RFP2027_01 _ 2027 HVAC City of Duluth_Exh 2.pdf
PDF 229 KB Posted
- Attached to
- RFP2027-01 - HVAC City of Duluth
- Solicitation number
- PE-66750-NONST-2027-000000030
- Issued by
- Gwinnett County, Georgia
About this file
This is a 95% Design Submittal document prepared by Pond & Company for the City of Duluth, Georgia, detailing an HVAC controls system replacement project at Duluth City Hall located at 3167 Main Street, Duluth, GA 30096. The project involves a comprehensive controls system upgrade to replace the existing obsolete Carrier DDC (Direct Digital Control) system with a new open-source Building Automation System (BAS). The scope of work encompasses full controls upgrades for five air handling/rooftop units, 57 associated VAV (Variable Air Volume) units, and one exhaust fan. Prior to demolition, the contractor must submit a complete list of all items with their current sequences of operation and control points for approval. The new front-end system must maintain equivalent information and functionality as the existing equipment, including equipment status, mode of operation, setpoints, airflow, temperatures, occupancy monitoring, and alarms. The design was submitted on August 25, 2026, and is based on the 2024 International Building Code standards.
No pricing information, set-asides, incumbent contractor details, funding sources, or contract award dates are provided in this design analysis document. The file focuses exclusively on technical design specifications, applicable codes, and project scope requirements rather than procurement terms, financial arrangements, or competitive bidding parameters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
95% DESIGN SUBMITTAL
DESIGN ANALYSIS
Controls Replacement at Duluth City Hall, Duluth GA
August 25, 2026
3167 Main St, Duluth, GA 30096
Pond & Company 3500 Parkway Lane, Suite 500
Peachtree Corners, Georgia 30092 678.336.7740 www.pondco.com
Pond Project No. 1260399 Pond Contract No.
Duluth City Hall 95% Design Analysis 3167 Main St, Duluth, GA 30096 August 24, 2026
TABLE OF CONTENTS
1 PROJECT NARRATIVE 3
Project Description
Project Goals / Requirements
2 MECHANICAL 4
Applicable Codes
General
1 PROJECT NARRATIVE
Project Description
Project Title: Duluth City Hall controls
Location: 3167 Main St, Duluth, GA 30096
Project Goals / Requirements
The purpose of this A/E Task Order is to provide an engineering scope of work for a controls system upgrade on the Duluth City Hall HVAC system.
2 MECHANICAL
Applicable Codes
Design methods for the various materials and methods shall be in accordance with the current editions of the codes and specifications listed below:
IBC-2024 International Building Code-2024 Edition
General
The existing Carrier DDC controls (Carrier Control Network) for the Duluth City Hall have been found to be obsolete and failing from a mechanical standpoint. A new open-source BAS (Building Automation System) will be required to replace the existing Carrier CNN system.
This project involves the full controls system upgrade of the Duluth City Hall HVAC system. This scope includes the following: (5) air handling/rooftop units, (57) associated VAV units, and (1) exhaust fan. Any additional units are to be considered existing to remain and controlled locally. Specified units are to be provided with updated controls and tied into the new open-source DDC system. The new front end must contain the same information and functionality as the existing equipment including, but not limited to, equipment status, mode of operation, setpoints, airflow, temperatures, occupancy, and alarms.
The contractor must analyze the existing systems and each item's current sequence of operation and control points lists. Prior to any demolition work, the contractor must submit a complete list of all items and their sequences of operation. This approved submittal must be used during construction and installation of the new control system to ensure all items operate the same as existing.