Shady MS Bldg 02 Fire Protection Installation REBID

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00009217
State
Oregon
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is seeking a contractor for the Shady MS Bldg 02 Fire Protection Installation REBID project located in Douglas County, Oregon. The procurement involves the installation of a fire protection system in the north end of the Shady Maintenance Station Building 2, a 1984-era open bay steel framed structure situated at 3339 Old Highway 99 in Roseburg. The project covers approximately 4,800 square feet, including 250 square feet of interior office space, and requires comprehensive fire protection system implementation. Key deliverables include system design, installation, and coordination with adjacent project areas, with specific requirements for ceiling demolition and replacement where sprinklers are installed. The project has a substantial completion date of May 17, 2024, and a final completion date of August 2, 2024. A voluntary pre-quote conference was held on January 30, 2024, and quotes must be submitted through the OregonBuys eProcurement system. Contractors must be licensed with the Oregon Construction Contractors Board and comply with prevailing wage rate standards.

The contract opportunity does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises, though ODOT indicates a commitment to promoting diversity, equity, and inclusion. Preliminary bid results show H3 Contractors from Roseburg, OR submitted a total project cost of $142,071.00, which provides an indication of the potential contract value. The contractor must provide various insurance coverages, including commercial general liability with $1 million per occurrence and $2 million annual aggregate limits, and commercial automobile liability with a $1 million combined single limit. Performance and payment bonds are required if the contract price exceeds $100,000. Subcontractors performing construction work must be registered with the Oregon Construction Contractors Board or licensed by the Oregon State Landscape Contractors Board. The contract includes liquidated damages of $300 per calendar day for delays in achieving Substantial Completion, and requires contractors to have a policy preventing sexual harassment, sexual assault, and discrimination, as well as a qualifying drug testing program for employees.

Opportunity text

Project consists of the installation of a fire protection system in the north end of the ODOT Shady Maintenance Station Building 2, located at 3339 Old Highway 99, Roseburg, Oregon.

Files

File Type Posted
Prebid meeting sign in sheet.pdf PDF
Preliminary Results posted.xlsx XLSX spreadsheet
Reference Drawings Shady Crew Room Remodel.pdf PDF
240130_Question and Answers.docx DOCX document
35909 RFCQ.docx DOCX document
ADD 1 ODOT Shady Maintenance Station Install Fire Protection System.docx DOCX document
Exhibit A Plans.pdf PDF
Exhibit B Specifications.pdf PDF
Reference Drawings Exisiting Shady_Shop_1984.pdf PDF
35909 Attachments.docx DOCX document
ADD 1 SHADY MS FIRE PROTECTION_ PLAN A101 REV1 012524.pdf PDF
AttE_COBID_CoachingSrvcs_Intproc~1.docx DOCX document
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity