RFQ-DB 39256 C-1 Canal Treatment Project
Closed State & local contract opportunity Posted
- Solicitation number
- RFSQ-07546
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 78587 Resource Books And Materials (Not Otherwise Classified)
- 96273 Restoration/Reclamation Services Of Land And Other Properties
- 98814 Erosion Control Services
- 92641 Ecosystems Development, Management And Protection Services
- 92695 Water/Wastewater Conservation Services
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 60104200 Water testing and conservation and ecology
- 70131502 Soil conservation or protection services
- 70161706 Coastal ecology and conservation service
- 70161708 Conservation and management of freshwater ponds and lakes and rivers and streams
- 70171604 Water conservation advisory services
- 81101527 Wastewater engineering
- 81102900 Cultural conservation-restoration engineering services
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The St. Johns River Water Management District in Florida is seeking qualifications for a Design-Build contract for the C-1 Canal Baseflow Treatment Project, a pilot project to pump water from the C-1 Canal into an innovative media-based treatment system to remove nutrients and then discharge the treated water downstream. The project, which will be sited adjacent to the MS-1 structure, includes design, construction, operation, monitoring, and demobilization of the treatment system over a two-year period. Key deliverables include meeting specific nutrient removal targets and water quality standards. The procurement process consists of two steps - the submission of Qualifications Submittals, followed by the submission of Technical and Price Proposals from the most highly qualified respondents. Key dates include a pre-submittal conference on January 12, 2024, Qualifications Submittal due on January 30, 2024, and Technical and Price Proposal due on March 5, 2024. The total project estimate is $1,500,000, but the District reserves the right to adjust the estimate and reject proposals that exceed it.
The District is committed to providing opportunities for diversity in its procurement activities and encourages vendors to make a good faith effort to include women and minority-owned businesses as subconsultants. The procurement process is subject to Florida's Consultants' Competitive Negotiation Act and the District's protest procedures. There are no set-aside designations or restrictions on the types of organizations that can respond, and there is no information provided on any incumbent vendors or current contractors.
Opportunity text
The C-1 Canal Baseflow Treatment project is a pilot project for one of the full-scale concepts identified in the 2017 Indian River Lagoon (IRL) Stormwater Capture and Treatment Feasibility Analysis. This pilot project (the Project) involves pumping water from C-1 Canal into an innovative media-based treatment system to remove nutrients and then discharging the treated water downstream. The Project will be sited adjacent to the MS-1 structure. In addition to design and construction, the Project includes operation,
monitoring, and demobilization of the treatment system. Additional project information including the signed and sealed design criteria package prepared by the District's Design Criteria Professional can be found in Attachment A of the sample contract included with this solicitation.