SCADA Radio Replacement Project

Closed State & local contract opportunity

Solicitation number
RFP No. WT-0015
State
California
Responses due

Opportunity facts

NIGP codes
UNSPSC codes
Show all 28
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The Santa Cruz County and San Francisco City are seeking a comprehensive SCADA Radio Replacement Project through RFP No. WT-0015, with proposals due on October 12, 2023. The procurement involves a complete radio network design and upgrade for the City Water Department, requiring a detailed desktop radio study and field survey to validate findings. Deliverables include radio telemetry network design, replacement of the existing SCADA radio network, relocation of the base radio tower, evaluation and potential reuse of existing equipment, configuration and testing of the new radio network, and full project management. Contractors must maintain uninterrupted water conveyance, treatment, and distribution operations throughout the installation process. Key qualifications include holding a valid California Contractor's General Engineering License "A" and ensuring all subcontractors have appropriate trade licenses. The project is scheduled to commence in Fall 2023 and must be completed within one year of the Notice to Proceed.

Bidders must make good faith efforts to hire qualified individuals from Santa Cruz County and employ apprentices enrolled in Division of Apprenticeship Standards-approved programs. The contract has specific labor code requirements, particularly for prevailing wage compliance under Labor Code section 1720. The estimated contract value is $250,000, with progress payments subject to a 5% retention withholding until 35 calendar days after recording the notice of completion. Contractors have the option to substitute securities or deposit retained earnings in an escrow account per California Public Contract Code Section 22300. The procurement appears to be open to general engineering contractors with specific licensing and local hiring requirements, with a preference for local workforce participation. No incumbent vendors were specifically identified in the documentation, and the project focuses on upgrading existing water department communication infrastructure.

Opportunity text

The Proposer shall furnish all tools, equipment, materials, tax, apparatus, facilities, labor, transportation, supervision, and management, not specifically provided by the City, to complete work described in this RFP. The Proposer shall provide a viable radio network design including a desktop radio study and a field survey to validate the findings of the radio study. Upon approval of the design, the contractor shall furnish all tools, equipment, materials, tax, apparatus, facilities, labor, transportation, supervision, and management, not specifically provided by the City, to complete work described in this RFP. The successful Proposer will provide the programming, installation, and testing of a SCADA radio system detailed in Section 4 Preliminary Scope of Services and according to the Terms and Conditions as stated in Section 3 Terms and Conditions.

The basic components of the services sought by the City include the following:

  • Radio Telemetry Network Design;
  • Radio desktop study including all City Water Department Sites;
  • Radio Field Survey to validate desktop study and follow up report;
  • Replacement of existing SCADA radio network;
  • Relocation of the existing SCADA Base Radio Tower;
  • Evaluation of all materials, devices, enclosures, antennas, cabling, and appurtenances for re-use;
  • Replacement or reuse of all associated enclosures, antenna, cabling, and appurtenances;
  • Configuration and testing of the newly installed radio network;
  • Managing the inventory of equipment provided by the City during the course of the project;
  • Coordination, scheduling, communications, and documentation of all services; and
  • Project management to ensure all products and services are coordinated.

The City must maintain and operate the water conveyance, treatment, and distribution operations uninterrupted (24/7/365) during installation and implementation of the SCADA radio upgrades. The project will commence in Fall 2023 and must be completed within 1 year of the issuance of the Notice to Proceed.

Estimated Contract Cost: $250,000.00

To the extent that the work or services to be performed under this Agreement may be considered a "public work" pursuant and subject to Labor Code section 1720 et seq., Contractor (and any subcontractor performing the work or services) shall conform to any and all prevailing wage and DIR requirements applicable to such work/and or services under this Agreement. Additionally, the General Contractor and all Subcontractors must make good faith efforts to hire qualified individuals who are residents of Santa Cruz County as required by Santa Cruz Municipal Code (SCMC) Chapter 3.10, and to employ apprentices who are enrolled and participate in a viable apprenticeship program approved by the Division of Apprenticeship Standards.

Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the Project, as specified in the Contract Documents. Bidders bidding as the Prime Contractor shall possess a valid California Contractor's General Engineering License "A" at the time of contract bid and throughout the contract term until Notice of Final Acceptance has been issued. The Contractor will also be required to ensure that all subcontractors working on this Project are holding valid licenses suitable for their trade throughout the contract term until Notice of Final Acceptance has been issued. Failure to possess the specified license at the time the bid is submitted shall render the bid non-responsive.

Progress payments are subject to 5% retention withholding until thirty-five (35) calendar days after recording the notice of completion. Pursuant to California Public Contract Code Section 22300, for monies earned by the General Contractor and withheld by the City to ensure the performance of the Contract. The General Contractor, may, at its option, choose to substitute securities meeting the requirements of California Public Contract Code Section 22300, or have the retained, earned monies deposited in an escrow account at a federal or state-chartered bank.