RFP2027-01 - HVAC City of Duluth

Open State & local contract opportunity Posted

Solicitation number
PE-66750-NONST-2027-000000030
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Duluth, Georgia, is soliciting sealed proposals under RFP2027-01 for replacement of a basement air handling unit and a full HVAC controls upgrade at Duluth City Hall, 3167 Main Street, with a mandatory pre-submittal meeting on December 10, 2026 at 10:00 a.m. Attendance is required for all bidders, and that meeting is the only opportunity for site visits before submission.

Task I removes the existing basement AHU and installs a new 15-ton unit with VAV controls, dehumidification, and an economizer with powered exhaust, integrated with existing electrical and low-voltage controls. Task II replaces the obsolete Carrier Control Network system with a new open-source building automation system controlling five air handling/rooftop units, 57 VAV units, and one exhaust fan. The contractor must provide a complete DDC system with full BACnet communication, password-protected web access, and operator access from desktop, portable, wireless, and remote connections. The contractor must analyze existing sequences of operation and submit a complete list before demolition. Work must conform to the 2024 International Building, Mechanical, Fire, and Fuel Gas Codes and the 2015 International Energy Conservation Code. An independent commissioning authority manages commissioning. Warranty runs two years on components and three years on gateway equipment from substantial completion.

Contractors must have operated under their current corporate name for at least five years, maintain permanent business operations, show no defaults or bankruptcies in the past ten years, and provide at least two project management personnel with five years' experience on similar projects, including a full-time on-site project superintendent.

Bid bonds equal 5 percent of the total base bid at submission. Successful bidders must provide performance and payment bonds at 100 percent of the contract amount. Liquidated damages are $500 per calendar day for delays beyond the agreed completion date. Work must commence within ten calendar days of Notice to Proceed, and retainage is withheld from monthly progress payments.

Proposals are scored on a 100-point scale: total bid cost up to 65 points, project schedule up to 25 points, and resumes and references up to 10 points, following a completeness check.

Questions are due December 17, 2026 at 5:00 p.m., with answers issued by addendum by January 7, 2027. Sealed proposals are due 11:00 a.m. January 27, 2027 to Teresa Lynn, City Clerk, with public opening at 11:01 a.m. the same day at Duluth City Hall. Submit one original, two copies, and one digital version on a flash drive in a sealed package. The 95% design submittal prepared by Pond & Company is attached. The RFP posted November 17, 2026.

Opportunity text

The City of Duluth will receive proposals from contractors for the following scope of work: Task I) Remove existing basement AHU and replace with new 15-ton AHU including necessary VAV Controls, dehumidification, economizer with powered exhaust, connect existing electrical and low voltage controls, integrate into the control system outlined in Task II. Task II) Replacement of HVAC Controls. The existing Carrier DDC controls (Carrier Control Network) for the Duluth City Hall have been found to be obsolete and failing from a mechanical standpoint. A new open-source BAS (Building Automation System) will be required to replace the existing Carrier CNN system. The project involves a full upgrade of the controls system of the Duluth City Hall HVAC system. This scope includes the following: (5) air handling/rooftop units, (57) associated VAV units, and (1) exhaust fan. Any additional units are to be considered existing to remain and controlled locally. Specified units are to be provided with updated controls and tied into the new open-source DDC system. The new front end must contain the same information and functionality as the existing equipment including, but not limited to, equipment status, mode of operation, setpoints, airflow, temperatures, occupancy, and alarms.