This is a Request for Proposal (RFP) document from the City of Duluth, Georgia, for HVAC mechanical controls installation and system upgrades at 3167 Main Street, Duluth, GA 30096. The project involves replacing the existing Carrier CNN (Carrier Control Network) building automation system with a new open-source Building Automation System (BAS), and providing updated controls for all HVAC equipment including rooftop units (RTU-1 through RTU-4), an air handling unit (AHU-1) in the basement, terminal air units (T-B-1 through T-B-7, T-1-1 through T-1-15, T-2-1 through T-2-21, and T-3-1 through T-3-14), a condensing unit (CU-1), and an exhaust fan (EF-1) distributed across basement, three floors, and roof levels. The project is located in Gwinnett County, Georgia, with design conditions specified for the region, and all equipment must conform to 2024 International Building, Mechanical, Fire, and Fuel Gas Codes as well as the 2015 International Energy Conservation Code. The contractor must analyze existing system sequences of operation and submit a complete list prior to demolition work to ensure new controls replicate existing functionality.

The scope requires the contractor to provide a complete DDC (Direct Digital Controls) system with full BACnet communication protocol, web-based access with password protection, and integration of all equipment with updated control interfaces and start/stop controls. The system must support multiple operator access methods including desktop workstations, portable terminals, wireless connections, and remote web access. All new thermostats shall be provided in existing locations unless specifically noted for relocation, with at least one thermostat (serving unit T-1-9) requiring relocation from room 11.24 to 11.30 as coordinated with the owner. The contractor must supply DDC system manufacturer and provider qualifications, provide comprehensive operations and maintenance manuals, and include a two-year warranty on all components (three years for gateway equipment) from substantial completion. A commissioning process managed by an independent commissioning authority (CXA) is required, including construction checklists, functional performance testing, system verification checklists, and owner training, with the contractor responsible for all permits, inspections, and compliance with local jurisdictional requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET NAMING CONVENTION

aX-001A

2 DIGIT SEQUENTIAL # (01-99)

1 DIGIT SHEET TYPE DESIGNATOR

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - ENLARGED PLANS

5 - DETAILS

6 - VARIES

7 - VARIES

8 - SPECIFICATIONS

9 - 3D VIEWS

2 DIGIT DISCIPLINE

DESIGNATOR

(IF ONLY ONE LETTER IS

USED, THE SECOND LETTER

IS REPLACED WITH A DASH

"-" AS A PLACEHOLDER)**

OPTIONAL: 1 DIGIT AREA

DESIGNATOR

(AREA DESIGNATOR ONLY

USED WHEN PLANS ARE

SUBDIVIDED INTO AREAS.)OPTIONAL : 1 DIGIT

BUILDING / SITE

DESIGNATOR (USE NUMBER

FOR LESS THAN 9)

MECHANICAL GENERAL NOTES:

1. COORDINATE INSTALLATION OF HVAC WORK MUST WITH OTHER TRADES BEFORE ANY INSTALLATION IS MADE. PLANS ARE

DIAGRAMMATIC IN NATURE. PROVIDE ALL TRANSITIONS, ELBOWS, ETC. REQUIRED TO AVOID CONFLICTS WITH OTHER TRADES AND BUILDING ELEMENTS. EQUIPMENT, PIPING, OR DUCTWORK INTERFERING WITH OTHER TRADES MUST BE RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER. DO NOT SCALE THE DRAWINGS.

2. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.

3. "PROVIDE" IS AN INCLUSIVE TERM USED TO DESCRIBE ASPECTS OF THE WORK THAT MUST BE ACCOMPLISHED AND IS HEREBY DEFINED TO REQUIRE TO STORE, FURNISH, INSTALL, MOUNT, CONNECT, CONTROL AND POWER EQUIPMENT INDICATED, AS WELL AS ALL APPURTENANCES REQUIRED TO MAKE SYSTEMS OPERATE AS INDICATED WITHIN THESE

DRAWINGS AND SPECIFICATIONS AND TO FULFILL THE SCOPE OF WORK.

4. NOT ALL MECHANICAL ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.

5. THE MECHANICAL EQUIPMENT AND INSTALLATION MUST CONFORM TO THE CODE REFERENCES TABLE SHOWN HEREIN.

6. AT THE START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE TO BE SUPPLIED THAT ARE ALSO REQUIRING ELECTRICAL WORK AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.

7. WRITTEN DIMENSIONS ON DRAWINGS HAVE PRECEDENCE OVER SCALED DIMENSIONS.

8. INSTALL CONTROL WIRING IN CONDUIT. SEE DIVISION 26 FOR REQUIREMENTS.

9. COORDINATE MECHANICAL AND ELECTRICAL WORK SUCH THAT MECHANICAL PIPING, DUCTWORK AND EQUIPMENT IS NOT

LOCATED OVER OR ABOVE ANY ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT.

10. VARIABLE FREQUENCY DRIVES FOR 3 PHASE MOTORS MUST BE 3 POLE TYPE.

11. CONTROL WIRING (I.E. 120 VOLT AND BELOW) INCLUDING 120 VOLT CONTROL POWER TO MOTOR OPERATED DAMPERS, VALVES, AND VARIABLE VOLUME BOXES MUST BE PROVIDED UNDER THIS DIVISION. POWER WIRING (120V) TO CONTROL PANELS MUST BE PROVIDED . POWER (120V) AND CONTROL (24V) WIRING TO APPLICATION-SPECIFIC CONTROLLERS AND OTHER CONTROL SYSTEM COMPONENTS MUST ORIGINATE AT CONTROL PANELS AND BE PROVIDED UNDER THIS DIVISION.

12. COORDINATE LOCATIONS OF WALL, FLOOR, AND ROOF PENETRATIONS WITH THE GENERAL CONTRACTOR.

13. CAULK WITH SILICONE ALL UNUSED PENETRATION GAPS BETWEEN WALL, CEILING AND FLOOR OPENINGS, AND HVAC EQUIPMENT PENETRATIONS MUST MATCH EXISTING OR AS SHOWN ON MECHANICAL DETAILS. PATCH LARGE GAPS BEFORE

CAULKING IS APPLIED.

14. EXACT LOCATIONS OF THERMOSTATS, SENSORS, AND HVAC CONTROL APPURTENANCES MUST BE COORDINATED WITH FINAL LOCATIONS OF WALL-MOUNTED ARCHITECTURAL, FIRE PROTECTION, AND ELECTRICAL EQUIPMENT. MOUNT

THERMOSTATS AND SENSORS MINIMUM 4'-0" ABOVE FINISHED FLOOR.

15. ACCESS FOR INSPECTION MUST BE PROVIDED CLOSE TO EACH INSTANCE OF THE FOLLOWING: MOTOR OPERATED DAMPERS.

IF FEASIBLE, LOCATE DUCT ACCESS DOOR ON THE UNDERSIDE OF THE DUCT RATHER THAN THE SIDE. MINIMUM DUCT

ACCESS DOOR SIZE MUST BE BASED ON DUCT SIZE AS FOLLOWS:

DUCT SIZE ACCESS DOOR SIZE

12" AND SMALLER 12" LONG FLANGED & GASKETED REMOVABLE DUCT SECTION

13" TO 17" 12" X 12"

18" TO 24" 16" X 18"

25" AND LARGER 24" X 16"

16. EQUIPMENT

A. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT

NECESSITATING REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

M-001

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

GENERAL NOTES

AND DESIGN

CRITERIA

DULUTH

HVAC DESIGN CRITERIA

PROJECT LOCATION: GWINNETT COUNTY AP, GA,

USA (WMO: 797808)

LATITUDE: 33.98 N

LONGITUDE: 83.963 W

ELEVATION: 323 FT.

STANDARD DESIGN CONDITIONS

WINTER DESIGN DRY BULB (99.0%): 25.7 °F

SUMMER DESIGN DRY BULB (1.0%): 91.6 °F

SUMMER DESIGN WET BULB (1.0%): 74.4 °F

DEHUMIDIFICATION DESIGN CONDITIONS

DEWPOINT (1.0%): 75.1 °F

HUMIDITY RATIO (1.0%): 137.2

MEAN COINCIDENT DRY BULB (1.0%): 74.4 °F

CODE REFERENCES

CODE REFERENCE EDITION

INTERNATIONAL BUILDING CODE 2024

INTERNATIONAL ENERGY CONSERVATION CODE 2015

INTERNATIONAL FIRE CODE 2024

INTERNATIONAL FUEL GAS CODE 2024

INTERNATIONAL MECHANICAL CODE 2024

THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING A NEW OPEN SOURCE BAS (BUILDING

AUTOMATION SYSTEM) REPLACING THE EXISTING CARRIER CNN (CARRIER CONTROL NETWORK)

SYSTEM.

EACH PIECE OF EQUIPMENT SPECIFIED SHALL BE PROVIDED WITH UPDATED CONTROLS. THIS

INCLUDES ALL RTU'S (ROOFTOP UNITS) WITH BACNET AND UPC INTERFACE, NEW BACNET CONTROL

INTERFACE FOR AHU-1 (AIR HANDLING UNIT) IN THE BASEMENT, AND NEW BACNET AND UPC

INTERFACE FOR ALL TERMINAL AIR UNITS, AND START/STOP CONTROLS ON THE ROOF EXHAUST FAN.

THE NEW FRONT END MUST CONTAIN THE SAME INFORMATION AND FUNCTIONALITY AS THE EXISTING EQUIPMENT INCLUDING BUT NOT LIMITED TO: EQUIPMENT STATUS, MODE OF OPERATION, SETPOINTS, AIRFLOW, TEMPERATURES, OCCUPANCY, AND ALARMS.

THE ORIGINAL SEQUENCE OF OPERATION, INCLUDING INTERLOCKS, IS NOT AVAILABLE. THE

CONTRACTOR MUST ANALYZE THE EXISTING SYSTEMS AND EACH ITEM'S CURRENT SEQUENCE OF

OPERATION. PRIOR TO ANY DEMOLITION WORK, THE CONTRACTOR MUST SUBMIT A COMPLETE LIST OF ALL ITEMS AND THEIR SEQUENCES OF OPERATION. THIS APPROVED SUBMITTAL MUST BE USED DURING CONSTRUCTION AND INSTALLATION OF THE NEW CONTROL SYSTEM TO ENSURE ALL ITEMS

OPERATE THE SAME AS EXISTING.

EXISTING DRAWINGS INDICATE THE BASELINE HVAC EQUIPMENT LOCATIONS, TYPES, AND QUANTITIES

REQUIRING CONTROL UPGRADES. ALL OTHER GRAPHIC ELEMENTS, STRUCTURAL DETAILS, OR

ARCHITECTURAL INFORMATION ON THESE DRAWINGS ARE FOR BACKGROUND REFERENCE ONLY AND

ARE EXCLUDED FROM THIS SCOPE OF WORK.

NEW THERMOSTATS SHALL BE PROVIDED IN THE SAME LOCATION AS EXISTING UNLESS SPECIFICALLY

NOTED TO BE RELOCATED.

SCOPE OF WORK:

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

MECHANICAL ABBREVIATIONS:

@ AT

& AND

AFF ABOVE FINISHED FLOOR

A/C ABOVE CEILING

AC AIR CONDITIONER

ADJ ADJUSTABLE

AFMS AIRFLOW MEASURING STATION

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

AHRI AIR CONDITIONING, HEATING, AND REFRIGERATION

INSTITUTE

AHU AIR HANDLING UNIT

AMB AMBIENT

AMCA AIR MOVEMENT AND CONTROL ASSOCIATION

ARCH ARCHITECT, ARCHITECTURAL

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING, AND AIR CONDITIONING

ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING AND

MATERIALS

AUX AUXILIARY

AWS AMERICAN WELDING SOCIETY

AWG AMERICAN WIRE GAUGE

B BOILER

BAS BUILDING AUTOMATION SYSTEM

BD BACKDRAFT DAMPER

BLDG BUILDING

BOD BOTTOM OF DUCT

B/F BELOW FLOOR

B/S BELOW SLAB

BT BUFFER TANK

BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR

CA COMBUSTION AIR INTAKE

CAV CONSTANT AIR VOLUME

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CLG COOLING

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

CO2 CARBON DIOXIDE

CONC CONCRETE

CONN CONNECT, CONNECTING, CONNECTION

CONT CONTINUED

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICER'S (OWNER'S)

REPRESENTATIVE

CRAC COMPUTER ROOM AIR CONDITIONER

CT COOLING TOWER

CU CONDENSING UNIT

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

D DEPTH

DB, Tdb DRY BULB (TEMPERATURE) dBA DECIBELS

DDC DIRECT DIGITAL CONTROLS

DEG. F, (°F) DEGREES FAHRENHEIT

DH DEHUMIDIFIER

DIA, Ø DIAMETER

DIV DIVISION

DN DOWN

DOAS DEDICATED OUTSIDE AIR SYSTEM

DP DIFFERENTIAL PRESSURE

DSCU DUCTLESS SPLIT CONDENSING UNIT

DSHP DUCTLESS SPLIT HEAT PUMP

DSS DUCTLESS SPLIT SYSTEM (INDOOR UNIT)

DWG DRAWING

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

ELEC ELECTRICAL

ERU ENERGY RECOVERY UNIT

ERV ENERGY RECOVERY VENTILATOR

ET EXPANSION TANK

ESP EXTERNAL STATIC PRESSURE

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

EXT EXTERIOR

EXH EXHAUST

EXST, (E) EXISTING

FCU FAN COIL UNIT

FD FIRE DAMPER

FFE FINISHED FLOOR ELEVATION

FLA FULL LOAD AMPS

FPM FEET PER MINUTE

FSD FIRE SMOKE DAMPER

FT FOOT, FEET

FT WG FEET WATER GAUGE

FV FLUE VENT, FACE VELOCITY

GA GAGE

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

H HEIGHT

HGRH HOT GAS REHEAT

HP HORSEPOWER, HEAT PUMP

HR HOUR

HSPF HEATING SEASONAL PERFORMANCE FACTOR

HTG HEATING

HUH HYDRONIC UNIT HEATER

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HVLS HIGH-VOLUME LOW-SPEED

HX HEAT EXCHANGER

HZ HERTZ

IMC INTERNATIONAL MECHANICAL CODE

IN INCH, INCHES

IN WC INCHES WATER COLUMN

IN WG INCHES WATER GAUGE

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

KW KILOWATTS

L LENGTH, LOUVER (WALL)

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LWT LEAVING WATER TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH 1000 BRITISH THERMAL UNITS

MERV MINIMUM EFFICIENCY REPORTING VALUE

MECH MECHANICAL

MFR, MFG MANUFACTURER, MANUFACTURING

MIN MINIMUM

MOD MOTOR OPERATED DAMPER

MSS MANUFACTURER'S STANDARDIZATION SOCIETY

MTD MOUNTED

MUW MAKE-UP WATER (POTABLE/ DOMESTIC)

NC NOISE CRITERIA

N.C. NORMALLY CLOSED

NO. NUMBER

N.O. NORMALLY OPEN

NPLV NET PART LOAD VALUE

NTS NOT TO SCALE

OA OUTSIDE AIR

O.C. ON CENTER

PD PRESSURE DROP

PH PHASE

PIU POWERED-INDUCTION UNIT

PLBG PLUMBING

PPM PARTS PER MILLION

PRV PRESSURE REDUCING VALVE

PSI(G) POUNDS-FORCE PER SQUARE INCH (GAUGE)

QTY QUANTITY

RA RETURN AIR

RH RELATIVE HUMIDITY, ROOF HOOD

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RLA RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOFTOP UNIT

SA SUPPLY AIR

SD SMOKE DAMPER

SEER SEASONAL ENERGY EFFICIENCY RATIO

SF SUPPLY FAN

SKD SMOKE DETECTOR

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTOR'S NATIONAL ASSOCIATION

SP STATIC PRESSURE

SS STAINLESS STEEL

TA TRANSFER AIR

TEMP TEMPERATURE

TG TRANSFER GRILLE

TP TEMPERATURE/ PRESSURE TEST PORT

TSTAT THERMOSTAT

TYP TYPICAL

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UMCS UTILITY MONITORING AND CONTROL SYSTEM

V VOLTAGE, VOLTS

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VELO VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VSD VARIABLE SPEED DRIVE

W WATT(S), WIDTH

W/ WITH

W/O WITHOUT

WB, Twb WET BULB (TEMPERATURE)

WD WIDE

WMS WIRE MESH SCREEN

AIR DISTRIBUTION DEVICE TAGS:

DIFFUSER TYPE

A

400 AIRFLOW (CFM), "PLENUM", OR "TRANSFER"

A1

M-501

DRAWING REFERENCE KEY:

REFER TO

DETAIL NUMBER

SHEET NUMBER OF DETAIL

RE:A1/M-501

SP

F

CO CARBON MONOXIDE SENSOR

OVAL OR FLAT OVAL

STATIC PRESSURE SENSOR

ROUND

FIRESTAT

TEMPERATURE SENSOR

MISCELLANEOUS LEGEND:

T

VARIABLE FREQUENCY DRIVEVFD

PIPING LEGEND:

EXPANSION JOINT (EJ)

CLEANOUT

WATER METER

THERMOMETER

PRESSURE REDUCING VALVE

MANUAL AIR VENT

PRESSURE/TEMPERATURE PORT WITH

GAUGE COCK

PRESSURE SWITCH

PLUG VALVE

FLOW SWITCH

T&P RELIEF VALVE

AUTOMATIC AIR VENT

PRESSURE GAUGE WITH GAUGE COCK

PS

FS

BUTTERFLY VALVE

STRAINER (WITH BLOWDOWN

VALVE, CAP, AND CHAIN)

METERED BALANCING VALVE

GATE VALVE

CHECK VALVE

BALL VALVE

CONCENTRIC REDUCER

DIRECTION OF FLOW

DIRECTION OF SLOPE DOWN

ECCENTRIC REDUCER

PIPE FLANGE

PIPE CAP

PIPE GUIDE (PG)

PIPE ANCHOR (PA)X

UNION

TEE OUTLET UP

CONDENSATE DRAIN

BRANCH BOTTOM CONNECTION

BRANCH TOP CONNECTION

ELBOW UP

ELBOW DOWN

RISE OR DROP

TEE OUTLET DOWN

M

M

FIRE DAMPER

H

DUCT MOUNTED HUMIDIFIER

EXHAUST AIR DUCT DOWN

EXHAUST AIR DUCT UP

RETURN AIR DUCT DOWN

30"x14"

SQUARE TO ROUND DUCT BRANCH TAKE-OFF

WITH 45 DEGREE BRANCH INLET

FLARED SPIN-IN WITH DAMPER AND

FLEX DUCT (DIFFUSER CONNECTION)

ROUND DUCT BRANCH TAKE-OFF FROM

RECTANGULAR MAIN WITH CONICAL TAP

FLEXIBLE DUCT CONNECTION

FLOW ARROW

DUCT SIZE TRANSITION

RECTANGULAR DUCT BRANCH TAKE-OFF

WITH 45 DEGREE BRANCH INLET

90 DEGREE DUCT ELBOW WITH TURNING VANES

24"Ø

DUCTWORK LEGEND:

RETURN AIR DEVICE

ROUND DUCT. DIAMETER INDICATED IN INCHES.

IN-LINE 90 DEGREE RISE/DROP IN

SUPPLY DUCT (RIGHT SIDE IS HIGHER)

IN-LINE 90 DEGREE RISE/DROP IN

SUPPLY DUCT (LEFT SIDE IS HIGHER)

FD

SD

P - PNEUMATIC-ACTUATED DAMPER

DAMPER TYPE:

M - MOTORIZED DAMPER (ELECTRIC)

VD

SMOKE DAMPER

VOLUME/BALANCING DAMPER

(LABEL MAY BE OMITTED)

BD

BACKDRAFT DAMPER

(COUNTER-BALANCED UNLESS

OTHERWISE NOTED)

RADIUS DUCT ELBOW - ROUND OR

RECTANGULAR (MIN. 1.5 RADIUS UNLESS

OTHERWISE NOTED)

RECTANGULAR DUCT. SIZE INDICATED IN

INCHES, FIRST NUMBER IS SIDE SHOWN.

DASHED LINES INDICATE ACOUSTICAL LINER

SUPPLY AIR DEVICE

FSD

COMBINATION

FIRE/SMOKE DAMPER

EXHAUST AIR DEVICE

FC FAN CONTROLLER

SERVICE CLEARANCE

T THERMOSTAT

H HUMIDISTAT

$ START / STOP SWITCH

TH THERMOSTAT / HUMIDISTAT

HUMIDITY SENSORH

REFRIGERANT HOT GAS

REFRIGERANT LIQUIDRL

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

REFRIGERANT SUCTIONRS

RHG

CD

CHILLED WATER RETURNCHWR

CHILLED WATER SUPPLYCHWS

CONDENSER WATER RETURNCWR

CONDENSER WATER SUPPLYCWS

IN-LINE 90 DEGREE RISE/DROP IN

RETURN DUCT (RIGHT SIDE IS HIGHER)

DUCT SIZE TRANSITION RECTANGULAR TO

ROUND

30"/14" FLAT OVAL DUCT. SIZE INDICATED IN INCHES,

FIRST NUMBER IS SIDE SHOWN

RETURN AIR DUCT UP

SUPPLY OR OUTSIDE AIR DUCT DOWN

SUPPLY OR OUTSIDE AIR DUCT UP

IN-LINE 90 DEGREE RISE/DROP IN

RETURN DUCT (LEFT SIDE IS HIGHER)

IN-LINE 90 DEGREE RISE/DROP IN

EXHAUST DUCT (RIGHT SIDE IS HIGHER)

IN-LINE 90 DEGREE RISE/DROP IN

EXHAUST DUCT (LEFT SIDE IS HIGHER)

CONNECTION SIZE

(X"xX" INDICATES RECTANGULAR, X"/X"

INDICATES OVAL, X"Ø INDICATES ROUND)

X"xX"

TYP. OF #

TYPICAL OF QUANTITY INDICATED

DP DIFFERENTIAL PRESSURE SENSOR

FLEXIBLE PIPE

C CARBON DIOXIDE SENSOR

AQ AIR QUALITY SENSOR

SKD

DUCT MOUNTED SMOKE DETECTOR

PLAN NORTH

TRUE NORTH

NORTH ARROW:

3-WAY 2-WAY 1-WAY

ALL CEILING SUPPLY DIFFUSERS MUST BE 4-WAY FLOW

PATTERN, UNLESS NOTED OTHERWISE BY FILLED REGION.

2-WAY

PIPE CONTINUATION

PIPE BELOW SLAB OR BELOW GRADE

X DUCT PRESSURE CLASS (IN WG)

LINEAR SLOT AIR DEVICE

GLOBE VALVE

FLEXIBLE PIPE CONNECTOR

PT

EB BOILER EMERGENCY SHUTDOWN SWITCH

VALVE (GENERIC)

SIDEWALL AIR DEVICE

REFER TO

DETAIL NUMBER

SHEET NUMBER OF DETAIL

REF: A1/ M-5011

KEYNOTE NUMBER; REFER TO

KEYNOTE LEGEND ON SHEET

ES EMERGENCY HVAC SHUTDOWN SWITCH

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

M-002

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

ABBREVIATIONS

AND LEGENDS

DULUTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

SHEET NOTES

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

MH101

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

FLOOR PLAN -

BASEMENT

DULUTH

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

3. THE FLOOR PLAN IS A DISPLAY OF THE OWNERS COPY OF THE

RECORD DRAWINGS CREATED 10/16/06 AND ARE FOR

REFERENCE ONLY.

NOT TO SCALEA1

MECHANICAL FLOOR PLAN - BASEMENT

LIST OF EQUIPMENT IS AS FOLLOWS FOR THE BASEMENT LEVEL:

T-B-1 T-B-2 T-B-3 T-B-4 T-B-5 T-B-6 T-B-7

AHU-1

T-B-1

T-B-2

T-B-3

T-B-4

T-B-5

T-B-6

T-B-7

AHU-1

M A

R K

D E

S C

R

IP

T

IO

N D

A

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

SHEET NOTES

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

MH102

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

FLOOR PLAN -

LEVEL 1

DULUTH

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

3. THE FLOOR PLAN IS A DISPLAY OF THE OWNERS COPY OF THE

RECORD DRAWINGS CREATED 10/16/06 AND ARE FOR

REFERENCE ONLY.

4. CONTRACTOR TO RELOCATE THE THERMOSTAT SERVING UNIT

T-1-9 FROM ROOM 11.24 TO 11.30. COORDINATE WITH OWNER

FOR EXACT LOCATION.

NOT TO SCALEA1

MECHANICAL FLOOR PLAN - LEVEL 1

LIST OF EQUIPMENT IS AS FOLLOWS FOR THE FIRST FLOOR:

T-1-1 T-1-2 T-1-3 T-1-4 T-1-5 T-1-6 T-1-7 T-1-8 T-1-9 T-1-10 T-1-11 T-1-12 T-1-13 T-1-14 T-1-15

T

T-1-1

T-1-2

T-1-3

T-1-4

T-1-5

T-1-6

T-1-7

T-1-8

T-1-9T-1-10 T-1-11T-1-12

T-1-13

T-1-14 T-1-15

THERMOSTAT IS NOT

ACCURATE TO ACTUAL

LOCATION. SEE MARKUP.

T

CONTRACTOR TO

RELOCATE

THERMOSTAT TO THE

INDICATED AREA.

M A

R K

D E

S C

R

IP

T

IO

N D

A

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

SHEET NOTES

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

MH103

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

FLOOR PLAN -

LEVEL 2

DULUTH

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

3. THE FLOOR PLAN IS A DISPLAY OF THE OWNERS COPY OF THE

RECORD DRAWINGS CREATED 10/16/06 AND ARE FOR

REFERENCE ONLY.

4. THE LOCATIONS OF T-2-11 AND T-2-20 ARE BOTH NOT

ACCURATE TO THE DRAWINGS. SEE MARKUPS FOR

CORRECTED LOCATIONS. RELOCATION OF THESE

THERMOSTATS ARE NOT NECESSARY AND ARE BEING NOTED

FOR CLARITY ONLY.

SCALE: 1/8" = 1'-0"A1

MECHANICAL FLOOR PLAN - LEVEL 2

LIST OF EQUIPMENT IS AS FOLLOWS FOR THE SECOND FLOOR:

T-2-1 T-2-2 T-2-3 T-2-4 T-2-5 T-2-6 T-2-7 T-2-8 T-2-9 T-2-10 T-2-11 T-2-12 T-2-13 T-2-14 T-2-15 T-2-16 T-2-17 T-2-18 T-2-19 T-2-20 T-2-21

T

T

THE ACTUAL LOCATIONS FOR THE

THERMOSTATS IN THESE LOCATIONS ARE AS

PICTURED. RELOCATION IS NOT NECESSARY.

T-2-1 T-2-2 T-2-3T-2-4 T-2-5 T-2-6

T-2-7

T-2-8

T-2-9

T-2-10 T-2-11

T-2-12

T-2-13

T-2-14

T-2-15

T-2-16T-2-17T-2-18T-2-19

T-2-20

T-2-21

M A

R K

D E

S C

R

IP

T

IO

N D

A

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

SHEET NOTES

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

MH104

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

FLOOR PLAN -

LEVEL 3

DULUTH

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

3. THE FLOOR PLAN IS A DISPLAY OF THE OWNERS COPY OF THE

RECORD DRAWINGS CREATED 10/16/06 AND ARE FOR

REFERENCE ONLY.

NOT TO SCALEA1

MECHANICAL FLOOR PLAN - LEVEL 3

T-3-1

LIST OF EQUIPMENT IS AS FOLLOWS FOR THE THIRD FLOOR:

T-3-1 T-3-2 T-3-3 T-3-4 T-3-5 T-3-6 T-3-7 T-3-8 T-3-9 T-3-10 T-3-11 T-3-12 T-3-13 T-3-14

CU-1

RTU-2

T-3-2

T-3-3

T-3-4

T-3-5

T-3-6

T-3-7

T-3-8

T-3-9

T-3-10T-3-11

T-3-12

T-3-13

T-3-14

CU-1

RTU-2

M A

R K

D E

S C

R

IP

T

IO

N D

A

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

SHEET NOTES

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

MH105

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

FLOOR PLAN -

ROOF

DULUTH

1. REFER TO M-001 FOR MECHANICAL GENERAL NOTES AND

DESIGN CRITERIA.

2. REFER TO M-002 FOR MECHANICAL ABBREVIATIONS AND

LEGENDS.

3. THE FLOOR PLAN IS A DISPLAY OF THE OWNERS COPY OF THE

RECORD DRAWINGS CREATED 10/16/06 AND ARE FOR

REFERENCE ONLY.

NOT TO SCALEA1

MECHANICAL FLOOR PLAN - ROOF

LIST OF EQUIPMENT IS AS FOLLOWS FOR THE ROOF:

RTU-1

RTU-2

RTU-3

RTU-4

CU-1

EF-1

RTU-1

RTU-2

RTU-3

RTU-4

CU-1

EF-1

M A

R K

D E

S C

R

IP

T

IO

N D

A

23 00 00 - HVAC GENERAL

QUALITY ASSURANCE:

A. THE MECHANICAL EQUIPMENT AND INSTALLATION MUST

CONFORM TO THE FOLLOWING CODES:

1. THE INTERNATIONAL BUILDING CODE 2024 EDITION.

2. THE INTERNATIONAL MECHANICAL CODE 2024 EDITION.

3. THE INTERNATIONAL PLUMBING CODE, 2024 EDITION.

4. THE INTERNATIONAL FUEL GAS CODE, 2024 EDITION.

5. THE INTERNATIONAL FIRE CODE, 2024 EDITION.

6. THE INTERNATIONAL ENERGY CONSERVATION CODE, 2015

EDITION.

B. THE MECHANICAL EQUIPMENT AND INSTALLATION MUST

CONFORM TO THE FOLLOWING STANDARDS:

1. ASSOCIATE AIR BALANCE COUNCIL (AABC): NATIONAL

STANDARD FOR TOTAL SYSTEM BALANCE.

2. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):

STANDARD 90A: INSTALLATION OF AIR CONDITIONING AND

VENTILATING SYSTEMS.

STANDARD 70: NATIONAL ELECTRICAL CODE (NEC)

C. PUBLICATION DATES: WHERE THE DATE OF ISSUE OF A

REFERENCE STANDARD IS NOT SPECIFIED, COMPLY WITH THE

STANDARD THAT IS EFFECTIVE AS OF THE DATE OF CONTRACT

DOCUMENT.

D. PERMITS

1. OBTAIN ALL PERMITS AND INSPECTIONS FOR THE

INSTALLATION OF THIS WORK AND PAY ALL CHARGES

INCIDENT THERETO. DELIVER TO THE OWNER ALL

CERTIFICATES OF SAID INSPECTION ISSUED BY

AUTHORITIES HAVING JURISDICTION.

E. WORKMANSHIP AND MATERIALS COVERED BY THESE

SPECIFICATIONS MUST CONFORM TO ALL ORDINANCES AND

REGULATIONS OF THE CITY, COUNTY, AND/OR OTHER

AUTHORITIES HAVING JURISDICTION.

F. OPERATIONS AND MAINTENANCE MANUALS FOR ALL

SCHEDULED EQUIPMENT MUST BE PROVIDED TO THE OWNER

AS PART OF FINAL ACCEPTANCE.

GUARANTEE:

A. COMPONENTS OF THE MECHANICAL SYSTEM FURNISHED

UNDER THIS DIVISION OF THE SPECIFICATIONS MUST BE

GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF

ACCEPTANCE THEREOF, EITHER FOR BENEFICIAL USE OR

FINAL ACCEPTANCE, WHICHEVER IS EARLIER, AGAINST

DEFECTIVE MATERIAL, DESIGN, AND WORKMANSHIP.

ELECTRICAL WORK:

A. ALL ELECTRICAL EQUIPMENT FURNISHED UNDER THIS DIVISION

OF THESE SPECIFICATIONS MUST COMPLY THE ELECTRICAL

SYSTEM CHARACTERISTICS INDICATED ON THE ELECTRICAL

DRAWINGS.

B. MOTOR CONTROL COMPONENTS FURNISHED AS AN INTEGRAL

PART OF MECHANICAL EQUIPMENT MUST CONFORM TO

REQUIREMENTS OF ELECTRICAL DRAWINGS.

C. POWER WIRING MUST BE PROVIDED BY ELECTRICAL.

D. WIRING AND CONDUIT BETWEEN VFD AND MOTOR MUST BE

UNDER THIS DIVISION UNLESS IT IS INDICATED ON THE

ELECTRICAL DRAWINGS. WIRING AND CONDUIT MUST BE PER

NEC AND ELECTRICAL SPECIFICATIONS.

PAINTING:

A. FACTORY PAINTED EQUIPMENT THAT HAS BEEN SCRATCHED

OR MARRED MUST BE REPAINTED TO MATCH ORIGINAL COLOR.

B. STEEL EQUIPMENT HANGERS, SUPPORTS, AND UNINSULATED

BLACK STEEL PIPE EXPOSED TO SIGHT INSIDE THE BUILDING

WHICH ARE NOT PROVIDED WITH A FACTORY APPLIED PRIME

COAT MUST BE CLEANED OF RUST, GREASE, AND SCALE.

AFTER CLEANING HANGERS, SUPPORTS, AND PIPE, PROVIDE A

FILED-APPLIED PRIME COAT. IN ADDITION, SUCH ITEMS IN

FINISHED SPACES MUST BE PROVIDED WITH TWO COATS OF

FINISH PAINT IN A COLOR TO MATCH THE ADJACENT SURFACE.

CLEANING AND ADJUSTING:

A. ALL EQUIPMENT, PIPE, VALVES, AND FITTINGS MUST BE

CLEANED OF GREASE, OIL, PAINT SPOTS, METAL CUTTINGS,

SLUDGE, AND CONSTRUCTION DEBRIS.

B. DUCTS, PLENUMS, AND CASINGS MUST BE CLEANED OF ALL

DEBRIS AND BLOWN FREE OF ALL PARTICLES OF RUBBISH AND

DUST BEFORE INSTALLING OUTLET FACES.

C. BEARINGS MUST BE LUBRICATED AS RECOMMENDED BY THE

EQUIPMENT MANUFACTURER.

D. TEMPORARY FILTERS MUST BE PROVIDED FOR FANS THAT ARE

USED DURING CONSTRUCTION. AT THE TIME OF STARTING THE

TEST AND BALANCE PROCEDURES OF THE AIR DISTRIBUTION

SYSTEM, NEW FILTERS MUST BE INSTALLED.

23 05 93.01 - HVAC SYSTEMS COMMISSIONING

GENERAL:

A. THE PURPOSE OF THE COMMISSIONING PROCESS IS TO

PROVIDE THE OWNER/OPERATOR WITH ASSURANCE THAT THE

SYSTEMS HAVE BEEN INSTALLED ACCORDING TO THE

CONTRACT DOCUMENTS, AND OPERATE WITHIN THE

PERFORMANCE GUIDELINES SET OUT IN THE BASIS OF DESIGN

(BOD) AND THESE SPECIFICATIONS. THE INDEPENDENT

COMMISSIONING AUTHORITY (CXA) WILL PROVIDE THE OWNER

WITH AN UNBIASED, OBJECTIVE VIEW OF THE SYSTEM’S

INSTALLATION, OPERATION, AND PERFORMANCE. THE

COMMISSIONING PROCESS DOES NOT TAKE AWAY OR REDUCE

THE RESPONSIBILITY OF THE INSTALLING CONTRACTORS TO

PROVIDE A FINISHED PROJECT, INSTALLED, AND FULLY

FUNCTIONAL IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS.

B. THE CONSTRUCTION MANAGER, GENERAL CONTRACTOR, AND

SUB-CONTRACTORS MUST BE RESPONSIBLE FOR

COOPERATING, AND COORDINATING THEIR WORK WITH THE

CXA. EACH PARTY MUST ALSO BE RESPONSIBLE FOR

CARRYING OUT ALL THE PHYSICAL ACTIVITIES REQUIRED FOR

INSTALLATION OF COMPONENTS AND SYSTEMS, AND

OPERATING THEM DURING THE COMMISSIONING PROCESS AS

REQUIRED IN THIS SECTION.

C. DEFINITIONS:

1. BOD: BASIS OF DESIGN. A DOCUMENT, PREPARED BY

ARCHITECT/ENGINEER, THAT RECORDS CONCEPTS,

CALCULATIONS, DECISIONS, AND PRODUCT SELECTIONS

USED TO MEET THE OWNER'S PROJECT REQUIREMENTS

(OPR) AND TO SATISFY APPLICABLE REGULATORY

REQUIREMENTS, STANDARDS, AND GUIDELINES. THE

DOCUMENT INCLUDES BOTH NARRATIVE DESCRIPTIONS

AND LISTS OF INDIVIDUAL ITEMS THAT SUPPORT THE

DESIGN PROCESS.

2. COMMISSIONING PLAN: A DOCUMENT, PREPARED BY THE

CXA, THAT OUTLINES THE ORGANIZATION, SCHEDULE,

ALLOCATION OF RESOURCES, AND DOCUMENTATION

REQUIREMENTS OF THE COMMISSIONING PROCESS.

3. OPR: OWNER’S PROJECT REQUIREMENTS. A DOCUMENT,

PREPARED BY THE OWNER, THAT DETAILS THE

FUNCTIONAL REQUIREMENTS OF THE PROJECT AND

EXPECTATIONS OF HOW IT WILL BE USED AND OPERATED.

THIS DOCUMENT INCLUDES PROJECT GOALS, MEASURABLE

PERFORMANCE CRITERIA, COST CONSIDERATIONS,

BENCHMARKS, SUCCESS CRITERIA, AND SUPPORTING

INFORMATION.

D. COMMISSIONING TEAM:

1. MEMBERS APPOINTED BY CONTRACTOR(S):

a. INDIVIDUALS, EACH HAVING AUTHORITY TO ACT ON

BEHALF OF THE ENTITY HE OR SHE REPRESENTS,

EXPLICITLY ORGANIZED TO IMPLEMENT THE

COMMISSIONING PROCESS THROUGH COORDINATED

ACTIONS; THE COMMISSIONING TEAM MUST CONSIST

OF (BUT NOT BE LIMITED TO) REPRESENTATIVE OF

EACH CONTRACTOR, INCLUDING PROJECT

SUPERINTENDENT AND SUBCONTRACTORS

INSTALLERS, SUPPLIERS, AND SPECIALISTS DEEMED

APPROPRIATE BY THE CXA.

2. MEMBERS APPOINTED BY OWNER:

a. CXA: AN ENTITY IDENTIFIED BY THE OWNER THAT

LEADS, PLANS, SCHEDULES, AND COORDINATES THE

COMMISSIONING TEAM TO IMPLEMENT THE

COMMISSIONING PROCESS; OWNER WILL ENGAGE THE

CXA UNDER A SEPARATE CONTRACT

b. REPRESENTATIVES OF THE FACILITY USER AND

OPERATION AND MAINTENANCE PERSONNEL

c. ARCHITECT AND ENGINEERING DESIGN

PROFESSIONALS

RESPONSIBILITIES:

A. OWNER'S RESPONSIBILITIES:

1. PROVIDE THE OPR DOCUMENTATION TO THE CXA AND

EACH CONTRACTOR FOR INFORMATION AND USE.

2. ASSIGN OPERATION AND MAINTENANCE PERSONNEL AND

SCHEDULE THEM TO PARTICIPATE IN COMMISSIONING

TEAM ACTIVITIES.

3. PROVIDE THE BOD DOCUMENTS, PREPARED BY ARCHITECT

AND APPROVED BY OWNER, TO THE CXA AND EACH

CONTRACTOR FOR USE IN DEVELOPING THE

COMMISSIONING PLAN, SYSTEMS MANUAL, AND

OPERATION AND MAINTENANCE TRAINING PLAN.

B. CONTRACTORS RESPONSIBILITIES:

1. EACH CONTRACTOR AND THE ASSOCIATED

SUBCONTRACTORS MUST ASSIGN REPRESENTATIVES WITH

EXPERTISE AND AUTHORITY TO ACT ON THE PARTY'S

BEHALF AND SCHEDULE THEM TO PARTICIPATE IN AND

PERFORM COMMISSIONING PROCESS ACTIVITIES

INCLUDING (BUT NOT LIMITED TO) THE FOLLOWING:

a. EVALUATE PERFORMANCE DEFICIENCIES IDENTIFIED IN

TEST REPORTS AND, IN COLLABORATION WITH ENTITY

RESPONSIBLE FOR SYSTEM AND EQUIPMENT

INSTALLATION, RECOMMEND CORRECTIVE ACTION

b. COOPERATE WITH CXA FOR RESOLUTION OF ISSUES

RECORDED IN “ISSUES LOG"

c. ATTEND AND PARTICIPATE IN COMMISSIONING TEAM

MEETINGS

d. INTEGRATE AND COORDINATE COMMISSIONING

PROCESS ACTIVITIES WITH CONSTRUCTION SCHEDULE

e. REVIEW AND ACCEPT CONSTRUCTION CHECKLISTS

PROVIDED BY THE COMMISSIONING AUTHORITY

f. COMPLETE CONSTRUCTION CHECKLISTS AS WORK IS

COMPLETED AND PROVIDE TO THE COMMISSIONING

AUTHORITY

g. REVIEW AND ACCEPT COMMISSIONING PROCESS TEST

PROCEDURES PROVIDED BY THE COMMISSIONING

AUTHORITY

h. ACCOMPLISH COMMISSIONING PROCESS TEST

PROCEDURES

C. CXA RESPONSIBILITIES:

1. REVIEW THE DESIGN DOCUMENTS TO VERIFY THE OPR HAS

BEEN ADDRESSED AND THAT ADEQUATE TESTING CAN BE

PERFORMED IN ORDER TO DOCUMENT THAT THE SYSTEMS,

EQUIPMENT, AND COMPONENTS WILL COMPLY WITH THE

OPR AND BOD.

2. REVIEW THE DESIGN DOCUMENTS FOR EQUIPMENT

ACCESSIBILITY FOR TESTING, SERVICE, AND

MAINTENANCE.

3. REVIEW EQUIPMENT SUBMITTALS FOR USE IN DEVELOPING

TESTING PROCEDURES USED IN THE COMMISSIONING

PLAN.

4. ORGANIZE AND LEAD THE COMMISSIONING TEAM.

5. PROVIDE COMMISSIONING PLAN.

6. CONVENE COMMISSIONING TEAM MEETINGS.

7. PROVIDE PROJECT-SPECIFIC CONSTRUCTION CHECKLISTS

AND COMMISSIONING PROCESS TEST PROCEDURES.

8. DEVELOP DETAILED AND SPECIFIC FUNCTIONAL TESTING

PROCEDURES FOR EQUIPMENT AND SYSTEMS TO BE

COMMISSIONED.

9. PERFORM SITE INSPECTIONS AND VERIFY CONTRACTOR

READINESS FOR THE FUNCTIONAL TESTING PROCESS.

DOCUMENT DEFICIENCIES FOR FUTURE RESOLUTION.

10. WITNESS CONTRACTOR PERFORMED FUNCTIONAL

TESTING PROCESS AS APPROPRIATE TO VERIFY

CONTRACTOR COMPLIANCE WITH THE FUNCTIONAL

TESTING PROCEDURES. DOCUMENT DEFICIENCIES FOR

FUTURE RESOLUTION

11. PREPARE AND MAINTAIN ISSUES LOG.

12. PREPARE AND MAINTAIN COMPLETED CONSTRUCTION

CHECKLIST LOG.

13. WITNESS SYSTEMS, ASSEMBLIES, EQUIPMENT, AND

COMPONENT START UP.

14. COMPILE TEST DATA, INSPECTION REPORTS, AND

CERTIFICATES, AND INCLUDE THEM IN THE SYSTEMS

MANUAL AND COMMISSIONING REPORT.

15. DEVELOP A COMMISSIONING SCHEDULE TO PARALLEL THE

CONSTRUCTION SCHEDULE. THIS SCHEDULE MUST

INCLUDE (BUT IS NOT LIMITED TO) THE FOLLOWING:

a. ALL COMMISSIONING MEETINGS

b. CONSTRUCTION REVIEW AND STATIC TESTING

c. PRE-START AND START UP CHECK LIST PROCEDURES

d. SYSTEM OPERATIONAL VERIFICATIONS

e. FUNCTIONAL PERFORMANCE AND ACCEPTANCE

TESTING

f. OWNER TRAINING

g. SPECIAL TESTING

h. OFF-SEASON TESTING

16. DEVELOP A RESOLUTION TRACKING FORM (RTF) FORMAT

TO DOCUMENT EACH ISSUE, NON-COMPLIANCE ITEM, OR

DEFICIENCY ENCOUNTERED DURING THE COMMISSIONING

PROCESS. THE RTF WILL BE REVIEWED AT EACH

COMMISSIONING MEETING TO ASSURE ISSUES ARE ON

TRACK AND COMPLETED IN A TIMELY MANNER. THE RTF

FORMAT WILL INCLUDE:

a. A SPECIFIC AND INDIVIDUAL NUMBER FOR EACH ISSUE

b. A DESCRIPTION OF THE ISSUE

c. THE DATE THE ISSUE WAS DISCOVERED

d. THE PARTY RESPONSIBLE FOR RESOLVING THE ISSUE

e. THE DATE THE ISSUE WAS CORRECTED BY THE

RESPONSIBLE PARTY

f. THE DATE OF THE FINAL VERIFICATION BY THE CXA AS

COMPLETE

17. PERFORM CONSTRUCTION REVIEWS FROM TIME TO TIME.

THE RESULTS OF THE REVIEWS AND TESTS WILL BE

INCLUDED IN THE FINAL COMMISSIONING REPORT. ALL

ISSUES ENCOUNTERED WILL BE INCLUDED ON THE ISSUE

RESOLUTION TRACKING FORM. THE AGENT MUST

OBSERVE:

a. THE GENERAL INSTALLATION

b. THE INSTALLATION PRIOR TO BURIAL OR

CONCEALMENT

c. TO WITNESS STATIC TESTING (DUCT, HYDRONIC, ETC.)

18. DEVELOP SYSTEM VERIFICATION CHECKLISTS (SVC) FOR

EACH PIECE OF EQUIPMENT TO BE STARTED UP.

19. SCHEDULE THE CONTRACTORS AND VENDORS FOR ALL

OPERATION & MAINTENANCE (O&M) TRAINING.

COMMISSIONING REQUIREMENTS:

A. SYSTEMS TO BE COMMISSIONED:

1. ALL EQUIPMENT SHOWN ON THE SCHEDULE SHEETS

B. COMMISSIONING REPORT:

1. THE COMMISSIONING REPORT WILL INCLUDE A NARRATIVE

DESCRIPTION OF ALL SYSTEMS, EQUIPMENT, AND

COMPONENTS FOR EACH DIVISION OF THE

SPECIFICATIONS COMMISSIONED. IN ADDITION, THE

COMMISSIONING REPORT MUST INCLUDE (BUT IS NOT

LIMITED TO) THE FOLLOWING:

a. EXECUTIVE SUMMARY

b. MEETING MINUTES

c. OWNER’S PROJECT REQUIREMENTS REVIEWS

d. DESIGN REVIEWS

e. SUBMITTAL REVIEWS

f. CONSTRUCTION CHECKLIST

g. RESOLUTION TRACKING FORMS (RTF)

h. SYSTEM VERIFICATION CHECKLIST (SVC)

i. START-UP, POINT-TO-POINT/SEQUENCE VERIFICATION

AND TAB REPORTS.

j. FUNCTION PERFORMANCE TESTING (FPT)

k. O&M DATA

l. TRAINING AUDIO/VISUAL DOCUMENTATION

m. SYSTEMS MANUAL

n. OFF-SEASON MODE TESTS/TRAINING REPORTS

o. NEAR END OF WARRANTY REVIEW REPORT

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

M-301

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

SPECIFICATIONS

DULUTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

23 09 23 - DDC CONTROLS

GENERAL REQUIREMENTS:

A. PROVIDE AND INSTALL A WHOLE AND FULLY COMPLETE DIRECT

DIGITAL CONTROLS (DDC) SYSTEM. PROVIDE PRODUCT DATA

SUBMITTAL FOR ALL EQUIPMENT AND SOFTWARE ASSOCIATED

WITH THE CONTROL SYSTEM. PROVIDE SUBMITTAL WITH

DESCRIPTION AND EXAMPLES OF GRAPHICAL INTERFACE.

PROVIDE FULL DESCRIPTION OF SYSTEM ARCHITECTURE.

COMMUNICATIONS PROTOCOL MUST BE FULLY BACNET.

PROVIDE SCHEDULE FOR ALL CONTROL DAMPERS AND ALL

CONTROL VALVES. PROVIDE OPERATION AND MAINTENANCE

MANUALS FOR EACH DEVICE AND THE SYSTEM AS A WHOLE.

B. DDC SYSTEM MANUFACTURER QUALIFICATIONS:

1. NATIONALLY RECOGNIZED MANUFACTURER OF DDC

SYSTEMS AND PRODUCTS.

2. DDC SYSTEMS AND PRODUCTS THAT HAVE BEEN

SUCCESSFULLY TESTED AND IN USE ON AT LEAST FIVE

PREVIOUS PROJECTS.

3. HAVING COMPLETE PUBLISHED CATALOG LITERATURE,

INSTALLATION, OPERATION AND MAINTENANCE MANUALS

FOR ALL PRODUCTS INTENDED FOR USE.

4. HAVING FULL-TIME IN-HOUSE EMPLOYEES FOR THE

FOLLOWING:

a. PRODUCT RESEARCH AND DEVELOPMENT.

b. PRODUCT AND APPLICATION ENGINEERING.

c. PRODUCT MANUFACTURING, TESTING AND QUALITY

CONTROL.

d. TECHNICAL SUPPORT FOR DDC SYSTEM INSTALLATION

TRAINING, COMMISSIONING, AND TROUBLESHOOTING

OF INSTALLATIONS.

e. OWNER OPERATOR TRAINING.

C. DDC SYSTEM PROVIDER QUALIFICATIONS:

1. AUTHORIZED REPRESENTATIVE OF, AND TRAINED BY, DDC

SYSTEM MANUFACTURER.

2. DEMONSTRATED PAST EXPERIENCE WITH INSTALLATION OF

DDC SYSTEM PRODUCTS BEING INSTALLED FOR PERIOD

WITHIN FIVE CONSECUTIVE YEARS BEFORE TIME OF BID.

3. DEMONSTRATED PAST EXPERIENCE ON FIVE PROJECTS OF

SIMILAR COMPLEXITY, SCOPE, AND VALUE.

4. EACH PERSON ASSIGNED TO PROJECT MUST HAVE

DEMONSTRATED PAST EXPERIENCE.

5. STAFFING RESOURCES OF COMPETENT AND EXPERIENCED

FULL-TIME EMPLOYEES THAT ARE ASSIGNED TO EXECUTE

WORK ACCORDING TO SCHEDULE.

6. SERVICE AND MAINTENANCE STAFF ASSIGNED TO

SUPPORT PROJECT DURING WARRANTY PERIOD.

7. DDC SYSTEM MANUFACTURER'S BACKING MUST TAKE

OVER EXECUTION OF WORK IF NECESSARY, TO COMPLY

WITH REQUIREMENTS INDICATED. INCLUDE PROJECT-

SPECIFIC WRITTEN LETTER, SIGNED BY MANUFACTURER'S

CORPORATE OFFICER, IF REQUESTED.

D. MANUFACTURER'S WARRANTY: MANUFACTURER AND

INSTALLER AGREE TO REPAIR OR REPLACE PRODUCTS THAT

FAIL IN MATERIALS OR WORKMANSHIP WITHIN SPECIFIED

WARRANTY PERIOD.

1. FAILURES MUST BE ADJUSTED, REPAIRED, OR REPLACED

AT NO ADDITIONAL COST OR REDUCTION IN SERVICE TO

OWNER.

2. INCLUDE UPDATES OR UPGRADES TO SOFTWARE AND

FIRMWARE IF NECESSARY, TO RESOLVE DEFICIENCIES.

a. INSTALL UPDATES ONLY AFTER RECEIVING OWNER'S

WRITTEN AUTHORIZATION.

3. WARRANTY SERVICE MUST OCCUR DURING NORMAL

BUSINESS HOURS AND COMMENCE WITHIN 24 HOURS OF

OWNER'S WARRANTY SERVICE REQUEST.

4. WARRANTY PERIOD: TWO YEAR(S) FROM DATE OF

SUBSTANTIAL COMPLETION.

a. FOR GATEWAY: THREE YEAR PARTS AND LABOR

WARRANTY FOR EACH.

E. DDC SYSTEM MUST BE MICROPROCESSOR-BASED

MONITORING AND CONTROL INCLUDING ANALOG/DIGITAL

CONVERSION AND PROGRAM LOGIC. A CONTROL LOOP OR

SUBSYSTEM IN WHICH DIGITAL AND ANALOG INFORMATION IS

RECEIVED AND PROCESSED BY A MICROPROCESSOR, AND

DIGITAL CONTROL SIGNALS ARE GENERATED BASED ON

CONTROL ALGORITHMS AND TRANSMITTED TO FIELD DEVICES

TO ACHIEVE A SET OF PREDEFINED CONDITIONS. DDC SYSTEM

MUST CONSIST OF A PEER-TO-PEER NETWORK OF

DISTRIBUTED DDC CONTROLLERS, OTHER NETWORK DEVICES,

OPERATOR INTERFACES, AND SOFTWARE.

F. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES:

LISTED AND LABELED AS DEFINED IN NFPA 70, BY A QUALIFIED

TESTING AGENCY, AND MARKED FOR INTENDED LOCATION AND

APPLICATION.

G. DDC SYSTEM MUST BE WEB BASED:

1. WEB-BASED ACCESS TO DDC SYSTEM:

a. DDC SYSTEM SOFTWARE MUST BE BASED ON SERVER

THIN-CLIENT ARCHITECTURE, DESIGNED AROUND OPEN

STANDARDS OF WEB TECHNOLOGY. DDC SYSTEM

SERVER MUST BE ACCESSED USING A WEB BROWSER

OVER DDC SYSTEM NETWORK, USING LOCAL AREA

NETWORK (LAN) INSTALLED BY CONTROLS VENDOR,

AND REMOTELY OVER INTERNET

b. INTENT OF THIN-CLIENT ARCHITECTURE IS TO PROVIDE

OPERATORS COMPLETE ACCESS TO DDC SYSTEM VIA A

WEB BROWSER. NO SPECIAL SOFTWARE OTHER THAN A

WEB BROWSER MUST BE REQUIRED TO ACCESS

GRAPHICS, POINT DISPLAYS, AND TRENDS; TO

CONFIGURE TRENDS, POINTS, AND CONTROLLERS; AND

TO EDIT PROGRAMMING.

c. WEB ACCESS MUST BE PASSWORD PROTECTED.

2. WEB-COMPATIBLE ACCESS TO DDC SYSTEM:

a. WORKSTATION AND SERVER MUST PERFORM OVERALL

SYSTEM SUPERVISION AND CONFIGURATION,

GRAPHICAL USER INTERFACE, MANAGEMENT REPORT

GENERATION, AND ALARM ANNUNCIATION.

b. DDC SYSTEM MUST SUPPORT WEB BROWSER ACCESS

TO BUILDING DATA. OPERATOR USING A STANDARD

WEB BROWSER MUST BE ABLE TO ACCESS CONTROL

GRAPHICS AND CHANGE ADJUSTABLE SET POINTS.

c. WEB ACCESS MUST BE PASSWORD PROTECTED.

C. ENGAGE A QUALIFIED PROFESSIONAL TO DESIGN DDC SYSTEM

TO SATISFY REQUIREMENTS INDICATED.

1. DDC SYSTEM TO MANAGE HVAC SYSTEMS.

2. DDC SYSTEM CONTROL MUST OPERATE HVAC SYSTEMS TO

ACHIEVE OPTIMUM OPERATING COSTS WHILE USING LEAST

POSSIBLE ENERGY AND MAINTAINING SPECIFIED

PERFORMANCE.

3. DDC SYSTEM MUST RESPOND TO POWER FAILURES, HVAC

EQUIPMENT FAILURES, AND ADVERSE AND EMERGENCY

CONDITIONS ENCOUNTERED THROUGH CONNECTED

INPUT/OUTPUT (I/O) POINTS.

4. DDC SYSTEM MUST OPERATE WHILE UNATTENDED BY AN

OPERATOR AND THROUGH OPERATOR INTERACTION.

5. DDC SYSTEM MUST RECORD TRENDS AND TRANSACTION

OF EVENTS AND PRODUCE REPORT INFORMATION SUCH AS

PERFORMANCE, ENERGY, OCCUPANCIES, AND EQUIPMENT

OPERATION.

D. CONTINUITY OF OPERATION AFTER ELECTRIC POWER

INTERRUPTION:

1. EQUIPMENT AND ASSOCIATED FACTORY-INSTALLED

CONTROLS, FIELD-INSTALLED CONTROLS, ELECTRICAL

EQUIPMENT, AND POWER SUPPLY CONNECTED TO

BUILDING NORMAL AND BACKUP POWER SYSTEMS MUST

AUTOMATICALLY RETURN EQUIPMENT AND ASSOCIATED

CONTROLS TO OPERATING STATE OCCURRING

IMMEDIATELY BEFORE LOSS OF NORMAL POWER, WITHOUT

NEED FOR MANUAL INTERVENTION BY OPERATOR WHEN

POWER IS RESTORED EITHER THROUGH BACKUP POWER

SOURCE OR THROUGH NORMAL POWER IF RESTORED

BEFORE BACKUP POWER IS BROUGHT ONLINE.

E. DDC SYSTEM MUST CONSIST OF DEDICATED AND SEPARATED

LANS THAT ARE NOT SHARED WITH OTHER BUILDING SYSTEMS

AND TENANT DATA AND COMMUNICATION NETWORKS.

F. SYSTEM ARCHITECTURE MUST PERFORM MODIFICATIONS

WITHOUT HAVING TO REMOVE AND REPLACE EXISTING

NETWORK EQUIPMENT.

G. SYSTEM DESIGN MUST ELIMINATE DEPENDENCE ON ANY

SINGLE DEVICE FOR SYSTEM ALARM REPORTING AND

CONTROL EXECUTION. EACH CONTROLLER MUST OPERATE

INDEPENDENTLY BY PERFORMING ITS' OWN CONTROL, ALARM

MANAGEMENT AND HISTORICAL DATA COLLECTION.

H. OPERATOR MEANS OF SYSTEM ACCESS: OPERATOR MUST BE

ABLE TO ACCESS ENTIRE DDC SYSTEM THROUGH ANY OF

MULTIPLE MEANS, INCLUDING (BUT NOT LIMITED TO) THE

FOLLOWING:

1. DESKTOP AND PORTABLE WORKSTATION WITH HARDWIRED

CONNECTION THROUGH LAN PORT.

2. PORTABLE OPERATOR TERMINAL WITH HARDWIRED

CONNECTION THROUGH LAN PORT.

3. PORTABLE OPERATOR WORKSTATION WITH WIRELESS

CONNECTION THROUGH LAN ROUTER.

4. MOBILE DEVICE AND APPLICATION WITH SECURED

WIRELESS CONNECTION THROUGH LAN ROUTER OR

CELLULAR DATA SERVICE.

5. REMOTE CONNECTION THROUGH WEB ACCESS.

I. NETWORK PORTS: FOR HARDWIRED CONNECTION OF

DESKTOP OR PORTABLE WORKSTATION. NETWORK PORT TO

BE EASILY ACCESSIBLE, PROPERLY PROTECTED, CLEARLY

LABELED, AND INSTALLED AT THE FOLLOWING LOCATIONS:

1. EACH MECHANICAL EQUIPMENT ROOM.

2. EACH DIFFERENT ROOF LEVEL WITH ROOF-MOUNTED AIR-

HANDLING UNITS OR ROOFTOP UNITS.

J. CRITICAL ALARM REPORTING:

1. OPERATOR-SELECTED CRITICAL ALARMS MUST BE SENT BY

DDC SYSTEM TO NOTIFY OPERATOR OF CRITICAL ALARMS

THAT REQUIRE IMMEDIATE ATTENTION.

2. DDC SYSTEM MUST SEND ALARM NOTIFICATION TO

MULTIPLE RECIPIENTS THAT ARE ASSIGNED FOR EACH

ALARM.

3. DDC SYSTEM MUST NOTIFY RECIPIENTS BY ANY OR ALL

MEANS, INCLUDING E-MAIL, TEXT MESSAGE, AND

PRERECORDED PHONE MESSAGE TO MOBILE AND

LANDLINE PHONE NUMBERS.

K. INCLUDE BACNET COMMUNICATION PORTS, WHENEVER

AVAILABLE AS AN EQUIPMENT OEM STANDARD OPTION, FOR

INTEGRATION VIA A SINGLE COMMUNICATION CABLE. BACNET-

CONTROLLED PLANT EQUIPMENT INCLUDES, BUT IS NOT

LIMITED TO, BOILERS, CHILLERS, AND VARIABLE-SPEED

DRIVES.

L. INCLUDE GATEWAYS TO CONNECT BACNET TO LEGACY

SYSTEMS, EXISTING NON-BACNET DEVICES, AND EXISTING

NON-BACNET DDC-CONTROLLED EQUIPMENT, ONLY WHEN

SPECIFICALLY REQUESTED AND APPROVED BY OWNER.

CONTROLLER REQUIREMENTS:

A. DDC SYSTEM MUST CONSIST OF A COMBINATION OF NETWORK

CONTROLLERS, PROGRAMMABLE APPLICATION CONTROLLERS

AND APPLICATION-SPECIFIC CONTROLLERS TO SATISFY

PERFORMANCE REQUIREMENTS INDICATED.

B. DDC CONTROLLERS MUST PERFORM MONITORING, CONTROL,

ENERGY OPTIMIZATION, AND OTHER REQUIREMENTS

INDICATED.

C. DDC CONTROLLERS MUST USE A MULTITASKING, MULTIUSER,

REAL-TIME DIGITAL CONTROL MICROPROCESSOR WITH A

DISTRIBUTED NETWORK DATABASE AND INTELLIGENCE.

D. EACH DDC CONTROLLER MUST BE CAPABLE OF FULL AND

COMPLETE OPERATION AS A COMPLETELY INDEPENDENT UNIT

AND AS A PART OF A DDC SYSTEM-WIDE DISTRIBUTED

NETWORK.

E. NETWORK CONTROLLER REQUIREMENTS:

1. INCLUDE ADEQUATE NUMBER OF CONTROLLERS TO

ACHIEVE PERFORMANCE INDICATED.

2. SYSTEM MUST CONSIST OF ONE OR MORE INDEPENDENT,

STANDALONE, MICROPROCESSOR-BASED NETWORK

CONTROLLERS TO MANAGE GLOBAL STRATEGIES

INDICATED.

3. CONTROLLER MUST HAVE ENOUGH MEMORY TO SUPPORT

ITS OPERATING SYSTEM, DATABASE, AND PROGRAMMING

REQUIREMENTS.

4. DATA MUST BE SHARED BETWEEN NETWORKED

CONTROLLERS AND OTHER NETWORK DEVICES.

5. OPERATING SYSTEM OF CONTROLLER TO MANAGE INPUT

AND OUTPUT COMMUNICATION SIGNALS TO ALLOW

DISTRIBUTED CONTROLLERS MUST SHARE REAL AND

VIRTUAL OBJECT INFORMATION AND ALLOW FOR CENTRAL

MONITORING AND ALARMS.

6. CONTROLLERS MUST HAVE A REAL-TIME CLOCK.

7. CONTROLLER MUST CONTINUALLY CHECK STATUS OF ITS

PROCESSOR AND MEMORY CIRCUITS. IF AN ABNORMAL

OPERATION IS DETECTED, CONTROLLER MUST ASSUME A

PREDETERMINED FAILURE MODE AND GENERATE AN

ALARM NOTIFICATION.

8. CONTROLLERS MUST BE FULLY PROGRAMMABLE.

F. APPLICATION-SPECIFIC CONTROLLERS MUST BE

MICROPROCESSOR-BASED CONTROLLERS, WHICH THROUGH

HARDWARE OR FIRMWARE DESIGN ARE DEDICATED TO

CONTROL A SPECIFIC PIECE OF EQUIPMENT. CONTROLLERS

ARE NOT FULLY USER-PROGRAMMABLE BUT ARE

CONFIGURABLE AND CUSTOMIZABLE FOR OPERATION OF

EQUIPMENT THEY ARE DESIGNED TO CONTROL.

1. CAPABLE OF STANDALONE OPERATION AND MUST

CONTINUE TO INCLUDE CONTROL FUNCTIONS WITHOUT

BEING CONNECTED TO NETWORK.

2. DATA MUST BE SHARED BETWEEN NETWORKED

CONTROLLERS AND OTHER NETWORK DEVICES.

INSTALLATION REQUIREMENTS:

A. INSTALL PRODUCTS TO SATISFY MORE STRINGENT OF ALL

REQUIREMENTS INDICATED.

B. INSTALL PRODUCTS LEVEL, PLUMB, PARALLEL, AND

PERPENDICULAR WITH BUILDING CONSTRUCTION.

C. SUPPORT PRODUCTS, TUBING, PIPING, WIRING, AND

RACEWAYS. BRACE PRODUCTS TO PREVENT LATERAL

MOVEMENT AND SWAY OR A BREAK IN ATTACHMENT WHEN

SUBJECTED TO A FORCE.

D. FABRICATE OPENINGS AND INSTALL SLEEVES IN CEILINGS,

FLOORS, ROOF, AND WALLS REQUIRED BY INSTALLATION OF

PRODUCTS. BEFORE PROCEEDING WITH DRILLING, PUNCHING,

AND CUTTING, CHECK FOR CONCEALED WORK TO AVOID

DAMAGE. PATCH, FLASH, GROUT, SEAL, AND REFINISH

OPENINGS TO MATCH ADJACENT CONDITION.

E. IF PRODUCT LOCATIONS ARE NOT INDICATED, INSTALL

PRODUCTS IN LOCATIONS THAT ARE ACCESSIBLE AND THAT

WILL PERMIT SERVICE AND MAINTENANCE FROM FLOOR,

EQUIPMENT PLATFORMS, OR CATWALKS WITHOUT REMOVAL

OF PERMANENTLY INSTALLED FURNITURE AND EQUIPMENT.

F. CONTROL WIRE, CABLE, AND RACEWAYS INSTALLATION MUST

COMPLY WITH NECA 1.

G. ENGAGE A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE

WITH COMPLETE KNOWLEDGE OF PROJECT-SPECIFIC SYSTEM

INSTALLED TO TRAIN OWNER'S MAINTENANCE PERSONNEL TO

ADJUST, OPERATE, AND MAINTAIN DDC SYSTEM.

Copyright © 2026 by Pond & Company. All rights reserved. No copying or duplication of these documents is allowed without the expressed written agreement of Pond & Company.

1 2

D

SHEET NUMBER

SUBMITTED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

DATE:

SHEET TITLE

DRAWING ISSUE

EOR/AOR SEAL

CLIENT INFORMATION

3500 Parkway Lane Suite 500

Peachtree Corners Georgia 30092

ORIGINAL SHEET SIZE:

22" X 34"

PROJECT NAME

3 4 5

C

B

A

PROJECT #:

/2

/2

:4

:5

P

M A u to d e sk

D o cs

/1

D u lu th M e ch a n ic a l C o n tr o ls /1

D u lu th M e ch

C o n tr o ls

M

E C

H v2

.r vt

95% DESIGN

M-302

TT

CMM

CMM

WWC

8/25/26

1260399

DULUTH

MECH

CONTROLS

3167 Main St, Duluth, GA 30096

MECHANICAL

SPECIFICATIONS

DULUTH

M A

R K

D E

S C

R

IP

T

IO

N D

A

File details come from the government source that posted it. Updated .