30.80
2 45.00 $25.00 $7.95 $0.70 $0.00 $0.00 $33.65
3 50.00 $27.78 $14.25 $7.53 $0.00 $0.00 $49.56
4 55.00 $30.56 $14.25 $7.61 $0.00 $0.00 $52.42
5 65.00 $36.11 $14.25 $9.84 $0.00 $0.00 $60.20
6 70.00 $38.89 $14.25 $11.30 $0.00 $0.00 $64.44
Apprentice to Journeyworker Ratio: 2:3
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $34.62 $16.38 $0.00 $0.00 $0.00 $51.00
2 55.00 $38.08 $16.38 $11.06 $10.70 $0.00 $76.22
3 65.00 $45.00 $16.38 $11.06 $10.70 $0.00 $83.14
4 70.00 $48.46 $16.38 $11.06 $10.70 $0.00 $86.60
5 80.00 $55.38 $16.38 $11.06 $10.70 $0.00 $93.52
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $36.12 $16.48 $0.00 $0.00 $0.00 $52.60
2 55.00 $39.73 $16.48 $11.16 $11.00 $0.00 $78.37
3 65.00 $46.95 $16.48 $11.16 $11.00 $0.00 $85.59
4 70.00 $50.56 $16.48 $11.16 $11.00 $0.00 $89.20
5 80.00 $57.78 $16.48 $11.16 $11.00 $0.00 $96.42
Page 10 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $50.56 $16.48 $11.16 $11.00 $0.00 $89.20
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
FENCE & BEAM RAIL ERECTOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $44.69 $10.90 $9.75 $6.60 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.25 $10.90 $9.75 $6.60 $0.00 $64.50FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.54 $10.90 $9.75 $6.60 $0.00 $65.79
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
FIELD ENG.INST/ROD-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $18.84 $4.80 $4.10 $0.00 $0.00 $27.74
FIELD ENG.PARTY CHIEF:BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $21.33 $4.80 $4.10 $0.00 $0.00 $30.23
FIELD ENG.SURVEY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
6/1/1999 $22.33 $4.80 $4.10 $0.00 $0.00 $31.23
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
For apprentice rates see "Apprentice- ELECTRICIAN"
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONING
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
6/1/2026 $29.21 $10.90 $9.75 $6.60 $0.00 $56.46FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.90 $9.75 $6.60 $0.00 $56.46
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
9/1/2026 $45.29 $8.56 $11.25 $6.90 $0.00 $72.00FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE III
3/1/2027 $46.19 $8.56 $11.25 $6.90 $0.00 $72.90
Apprentice: FLOORCOVERER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total
Page 11 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $44.73 $11.20 $8.40 $6.05 $0.00 $70.38
6/1/2027 $46.73 $11.60 $8.55 $6.60 $0.00 $73.48
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 1333
GLAZIERS LOCAL 1333
6/1/2028 $48.73 $12.00 $8.70 $7.20 $0.00 $76.63
Apprentice: FLOORCOVERER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $20.38 $8.56 $0.00 $1.38 $0.00 $30.32
2 45.00 $20.38 $8.56 $0.00 $1.38 $0.00 $30.32
3 55.00 $24.91 $8.56 $0.00 $2.76 $0.00 $36.23
4 55.00 $24.91 $8.56 $0.00 $2.76 $0.00 $36.23
5 70.00 $31.70 $8.56 $11.25 $4.14 $0.00 $55.65
6 70.00 $31.70 $8.56 $11.25 $4.14 $0.00 $55.65
7 80.00 $36.23 $8.56 $11.25 $5.52 $0.00 $61.56
8 80.00 $36.23 $8.56 $11.25 $5.52 $0.00 $61.56
Apprentice: FLOORCOVERER
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $20.79 $8.56 $0.00 $1.38 $0.00 $30.73
2 45.00 $20.79 $8.56 $0.00 $1.38 $0.00 $30.73
3 55.00 $25.40 $8.56 $0.00 $2.76 $0.00 $36.72
4 55.00 $25.40 $8.56 $0.00 $2.76 $0.00 $36.72
5 70.00 $32.33 $8.56 $11.25 $4.14 $0.00 $56.28
6 70.00 $32.33 $8.56 $11.25 $4.14 $0.00 $56.28
7 80.00 $36.95 $8.56 $11.25 $5.52 $0.00 $62.28
8 80.00 $36.95 $8.56 $11.25 $5.52 $0.00 $62.28
Apprentice Notes
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $22.37 $11.20 $8.40 $6.05 $0.00 $48.02
2 56.25 $25.16 $11.20 $8.40 $6.05 $0.00 $50.81
3 62.50 $27.96 $11.20 $8.40 $6.05 $0.00 $53.61
4 68.75 $30.75 $11.20 $8.40 $6.05 $0.00 $56.40
5 75.00 $33.55 $11.20 $8.40 $6.05 $0.00 $59.20
6 81.25 $36.34 $11.20 $8.40 $6.05 $0.00 $61.99
7 87.50 $39.14 $11.20 $8.40 $6.05 $0.00 $64.79
Page 12 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
7/1/2026 $43.48 $13.24 $11.01 $9.92 $2.13 $79.78
1/1/2027 $43.48 $13.54 $11.01 $11.12 $2.13 $81.28
7/1/2027 $44.98 $13.54 $11.01 $11.12 $2.13 $82.78
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 63
SHEETMETAL WORKERS LOCAL 63
1/1/2028 $46.48 $13.54 $11.01 $11.12 $2.13 $84.28
For apprentice rates see "Apprentice- SHEET METAL WORKER"
6/28/2026 $54.41 $14.00 $8.43 $7.03 $0.00 $83.87HVAC (ELECTRICAL CONTROLS)
ELECTRICIANS LOCAL 7
ELECTRICIANS LOCAL 7
1/3/2027 $55.56 $14.25 $8.47 $7.09 $0.00 $85.37
For apprentice rates see "Apprentice- ELECTRICIAN"
7/1/2026 $43.48 $13.24 $11.01 $9.92 $2.13 $79.78
1/1/2027 $43.48 $13.54 $11.01 $11.12 $2.13 $81.28
7/1/2027 $44.98 $13.54 $11.01 $11.12 $2.13 $82.78
HVAC (TESTING AND BALANCING - AIR)
SHEETMETAL WORKERS LOCAL 63
SHEETMETAL WORKERS LOCAL 63
1/1/2028 $46.48 $13.54 $11.01 $11.12 $2.13 $84.28
For apprentice rates see "Apprentice- SHEET METAL WORKER"
9/17/2026 $54.26 $13.85 $10.85 $7.10 $0.00 $86.06
3/17/2027 $56.26 $13.85 $10.85 $7.10 $0.00 $88.06
9/17/2027 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
3/17/2028 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
9/17/2028 $62.26 $13.85 $10.85 $7.10 $0.00 $94.06
HVAC (TESTING AND BALANCING -WATER)
PLUMBERS & PIPEFITTERS LOCAL 104
PLUMBERS & PIPEFITTERS LOCAL 104
3/17/2029 $64.26 $13.85 $10.85 $7.10 $0.00 $96.06
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
9/17/2026 $54.26 $13.85 $10.85 $7.10 $0.00 $86.06
3/17/2027 $56.26 $13.85 $10.85 $7.10 $0.00 $88.06
HVAC MECHANIC
PLUMBERS & PIPEFITTERS LOCAL 104
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
8 93.75 $41.93 $11.20 $8.40 $6.05 $0.00 $67.58
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 6/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $23.37 $11.60 $8.55 $6.60 $0.00 $50.12
2 56.25 $26.29 $11.60 $8.55 $6.60 $0.00 $53.04
3 62.50 $29.21 $11.60 $8.55 $6.60 $0.00 $55.96
4 68.75 $32.13 $11.60 $8.55 $6.60 $0.00 $58.88
5 75.00 $35.05 $11.60 $8.55 $6.60 $0.00 $61.80
6 81.25 $37.97 $11.60 $8.55 $6.60 $0.00 $64.72
7 87.50 $40.89 $11.60 $8.55 $6.60 $0.00 $67.64
8 93.75 $43.81 $11.60 $8.55 $6.60 $0.00 $70.56
Apprentice to Journeyworker Ratio: 3:1
Page 13 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
9/17/2027 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
3/17/2028 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
9/17/2028 $62.26 $13.85 $10.85 $7.10 $0.00 $94.06
PLUMBERS & PIPEFITTERS LOCAL 104
3/17/2029 $64.26 $13.85 $10.85 $7.10 $0.00 $96.06
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
6/1/2026 $37.75 $10.90 $9.75 $6.60 $0.00 $65.00HYDRAULIC DRILLS (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $39.04 $10.90 $9.75 $6.60 $0.00 $66.29
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (SPRINGFIELD)
9/1/2026 $47.22 $16.15 $11.46 $11.49 $0.00 $86.32
IRONWORKER/WELDER
IRONWORKERS LOCAL 12
IRONWORKERS LOCAL 12
1/1/2025 $39.50 $5.50 $14.28 $4.55 $0.00 $63.83
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.22 $10.90 $9.75 $6.60 $0.00 $63.47LABORER
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $23.61 $16.15 $11.21 $5.75 $0.00 $56.72
2 60.00 $28.33 $16.15 $11.26 $6.89 $0.00 $62.63
3 70.00 $33.05 $16.15 $11.31 $8.04 $0.00 $68.55
4 80.00 $37.78 $16.15 $11.36 $9.19 $0.00 $74.48
Apprentice to Journeyworker Ratio: 1:4
Apprentice: IRONWORKER/WELDER
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 0.00 $23.50 $5.75 $0.00 $3.75 $0.00 $33.00
2 0.00 $25.50 $5.75 $10.00 $3.75 $0.00 $45.00
3 0.00 $27.50 $5.75 $11.42 $3.75 $0.00 $48.42
4 0.00 $29.50 $5.75 $12.85 $3.75 $0.00 $51.85
Apprentice to Journeyworker Ratio: 1:4
Page 14 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.04 $10.90 $9.75 $6.60 $0.00 $67.29
12/1/2027 $41.44 $10.90 $9.75 $6.60 $0.00 $68.69
6/1/2028 $42.94 $10.90 $9.75 $6.60 $0.00 $70.19
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $44.44 $10.90 $9.75 $6.60 $0.00 $71.69
6/1/2026 $37.00 $10.90 $9.75 $6.60 $0.00 $64.25LABORER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.29 $10.90 $9.75 $6.60 $0.00 $65.54
Apprentice: LABORER
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $21.73 $10.90 $9.75 $6.60 $0.00 $48.98
2 70.00 $25.35 $10.90 $9.75 $6.60 $0.00 $52.60
3 80.00 $28.98 $10.90 $9.75 $6.60 $0.00 $56.23
4 90.00 $32.60 $10.90 $9.75 $6.60 $0.00 $59.85
Apprentice: LABORER
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $23.18 $10.90 $9.75 $6.60 $0.00 $50.43
2 70.00 $27.05 $10.90 $9.75 $6.60 $0.00 $54.30
3 80.00 $30.91 $10.90 $9.75 $6.60 $0.00 $58.16
4 90.00 $34.78 $10.90 $9.75 $6.60 $0.00 $62.03
Apprentice to Journeyworker Ratio: 1:5
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $22.20 $10.90 $9.75 $6.60 $0.00 $49.45
2 70.00 $25.90 $10.90 $9.75 $6.60 $0.00 $53.15
3 80.00 $29.60 $10.90 $9.75 $6.60 $0.00 $56.85
4 90.00 $33.30 $10.90 $9.75 $6.60 $0.00 $60.55
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $22.97 $10.90 $9.75 $6.60 $0.00 $50.22
2 70.00 $26.80 $10.90 $9.75 $6.60 $0.00 $54.05
3 80.00 $30.63 $10.90 $9.75 $6.60 $0.00 $57.88
Page 15 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $36.22 $10.90 $9.75 $6.60 $0.00 $63.47
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.04 $10.90 $9.75 $6.60 $0.00 $67.29
12/1/2027 $41.44 $10.90 $9.75 $6.60 $0.00 $68.69
6/1/2028 $42.94 $10.90 $9.75 $6.60 $0.00 $70.19
LABORER: CARPENTER TENDER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $44.44 $10.90 $9.75 $6.60 $0.00 $71.69
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.22 $10.90 $9.75 $6.60 $0.00 $63.47
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.04 $10.90 $9.75 $6.60 $0.00 $67.29
12/1/2027 $41.44 $10.90 $9.75 $6.60 $0.00 $68.69
6/1/2028 $42.94 $10.90 $9.75 $6.60 $0.00 $70.19
LABORER: CEMENT FINISHER TENDER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $44.44 $10.90 $9.75 $6.60 $0.00 $71.69
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $35.67 $10.90 $9.75 $5.41 $0.00 $61.73
12/1/2026 $36.96 $10.90 $9.75 $5.41 $0.00 $63.02
6/1/2027 $38.26 $10.90 $9.75 $5.41 $0.00 $64.32
12/1/2027 $39.56 $10.90 $9.75 $5.41 $0.00 $65.62
6/5/2028 $40.91 $10.90 $9.75 $5.41 $0.00 $66.97
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/4/2028 $42.26 $10.90 $9.75 $5.41 $0.00 $68.32
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $38.22 $10.90 $9.75 $6.60 $0.00 $65.47
12/1/2026 $40.64 $10.90 $9.75 $6.60 $0.00 $67.89
6/1/2027 $42.04 $10.90 $9.75 $6.60 $0.00 $69.29
12/1/2027 $43.44 $10.90 $9.75 $6.60 $0.00 $70.69
6/1/2028 $44.94 $10.90 $9.75 $6.60 $0.00 $72.19
LABORER: MASON TENDER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $46.44 $10.90 $9.75 $6.60 $0.00 $73.69
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.25 $10.90 $9.75 $6.60 $0.00 $64.50LABORER: MASON TENDER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.54 $10.90 $9.75 $6.60 $0.00 $65.79
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $36.22 $10.90 $9.75 $6.60 $0.00 $63.47
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.04 $10.90 $9.75 $6.60 $0.00 $67.29
12/1/2027 $41.44 $10.90 $9.75 $6.60 $0.00 $68.69
6/1/2028 $42.94 $10.90 $9.75 $6.60 $0.00 $70.19
LABORER: MULTI-TRADE TENDER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 90.00 $34.46 $10.90 $9.75 $6.60 $0.00 $61.71
Page 16 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
12/1/2028 $44.44 $10.90 $9.75 $6.60 $0.00 $71.69
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.22 $10.90 $9.75 $6.60 $0.00 $63.47
12/1/2026 $38.64 $10.90 $9.75 $6.60 $0.00 $65.89
6/1/2027 $40.04 $10.90 $9.75 $6.60 $0.00 $67.29
12/1/2027 $41.44 $10.90 $9.75 $6.60 $0.00 $68.69
6/1/2028 $42.94 $10.90 $9.75 $6.60 $0.00 $70.19
LABORER: TREE REMOVER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $44.44 $10.90 $9.75 $6.60 $0.00 $71.69
This classification applies to the removal of standing trees, and the trimming and removal of branches and limbs when related to public works construction or site clearance incidental to construction . For apprentice rates see "Apprentice- LABORER"
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
LASER BEAM OPERATOR
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.25 $10.90 $9.75 $6.60 $0.00 $64.50LASER BEAM OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.54 $10.90 $9.75 $6.60 $0.00 $65.79
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
8/1/2026 $47.05 $12.84 $15.10 $5.68 $0.00 $80.67MARBLE & TILE FINISHERS
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (SPR/PITT) - MARBLE & TILE
2/1/2027 $48.17 $12.84 $15.10 $5.68 $0.00 $81.79
Apprentice: MARBLE & TILE FINISHERS
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $23.53 $12.84 $15.10 $5.41 $0.00 $56.88
2 60.00 $28.23 $12.84 $15.10 $5.41 $0.00 $61.58
3 70.00 $32.94 $12.84 $15.10 $5.41 $0.00 $66.29
4 80.00 $37.64 $12.84 $15.10 $5.41 $0.00 $70.99
5 90.00 $42.35 $12.84 $15.10 $5.41 $0.00 $75.70
Apprentice: MARBLE & TILE FINISHERS
Effective Date: 2/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.09 $12.84 $15.10 $5.68 $0.00 $57.71
2 60.00 $28.90 $12.84 $15.10 $5.68 $0.00 $62.52
3 70.00 $33.72 $12.84 $15.10 $5.68 $0.00 $67.34
4 80.00 $38.54 $12.84 $15.10 $5.68 $0.00 $72.16
5 90.00 $43.35 $12.84 $15.10 $5.68 $0.00 $76.97
Page 17 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
MILLWRIGHT (Zone 3)
MILLWRIGHTS LOCAL 1121
MILLWRIGHTS LOCAL 1121 - Zone 3
1/5/2026 $45.20 $10.58 $11.47 $9.75 $0.00 $77.00
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
MORTAR MIXER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $47.55 $14.80 $12.50 $3.50 $0.00 $78.35
12/1/2026 $49.51 $14.80 $12.50 $3.50 $0.00 $80.31
6/1/2027 $51.16 $14.80 $12.50 $3.50 $0.00 $81.96
Operating Engineers 98 - Classification 1
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $52.80 $14.80 $12.50 $3.50 $0.00 $83.60
Bulldozer; Shovels; Backhoe; Combination Backhoe Loader 3/4 yd & Over; Grader; Trenching Machine; Front End Loader over 5.5 yds; Automatic Grader-Excavator, Micro Pile
& Other Pile Driving Machine; Geothermal Drill; John Henry Rock Drill; Horizontal Drilling Machine; Concrete Pump with Boom.
Apprentice to Journeyworker Ratio: 1:5
Apprentice: MILLWRIGHT (Zone 3)
Effective Date: 1/5/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $24.86 $10.58 $0.00 $5.36 $0.00 $40.80
2 65.00 $29.38 $10.58 $0.00 $6.34 $0.00 $46.30
3 75.00 $33.90 $10.58 $11.47 $7.31 $0.00 $63.26
4 85.00 $38.42 $10.58 $11.47 $8.29 $0.00 $68.76
Apprentice Notes
Step 1&2 Appr. indentured after 1/6/2020 receive no pension, Apprentice to Journeyworker Ratio: 1:4
Apprentice: Operating Engineers 98 - Classification 1
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $28.53 $14.80 $12.50 $3.50 $0.00 $59.33
2 70.00 $33.29 $14.80 $12.50 $3.50 $0.00 $64.09
3 80.00 $38.04 $14.80 $12.50 $3.50 $0.00 $68.84
4 90.00 $42.80 $14.80 $12.50 $3.50 $0.00 $73.60
Page 18 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $51.05 $14.80 $12.50 $3.50 $0.00 $81.85
12/1/2026 $53.01 $14.80 $12.50 $3.50 $0.00 $83.81
6/1/2027 $54.66 $14.80 $12.50 $3.50 $0.00 $85.46
Operating Engineers 98 - Classification 10
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $56.30 $14.80 $12.50 $3.50 $0.00 $87.10
Crawler & Truck Crane; Dragline; Derrick; Clamshell; Tower Crane; Self-Propelled Hydraulic Crane; Boom Truck.
6/1/2026 $47.24 $14.80 $12.50 $3.50 $0.00 $78.04
12/1/2026 $49.20 $14.80 $12.50 $3.50 $0.00 $80.00
6/1/2027 $50.85 $14.80 $12.50 $3.50 $0.00 $81.65
Operating Engineers 98 - Classification 2
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $52.49 $14.80 $12.50 $3.50 $0.00 $83.29
Front End Loader 4 - 5.5 yds; Scraper over 21 yds; Sonic & Vibratory Hammers; Mechanic; Forklift over 3 ton; Asphalt Paver; Transfer Machine; Road Planer / Milling Machine.
6/1/2026 $47.02 $14.80 $12.50 $3.50 $0.00 $77.82
12/1/2026 $48.98 $14.80 $12.50 $3.50 $0.00 $79.78
6/1/2027 $50.63 $14.80 $12.50 $3.50 $0.00 $81.43
Operating Engineers 98 - Classification 3
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $52.27 $14.80 $12.50 $3.50 $0.00 $83.07
Scraper up to 21 yds; Front End Loader up to 4 yds; Pumpcrete Machine; Concrete Batch Plant on Site; Grout Pumps; Well Point Operator; Hydro-Vac Truck; Grease Truck.
6/1/2026 $46.41 $14.80 $12.50 $3.50 $0.00 $77.21
12/1/2026 $48.37 $14.80 $12.50 $3.50 $0.00 $79.17
6/1/2027 $50.02 $14.80 $12.50 $3.50 $0.00 $80.82
Operating Engineers 98 - Classification 3A
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $51.66 $14.80 $12.50 $3.50 $0.00 $82.46
Asphalt Roller; Self-Powered Rollers & Compactors; Tractors; York Rakes.
6/1/2026 $43.79 $14.80 $12.50 $3.50 $0.00 $74.59
12/1/2026 $45.75 $14.80 $12.50 $3.50 $0.00 $76.55
6/1/2027 $47.40 $14.80 $12.50 $3.50 $0.00 $78.20
Operating Engineers 98 - Classification 4
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $49.04 $14.80 $12.50 $3.50 $0.00 $79.84
Hoists; Conveyors; Power Pavement Breaker; Power Broom; Generators over 30 KW.
6/1/2026 $42.67 $14.80 $12.50 $3.50 $0.00 $73.47
12/1/2026 $44.63 $14.80 $12.50 $3.50 $0.00 $75.43
6/1/2027 $46.28 $14.80 $12.50 $3.50 $0.00 $77.08
Operating Engineers 98 - Classification 5
OPERATING ENGINEERS LOCAL 98
OPERATING ENGINEERS LOCAL 98
12/1/2027 $47.92 $14.80 $12.50 $3.50 $0.00 $78.72
Compressor (315 to 900 cu ft.); Pumps (4 - 6 in. discharge).
PAINTER (BRIDGES/TANKS)
PAINTERS LOCAL 35
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
Apprentice: Operating Engineers 98 - Classification 1
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $29.71 $14.80 $12.50 $3.50 $0.00 $60.51
2 70.00 $34.66 $14.80 $12.50 $3.50 $0.00 $65.46
3 80.00 $39.61 $14.80 $12.50 $3.50 $0.00 $70.41
4 90.00 $44.56 $14.80 $12.50 $3.50 $0.00 $75.36
Apprentice to Journeyworker Ratio: 1:6
Page 19 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
PAINTERS LOCAL 35 - ZONE 3
PAINTER (SPRAY OR SANDBLAST, NEW) *
* If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 3
1/1/2026 $42.03 $10.35 $12.00 $8.35 $0.00 $72.73
PAINTER (SPRAY OR SANDBLAST, REPAINT)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 3
1/1/2026 $39.35 $10.35 $12.00 $8.35 $0.00 $70.05
Apprentice: PAINTER (BRIDGES/TANKS)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Apprentice: PAINTER (SPRAY OR SANDBLAST, NEW) *
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $21.02 $10.35 $0.00 $0.00 $0.00 $31.37
2 55.00 $23.12 $10.35 $0.00 $4.59 $0.00 $38.06
3 60.00 $25.22 $10.35 $0.00 $5.01 $0.00 $40.58
4 65.00 $27.32 $10.35 $0.00 $5.43 $0.00 $43.10
5 70.00 $29.42 $10.35 $12.00 $5.85 $0.00 $57.62
6 75.00 $31.52 $10.35 $12.00 $6.26 $0.00 $60.13
7 80.00 $33.62 $10.35 $12.00 $6.68 $0.00 $62.65
8 90.00 $37.83 $10.35 $12.00 $7.52 $0.00 $67.70
Apprentice to Journeyworker Ratio: 1:1
Apprentice: PAINTER (SPRAY OR SANDBLAST, REPAINT)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $19.68 $10.35 $0.00 $0.00 $0.00 $30.03
2 55.00 $21.64 $10.35 $0.00 $4.59 $0.00 $36.58
Page 20 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
PAINTER / TAPER (BRUSH, NEW) *
* If 30% or more of surfaces to be painted are new construction, NEW paint rate shall be used.
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 3
1/1/2026 $40.63 $10.35 $12.00 $8.35 $0.00 $71.33
PAINTER / TAPER (BRUSH, REPAINT)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 3
1/1/2026 $37.95 $10.35 $12.00 $8.35 $0.00 $68.65
Apprentice: PAINTER (SPRAY OR SANDBLAST, REPAINT)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
3 60.00 $23.61 $10.35 $0.00 $5.01 $0.00 $38.97
4 65.00 $25.58 $10.35 $0.00 $5.43 $0.00 $41.36
5 70.00 $27.55 $10.35 $12.00 $5.85 $0.00 $55.75
6 75.00 $29.51 $10.35 $12.00 $6.26 $0.00 $58.12
7 80.00 $31.48 $10.35 $12.00 $6.68 $0.00 $60.51
8 90.00 $35.42 $10.35 $12.00 $7.52 $0.00 $65.29
Apprentice to Journeyworker Ratio: 1:1
Apprentice: PAINTER / TAPER (BRUSH, NEW) *
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $20.32 $10.35 $0.00 $0.00 $0.00 $30.67
2 55.00 $22.35 $10.35 $0.00 $4.59 $0.00 $37.29
3 60.00 $24.38 $10.35 $0.00 $5.01 $0.00 $39.74
4 65.00 $26.41 $10.35 $0.00 $5.43 $0.00 $42.19
5 70.00 $28.44 $10.35 $12.00 $5.85 $0.00 $56.64
6 75.00 $30.47 $10.35 $12.00 $6.26 $0.00 $59.08
7 80.00 $32.50 $10.35 $12.00 $6.68 $0.00 $61.53
8 90.00 $36.57 $10.35 $12.00 $7.52 $0.00 $66.44
Apprentice to Journeyworker Ratio: 1:1
Apprentice: PAINTER / TAPER (BRUSH, REPAINT)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $18.98 $10.35 $0.00 $0.00 $0.00 $29.33
2 55.00 $20.87 $10.35 $0.00 $4.59 $0.00 $35.81
3 60.00 $22.77 $10.35 $0.00 $5.01 $0.00 $38.13
4 65.00 $24.67 $10.35 $0.00 $5.43 $0.00 $40.45
5 70.00 $26.57 $10.35 $12.00 $5.85 $0.00 $54.77
6 75.00 $28.46 $10.35 $12.00 $6.26 $0.00 $57.07
Page 21 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
6/1/2026 $37.00 $10.90 $9.75 $6.60 $0.00 $64.25PAINTER TRAFFIC MARKINGS (HEAVY/HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.29 $10.90 $9.75 $6.60 $0.00 $65.54
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $41.78 $16.17 $21.78 $0.00 $0.00 $79.73
12/1/2026 $41.78 $16.17 $23.52 $0.00 $0.00 $81.47
PANEL & PICKUP TRUCKS DRIVER
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.78 $16.77 $23.52 $0.00 $0.00 $82.07
PIER AND DOCK CONSTRUCTOR (UNDERPINNING AND
DECK)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $49.19 $10.08 $11.62 $12.67 $0.00 $83.56
For apprentice rates see "Apprentice- PILE DRIVER"
PILE DRIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 3)
8/1/2024 $49.19 $10.08 $11.62 $12.67 $0.00 $83.56
6/1/2026 $36.47 $10.90 $9.75 $6.60 $0.00 $63.72
12/1/2026 $38.89 $10.90 $9.75 $6.60 $0.00 $66.14
6/1/2027 $40.29 $10.90 $9.75 $6.60 $0.00 $67.54
12/1/2027 $41.69 $10.90 $9.75 $6.60 $0.00 $68.94
6/1/2028 $43.19 $10.90 $9.75 $6.60 $0.00 $70.44
PIPELAYER
LABORERS
LABORERS - ZONE 4 (BUILDING & SITE)
12/1/2028 $47.26 $9.90 $9.25 $5.53 $0.00 $71.94
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $37.25 $10.90 $9.75 $6.60 $0.00 $64.50PIPELAYER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 4 (HEAVY & HIGHWAY)
12/1/2026 $38.54 $10.90 $9.75 $6.60 $0.00 $65.79
Apprentice: PAINTER / TAPER (BRUSH, REPAINT)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
7 80.00 $30.36 $10.35 $12.00 $6.68 $0.00 $59.39
8 90.00 $34.16 $10.35 $12.00 $7.52 $0.00 $64.03
Apprentice to Journeyworker Ratio: 1:1
Apprentice: PILE DRIVER
Effective Date: 8/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.14 $10.08 $0.00 $2.53 $0.00 $34.75
2 55.00 $27.05 $10.08 $0.00 $5.07 $0.00 $42.20
3 70.00 $34.43 $10.08 $11.62 $7.60 $0.00 $63.73
4 80.00 $39.35 $10.08 $11.62 $10.14 $0.00 $71.19
Page 22 of 30Wage Request Number: 20261021131936Issue Date: 10/22/2026
Supplemental
Unemployment Total Rate
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
9/17/2026 $54.26 $13.85 $10.85 $7.10 $0.00 $86.06
3/17/2027 $56.26 $13.85 $10.85 $7.10 $0.00 $88.06
9/17/2027 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
3/17/2028 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
9/17/2028 $64.26 $13.85 $10.85 $7.10 $0.00 $96.06
PLUMBER & PIPEFITTER
PLUMBERS & PIPEFITTERS LOCAL 104
PLUMBERS & PIPEFITTERS LOCAL 104
3/17/2029 $64.26 $13.85 $10.85 $7.10 $0.00 $96.06
9/17/2026 $54.26 $13.85 $10.85 $7.10 $0.00 $86.06
3/17/2027 $56.26 $13.85 $10.85 $7.10 $0.00 $88.06
9/17/2027 $60.26 $13.85 $10.85 $7.10 $0.00 $92.06
3/17/2028 $62.26 $13.85 $10.85 $7.10 $0.00 $94.06
PNEUMATIC CONTROLS (TEMP.)
PLUMBERS & PIPEFITTERS LOCAL 104
PLUMBERS & PIPEFITTERS LOCAL 104
Apprentice: PLUMBER & PIPEFITTER
Effective Date: 9/17/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $24.42 $13.85 $10.85 $0.00 $0.00 $49.12
2 50.00 $27.13 $13.85 $10.85 $0.00 $0.00 $51.83
3 55.00 $29.84 $13.85 $10.85 $0.00 $0.00 $54.54
4 60.00 $32.56 $13.85 $10.85 $0.00 $0.00 $57.26
5 65.00 $35.27 $13.85 $10.85 $0.00 $0.00 $59.97
6 70.00 $37.98 $13.85 $10.85 $0.00 $0.00 $62.68
7 75.00 $40.70 $13.85 $10.85 $0.00 $0.00 $65.40
8 80.00 $43.41 $13.85 $10.85 $0.00 $0.00 $68.11
9 85.00 $46.12 $13.85 $10.85 $7.10 $0.00 $77.92
10 85.00 $46.12 $13.85 $10.85 $7.10 $0.00 $77.92
Apprentice: PLUMBER & PIPEFITTER
Effective Date: 3/17/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $25.32 $13.85 $10.85 $0.00 $0.00 $50.02
2 50.00 $28.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .