Form D. Estimate and Bid Form.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
RFP: 62-26 Emergency Bridge Deck & Joint Repairs at Various locations
Solicitation number
BD-26-1206-MBTA-MBTA-130055
Issued by
Massachusetts

About this file

This is a bidding and pricing form for the Massachusetts Bay Transportation Authority (MBTA) for scheduled and emergency bridge deck and joint repairs at various locations. The contract involves multiple line items covering a range of construction and maintenance services related to bridge infrastructure, including excavation, concrete work, asphalt paving, joint sealing, waterproofing, traffic management, and emergency response capabilities. Contractors must provide all-inclusive unit prices for each item in the base year, with quoted prices encompassing prevailing wages, tooling, equipment, transportation costs, and all associated charges. The form includes approximately 50 bid items with total estimated quantities ranging from 2 units (emergency response) to 15,000 units (concrete protective coating), and allows for a one-year base contract term with three optional renewal years.

Pricing must be submitted on an all-inclusive unit price basis per item, with the total contract value serving as an estimate based on actual work completed in Contract Year 1. For option years one through three, contractors must provide a uniform percentage escalation factor applied to all base year items rather than individual pricing for each line item. Payment will be based on actual work performed rather than estimated quantities. Special provision 748.1 addresses emergency response, requiring contractors to maintain a four-hour response time, with payment made per occurrence for mobilization and equipment positioning; failure to meet response requirements may result in withheld payment and assessment of non-response damages. The form does not identify specific set-asides, funding sources, or incumbent contractor information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

FORM C. REQUESTED RFP PRICING FORM
Instructions: Contractors should provide all-inclusive unit price per item in Column D. The quoted prices shall be inclusive of ancillary charges including but not limited to prevailing wages, tooling, equipment, transportation costs, customs, duty charges, and other associated charges. Bidders shall quote only on goods and services in strict accordance with the specifications / requirements. The total contract value in Column E is an estimate based on project work completed in Contract Year 1. Payment will be based on actual work completed.

Contractors should provide percentage escalation rates from the base year for Option Years 1-3 in Columns G-I.

tc={39E6574D-8F20-40E9-9F4C-756EFF5E4201}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Knoth, Gretchen This section is not needed. Potential bidders know that every item includes labor, materials, bonds, etc. Option year prices should be a percentage escalation from base year. These are not tied to any index.

Reply:

Hi @Losordo, Ben - even if that is common industry practice, I recommend retaining this language here in order to clearly state the methodology to be followed.

I've updated the guidance regarding Options Years per your guidance.

cc @O'Connor, Mellissa Reply:

ok Reply:

@Knoth, Gretchen ok, but the escalation factor should be the same for every item. This form gives the option of providing a different escalation factor for every item.

Reply:

@Losordo, Ben - I've updated to table to request the escalation factors by year in cells G63 - I65 below Reply:

perfect. thank you

* denotes Special Provision Item
Location: MBTA
Description : Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations
ITEM #TOTAL ESTIMATED QUANTITYITEM WITH UNIT BID PRICE WRITTEN IN WORDS

tc={5272F766-7F76-4A38-BC82-9B3A048C47EC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

All rows are all-inclusive and include labor and any associated costs.

Base labor rate will only be used for non-bid items UNIT PRICE AMOUNT tc={0C11064E-9574-4979-A423-4609544EBA3E}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Knoth, Gretchen Please stay with the Standard column formatting and order used by MassDOT Highway division. and other agencies using the Standard Specifications. See the Disctrict 6 Joint/Deck Conctract for an example. ITEM #, QUANTITY, ITEM WITH UNIT BID PRICE WRITTEN IN WORDS, UNIT PRICE, AMOUNT Reply:

@Losordo, Ben - I have reverted to the structure as requested, however, I have left column B labeled as "Total Estimated Quantity" as we can't say with certainty that these will be the exact figures. We can, however, use these estimates for the purposes of calculating the overall ceiling price. In my absence over the next few days, please feel free to make edits directly to the workbook.Notes/Comments
100.013*100USE OF HOT BOX TRAILER FOR HOT MIX

AT

PER HOUR

100.1* 1000 BASE LABOR RATE

AT

PER HOUR

106.08* 500 STEEL ARMOR JOINT REMOVED AND DISCARDED

PER FOOT

106.12* 100 BRIDGE CURB REMOVED AND RESET

107.851* 300 SEALING RANDOM CRACKS IN CEMENT CONCRETE

120.1 16 UNCLASSIFIED EXCAVATION

PER CUBIC YARD

127.1* 60 REINFORCED CONCRETE EXCAVATION

127.4* 165 REINFORCED CONCRETE DECK EXCAVATION (FULL DEPTH)

AT

PER SQUARE YARD

127.41* 100 REINFORCED CONCRETE DECK EXCAVATION (PARTIAL DEPTH)

AT PER CUBIC YARD

Location: MBTA
Description : Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations
ITEM #TOTAL ESTIMATED QUANTITYITEM WITH UNIT BID PRICE WRITTEN IN WORDSUNITESTIMATED TOTAL CONTRACT AMOUNT
129.6*1700BRIDGE PAVEMENT EXCAVATION

151 16 GRAVEL BORROW

415.4 8260 BRIDGE PAVEMENT MILLING

451 680 HMA FOR PATCHING

PER TON

452 810 ASPHALT EMULSION FOR TACK COAT

PER GALLON

453 8520 HMA JOINT ADHESIVE

450.601 910 SUPERPAVE Bridge Surface Course – 9.5 – Polymer (SSC-B – 9.5 - P)

AT

PER TON

450.701 70 SUPERPAVE Bridge Protective Course - 9.5 – Polymer (SPC-B - 9.5 - P)

AT

PER TON

482.31* 600 SAWING AND SEALING JOINTS IN ASPHALT PAVEMENT AT BRIDGES

AT

PER FOOT

Location: MBTA
Description : Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations
ITEM #TOTAL ESTIMATED QUANTITYITEM WITH UNIT BID PRICE WRITTEN IN WORDSUNITESTIMATED TOTAL CONTRACT AMOUNT
748.1*2EMERGENCY RESPONSE

EACH

tc={0330AD49-8886-406A-AA96-3FE6DD1DFCCB}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Losordo, Ben - Wouldn't emergency response be billed at their hourly rate below? If so, I would suggest deleting this row. We could request an hourly rate for emergency response outside of normal business hours Reply:

It's per EACH Occurance, just for showing up. The actual work is then paid using the bid items.

From Special Provision 748.1

BASIS OF PAYMENT

Item 748.1 will be paid for at the Contract unit price per Each, which price shall be full compensation for all costs associated with ensuring prompt response to emergency situations and to get equipment to an emergency location in time.

In the event that the Contractor does not satisfy the (4) four hours response time, payment for Emergency Response will be made only at the discretion of the Engineer.

Non-response damages will be assessed in the amount specified under NON-RESPONSE DAMAGES for each assignment the Contractor fails to report as required.

All labor, material and equipment to perform the emergency work will be paid for under the appropriate pay items.

tc={39E6574D-8F20-40E9-9F4C-756EFF5E4201}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Knoth, Gretchen This section is not needed. Potential bidders know that every item includes labor, materials, bonds, etc. Option year prices should be a percentage escalation from base year. These are not tied to any index.

Reply:

Hi @Losordo, Ben - even if that is common industry practice, I recommend retaining this language here in order to clearly state the methodology to be followed.

I've updated the guidance regarding Options Years per your guidance.

cc @O'Connor, Mellissa Reply:

ok Reply:

@Knoth, Gretchen ok, but the escalation factor should be the same for every item. This form gives the option of providing a different escalation factor for every item.

Reply:

@Losordo, Ben - I've updated to table to request the escalation factors by year in cells G63 - I65 below Reply:

perfect. thank you 851.1 75 TRAFFIC CONES FOR TRAFFIC MANAGEMENT

PER DAY

852 400 SAFETY SIGNING FOR TRAFFIC MANAGEMENT

PER SQUARE FOOT

853.8* 75 TEMPORARY ILLUMINATION FOR WORK ZONE

856 250 ARROW BOARD

859 2490 REFLECTORIZED DRUM

866.106 3000 6-IN. WHITE LINE (THERMOPLASTIC)

866.112 500 12-IN. WHITE LINE (THERMOPLASTIC)

867.106 3000 6-IN. YELLOW (THERMOPLASTIC)

908.11* 400 CONCRETE PENETRANT SEALER

PER GALLON

Location: MBTA
Description : Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations
ITEM #TOTAL ESTIMATED QUANTITYITEM WITH UNIT BID PRICE WRITTEN IN WORDSUNITESTIMATED TOTAL CONTRACT AMOUNT
909.3*71RAPID HARDENING CONCRETE FOR REPAIRS

909.4* 162.5 ELASTOMERIC CONCRETE

PER CUBIC FOOT

909.5* 126 RAPID HARDENING CEMENTITIOUS PRODUCTS FOR CONCRETE REPAIRS

AT

PER CUBIC YARD

910.1 8230 STEEL REINFORCEMENT FOR STRUCTURES - EPOXY COATED

AT

PER POUND

912* 430 DRILLING AND GROUTING DOWELS

EACH

964.21* 15000 CONCRETE PROTECTIVE COATING - ELASTOMERIC

964.6* 3000 EPOXY HEALER-SEALER TREATMENT ON BRIDGE DECKS

AT

PER SQUARE YARD

966.1* 15000 MEMBRANE WATERPROOFING FOR BRIDGE DECK REPAIRS (SHEET MEMBRANE)

AT

968.3* 4 BRIDGE DECK DRAIN

PER EACH

Location: MBTA
Description : Scheduled & Emergency Bridge Deck & Joint Repairs at Various Locations
ITEM #TOTAL ESTIMATED QUANTITYITEM WITH UNIT BID PRICE WRITTEN IN WORDSUNITESTIMATED TOTAL CONTRACT AMOUNT
971.2*250MODIFIED ASPHALTIC BRIDGE JOINT SYSTEM

972 150 STRIP SEAL BRIDGE JOINT SYSTEM

972.11* 550 NEOPRENE STRIP SEAL REPLACEMENT

973.2* 1360 PRE-COMPRESSED JOINT SEAL

994.1* 4000 TEMPORARY PROTECTIVE SHIELDING

994.12* 1300 TEMPORARY PROTECTIVE SHIELDING REMOVE AND RESET

AT

PER SQUARE FOOT

**The total contract value is an estimate. Payment will be based on actual work completed.
Option Year 1Option Year 2Option Year 3
ESCALATION FACTOR

tc={B5B0DE43-7592-4224-8097-888779F6ECB6}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

Reply:

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item. ESCALATION FACTOR tc={C28A1C8E-675D-4D7E-A0DD-17D6036F819C}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

Reply:

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item.

tc={5272F766-7F76-4A38-BC82-9B3A048C47EC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

All rows are all-inclusive and include labor and any associated costs.

Base labor rate will only be used for non-bid items ESCALATION FACTOR tc={8B0BDA87-073A-42C0-B794-64E298F87DBC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

Reply:

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item.

tc={0C11064E-9574-4979-A423-4609544EBA3E}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@Knoth, Gretchen Please stay with the Standard column formatting and order used by MassDOT Highway division. and other agencies using the Standard Specifications. See the Disctrict 6 Joint/Deck Conctract for an example. ITEM #, QUANTITY, ITEM WITH UNIT BID PRICE WRITTEN IN WORDS, UNIT PRICE, AMOUNT Reply:

@Losordo, Ben - I have reverted to the structure as requested, however, I have left column B labeled as "Total Estimated Quantity" as we can't say with certainty that these will be the exact figures. We can, however, use these estimates for the purposes of calculating the overall ceiling price. In my absence over the next few days, please feel free to make edits directly to the workbook.Total BASE Contract Price Proposal
(1 Year Term)- 0

@Knoth, Gretchen This section is not needed. Potential bidders know that every item includes labor, materials, bonds, etc. Option year prices should be a percentage escalation from base year. These are not tied to any index.

Hi @Losordo, Ben - even if that is common industry practice, I recommend retaining this language here in order to clearly state the methodology to be followed.

I've updated the guidance regarding Options Years per your guidance.

cc @O'Connor, Mellissa ok

@Knoth, Gretchen ok, but the escalation factor should be the same for every item. This form gives the option of providing a different escalation factor for every item.

@Losordo, Ben - I've updated to table to request the escalation factors by year in cells G63 - I65 below perfect. thank you

All rows are all-inclusive and include labor and any associated costs.

Base labor rate will only be used for non-bid items

@Knoth, Gretchen Please stay with the Standard column formatting and order used by MassDOT Highway division. and other agencies using the Standard Specifications. See the Disctrict 6 Joint/Deck Conctract for an example. ITEM #, QUANTITY, ITEM WITH UNIT BID PRICE WRITTEN IN WORDS, UNIT PRICE, AMOUNT

@Losordo, Ben - I have reverted to the structure as requested, however, I have left column B labeled as "Total Estimated Quantity" as we can't say with certainty that these will be the exact figures. We can, however, use these estimates for the purposes of calculating the overall ceiling price. In my absence over the next few days, please feel free to make edits directly to the workbook.

@Losordo, Ben - Wouldn't emergency response be billed at their hourly rate below? If so, I would suggest deleting this row. We could request an hourly rate for emergency response outside of normal business hours

It's per EACH Occurance, just for showing up. The actual work is then paid using the bid items.

From Special Provision 748.1

BASIS OF PAYMENT

Item 748.1 will be paid for at the Contract unit price per Each, which price shall be full compensation for all costs associated with ensuring prompt response to emergency situations and to get equipment to an emergency location in time.

In the event that the Contractor does not satisfy the (4) four hours response time, payment for Emergency Response will be made only at the discretion of the Engineer.

Non-response damages will be assessed in the amount specified under NON-RESPONSE DAMAGES for each assignment the Contractor fails to report as required.

All labor, material and equipment to perform the emergency work will be paid for under the appropriate pay items.

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item.

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item.

@Losordo, Ben and @O'Connor, Mellissa - I've added in unit pricing for the option years here (we won't determine an overall contract ceiling at this point until we choose to exercise the option year and execute a PO). Let me know if you have any questions/concerns.

@Knoth, Gretchen Instead of new bid prices for every option year, this should be a percentage applied to every item.