Preliminary Results posted.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- S-73000-00009217
- Issued by
- Douglas County, Oregon
About this file
The document provided is a Preliminary Results posted.xlsx file related to an Oregon Department of Transportation (ODOT) contract opportunity for the Shady MS Bldg 02 Fire Protection Installation REBID project located in Douglas County, Oregon. The project consists of the installation of a fire protection system in the north end of the ODOT Shady Maintenance Station Building 2. The preliminary bid results show that H3 Contractors from Roseburg, OR submitted a total project cost of $142,071.00 for this project.
The pricing information indicates the bid items and their associated unit prices and total costs. The document states that the preliminary results are not an indicator of the award, meaning the contract has not yet been awarded. No additional details are provided regarding the response due dates, bid submission requirements, site visits, or the contract term.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AttE_COBID_CoachingSrvcs_Intproc~1.docx | DOCX document | |
| 240130_Question and Answers.docx | DOCX document | |
| 35909 Attachments.docx | DOCX document | |
| Reference Drawings Shady Crew Room Remodel.pdf | ||
| Prebid meeting sign in sheet.pdf | ||
| Reference Drawings Exisiting Shady_Shop_1984.pdf | ||
| Exhibit B Specifications.pdf | ||
| 35909 RFCQ.docx | DOCX document | |
| Exhibit A Plans.pdf | ||
| ADD 1 ODOT Shady Maintenance Station Install Fire Protection System.docx | DOCX document | |
| ADD 1 SHADY MS FIRE PROTECTION_ PLAN A101 REV1 012524.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ODOT BID ITEMS
| PRELIMINARY RESULTS Shady MS Bldg 02 Fire Protection Installation REBID S-73000-00009217 | |||||
| Bidder name: | H3 Contractors Roseburg, OR | ||||
| City, State: | |||||
| QTY | UNIT | Unit Price | Total Price | ||
| 1 | Total Project Cost | 1 | LS | $142,071.00 | $142,071.00 |
| TOTAL | $142,071.00 | ||||
| Preliminary results are not an indicator of Award. |