RFP: 62-26 Emergency Bridge Deck & Joint Repairs at Various locations

Closed State & local contract opportunity Posted

Solicitation number
BD-26-1206-MBTA-MBTA-130055
State
Massachusetts
Responses due

Opportunity facts

Point of contact

Opportunity details come from commbuys.com. Updated .

About this opportunity

The Massachusetts Bay Transportation Authority (MBTA) is soliciting proposals under RFP 62-26 for scheduled and emergency bridge deck and joint repairs at various MBTA-owned bridges, with responses due July 22, 2026 at 2:00 PM via COMMBUYS. That deadline precedes today's date of November 17, 2026. The solicitation indicates no set-asides. Bidders must document at least 10 completed projects involving bridge joints, bridge deck repairs, or bridge construction, along with a minimum of 5 years of bridge repair and construction experience on public highway bridges, and must own or lease specified construction equipment.

Scope covers labor, supervision, materials, and equipment for asphaltic bridge joint system installation and replacement, repair of unsound concrete, removal of deck joints and guard angles, milling and paving of decks and approaches, partial and full-depth excavation, and concrete preservation using penetrant sealers, protective coatings, and epoxy healer-sealer treatments. Item 964.6 epoxy sealer must be one of three approved products: Bridge Seal 75% by Unitex, Dural 335 by Euclid Chemical, or Sikadur 55 SLV by Sika Corporation. Work follows the 2026 MassDOT Standard Specifications for Highways and Bridges and supplemental specifications dated March 31, 2026, and includes lead paint removal on steel elements. Emergency repairs require response within four hours, priority repairs within seven calendar days, and scheduled repairs within thirty calendar days. Locations may include bridges on the Red, Orange, Green, and Blue Lines, the Mattapan High Speed Line, and the Greenbush Line, and the MBTA may modify locations through formal contract amendments. Subcontracting requires prior MBTA approval. The contractor must submit a project-specific Safety and Health Plan before starting work, guarantee workmanship and materials for one year, and maintain 24/7 emergency notification.

The contract runs one year from execution, with up to three one-year option periods exercisable at the MBTA's sole discretion. Bidders submit all-inclusive unit prices on Form D for approximately 50 bid items, and option years use a uniform percentage escalation factor. Payment reflects actual work performed. Award goes to the lowest priced responsive and responsible bidder, and the MBTA reserves the right to award to one or multiple bidders. Bidders must provide a bid bond or certified check equal to 5 percent of the total bid, and prices must remain valid for 120 calendar days. Non-response damages of $1,000 per day (or per hour for emergencies) apply to missed milestones. The MBTA does not negotiate its standard terms, and modifications may disqualify a bid.

The pre-bid conference was June 22, 2026, and questions were due July 3, 2026. The virtual bid opening follows at 2:30 PM on July 22, 2026.

Opportunity text

The Massachusetts Bay Transportation Authority (MBTA) is seeking qualified contractors to provide roadway bridge joint repairs, roadway bridge deck repairs, and associated maintenance work at various MBTA-owned bridge locations.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors