About this file

This document is an addendum to a state and local contract opportunity for the installation of a fire protection system in the ODOT Shady Maintenance Station Building 2 located in Roseburg, Oregon. The addendum clarifies that any sprinkler installed in a space with a hard ceiling will require the ceiling to be demolished and then replaced to match the existing material and finish. It also states that ODOT electricians will provide any necessary electrical materials and labor, and that the fire protection system is a performance specification. The contract opportunity is being rebid, and the project consists of the installation of a fire protection system in the north end of the ODOT Shady Maintenance Station Building 2.

The contract opportunity is for the Douglas County jurisdiction in Oregon. No additional details are provided regarding pricing terms, set asides, incumbents, funding requirements and sources, or other salient information.

View the file

Other files

File Type Posted
AttE_COBID_CoachingSrvcs_Intproc~1.docx DOCX document
240130_Question and Answers.docx DOCX document
35909 Attachments.docx DOCX document
Preliminary Results posted.xlsx XLSX spreadsheet
Reference Drawings Shady Crew Room Remodel.pdf PDF
Prebid meeting sign in sheet.pdf PDF
Reference Drawings Exisiting Shady_Shop_1984.pdf PDF
Exhibit B Specifications.pdf PDF
35909 RFCQ.docx DOCX document
Exhibit A Plans.pdf PDF
ADD 1 SHADY MS FIRE PROTECTION_ PLAN A101 REV1 012524.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ODOT Shady Maintenance Station Install Fire Protection System - ADDENDUM 1 January 25, 2024

1. Section 211313 3.5 addresses sprinkler applications. To be clear, any sprinkler in a space with a hard ceiling, i.e. gypsum board, the ceiling will be demoed as needed to conceal piping and then replaced to match existing material and finish. See revised sheet A101.

1. ODOT electricians will provide any electrical materials and labor as needed.

1. Fire protection system is a performance specification.

Replace sheet A101 with A101 Rev. 1 dated 1/25/2024 (Add note 6).

End of Addendum 1.